NuStar Energy LP

NuStar Energy LP — J.P. Morgan Midwest Energy Infrastructure/MLP 1x1 Forum 2016

29 slides from NuStar Energy LP's conference presentation, Sep 21, 2016

  1. Slide 1: J.P. Morgan Midwest Energy Infrastructure/MLP 1x1 Forum

    Slide 1: J.P. Morgan Midwest Energy Infrastructure/MLP 1x1 Forum

    J.P. Morgan Midwest Energy Infrastructure/MLP 1x1 Forum September 21, 2016 Exhibit 99.1

  2. Slide 2: Forward-Looking Statements

    Slide 2: Forward-Looking Statements

    Forward-Looking Statements 2 Statements contained in this presentation that state management’s expectations or predictions of the future are forward-looking statements. While these forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our curre

  3. Slide 3: NuStar Overview

    Slide 3: NuStar Overview

    NuStar Overview

  4. Slide 4: Two Publicly Traded Companies

    Slide 4: Two Publicly Traded Companies

    Two Publicly Traded Companies 4 2% G.P. Interest in NS IPO Date: 4/16/2001 ~13% L.P. Interest in NS Unit Price (9/19/16): $44.85 Incentive Distribution Rights in NS (IDR) Annualized Distribution/Unit: $4.38 ~13% NS Distribution Take Yield (9/19/16): 9.8% IPO Date: 7/19/2006 Market Capitalization: $3

  5. Slide 5: Resilient and Strong Core Operations, No Matter the Price of a Barrel of Crude

    Slide 5: Resilient and Strong Core Operations, No Matter the Price of a Barrel of Crude

    20 30 40 50 60 70 80 90 100 110 120 0.7 0.8 0.9 1 1.1 1.2 1.3 4/1/2014 11/1/2014 6/1/2015 1/1/2016 C ru d e P ri c e C o v e ra g e R a ti o NS Coverage Ratio Price of Crude One-Times Resilient and Strong Core Operations, No Matter the Price of a Barrel of Crude 5  Although valuations of some MLPs

  6. Slide 6: Large and Diverse Geographic Footprint with Assets in Key Locations

    Slide 6: Large and Diverse Geographic Footprint with Assets in Key Locations

    Large and Diverse Geographic Footprint with Assets in Key Locations Assets:  79 terminals  ~94 million barrels of storage capacity  ~8,700 miles of crude oil and refined product pipelines Corpus Christi, TX – Destination for South Texas Crude Oil Pipeline System St. James, LA – 9.9MM bbls Pt. Tup

  7. Slide 7: Majority of Segment EBITDA Generated by Fee-Based Pipeline and Storage Segments

    Slide 7: Majority of Segment EBITDA Generated by Fee-Based Pipeline and Storage Segments

    48% 50% Percentage of 2015 Segment EBITDA (for the year ended 12/31/15)  Refined Product Pipelines  Crude Oil Pipelines  Ammonia Pipeline  Refined Product Terminals  Crude Oil Storage Fuels Marketing: 2%  Refined Products Marketing, Bunkering and Crude & Fuel Oil Trading Majority of Segment EB

  8. Slide 8: 2016 Guidance Updates

    Slide 8: 2016 Guidance Updates

    2016 Guidance Updates 8 2016 Annual Guidance (2Q Earnings Call1) 2016 Annual Guidance (Revised) 3rd Quarter 2016 Guidance (2Q Earnings Call1) 3rd Quarter 2016 Guidance (Revised) Pipeline Segment EBITDA2 $335 - $355 million $325 - $345 million Lower than 3Q 2015 Lower than 3Q 2015 Storage Segment EBI

  9. Slide 9: Building on Our Strengths - Stable, Diversified Business

    Slide 9: Building on Our Strengths - Stable, Diversified Business

    9 Building on Our Strengths - Stable, Diversified Business Foundation for Future Growth  Contracted fee-based storage and pipeline assets provide stable cash flows  Storage terminals effectively full  ~75% of pipeline revenues are demand-pull - based on refinery/fertilizer plant feedstock supply

  10. Slide 10: Expect ~$180 to $200 Million of Strategic Spending in 2016

    Slide 10: Expect ~$180 to $200 Million of Strategic Spending in 2016

    Expect ~$180 to $200 Million of Strategic Spending in 2016 (Dollars in Millions)  Initial 2016 forecast reduced by approximately 50% - moving forward with best and highest return projects  2016 Total Capital Spending, which includes Reliability Capital, is expected to be in the range of $215 to $2

  11. Slide 11: Pursuing Pipeline and Storage Opportunities

    Slide 11: Pursuing Pipeline and Storage Opportunities

    Pursuing Pipeline and Storage Opportunities 3.8MM bbls 11 Expansion of Ammonia Pipeline System Included in 2016 Spending Guidance Currently Evaluating West Coast Terminal Expansions Construction of ~750M bbls of New Storage at St. James Linden Terminal Expansion Project to Transport LPGs from the U.

  12. Slide 12: No Debt Maturities until 2018

    Slide 12: No Debt Maturities until 2018

    $1,031 $350 $450 $300 $250 $365 $403 $57 $0 $250 $500 $750 $1,000 $1,250 2015 2016 2017 2018 2019 2020 2021 2022 2038- 2041 Receivables Financing Sub Notes GO Zone Financing Senior Unsecured Notes Revolver $810 No Debt Maturities until 2018 (LTD Maturity Profile as of June 30, 2016, Dollars in Milli

  13. Slide 13: Pipeline Segment

    Slide 13: Pipeline Segment

    Pipeline Segment

  14. Slide 14: Pipeline Segment Overview

    Slide 14: Pipeline Segment Overview

    14  2016 segment EBITDA should be lower than 2015 as we expect increased volumes on our refined product pipelines to be offset by lower projected Eagle Ford crude volumes. Pipeline Segment Overview Pipeline Segment EBITDA1 ($ in millions) Pipeline Receipts by Commodity TTM as of 6/30/16 *Other incl

  15. Slide 15: Throughputs in NuStar's South Texas Crude Oil Pipeline System

    Slide 15: Throughputs in NuStar's South Texas Crude Oil Pipeline System

    Throughputs in NuStar’s South Texas Crude Oil Pipeline System 15 South Texas Crude Oil Pipeline System:  2016 guidance at contractual minimums (133.5 Mbpd), upside potential with a crude oil price recovery  Billed customers for the equivalent of 143Mbpd and 142Mbpd in 1Q 2016 and 2Q 2016, respecti

  16. Slide 16: NuStar's South Texas Pipeline Presence

    Slide 16: NuStar's South Texas Pipeline Presence

    Choke Canyon PL – 12” Laredo PL – 8” Dos Laredo – 8” Valley PL – 6”/8”/10” Pettus South – 10” Houston – 12” Pawnee to Oakville PL – 12” Three Rivers Supply – 12” Corpus-Odem-3R – 8” Oakville to Corpus – 16” Second Phase of Expansion – 12” NuStar’s South Texas Pipeline Presence 16

  17. Slide 17: Working with Pemex to Develop Project to Transport LPGs into Northern Mexico

    Slide 17: Working with Pemex to Develop Project to Transport LPGs into Northern Mexico

    Working with Pemex to Develop Project to Transport LPGs and Refined Products from the U.S. Into Northern Mexico Laredo PL – 8” Valley PL – 6”/8”/10” Houston – 12” 17  Delays due to organizational changes within Pemex  Originally planned $125 million spend in 2016. Due to project delay, spending re

  18. Slide 18: NuStar Expanding Mid-Continent Pipeline and Terminal Network

    Slide 18: NuStar Expanding Mid-Continent Pipeline and Terminal Network

    NuStar Expanding Mid-Continent Pipeline and Terminal Network  Several projects have been completed or are under development with a key customer to increase distillate and propane supply throughout the Upper Midwest for an investment of approximately $70 million  Capital investments to be backed by

  19. Slide 19: Storage Segment

    Slide 19: Storage Segment

    Storage Segment

  20. Slide 20: Storage Segment Overview

    Slide 20: Storage Segment Overview

     2016 segment EBITDA expected to benefit from higher renewal rates and increased utilization, which may be partially offset by lower expected Eagle Ford throughput volumes into our Corpus Christi North Beach Terminal as a result of decreased Eagle Ford shale production. 1 – Please see slides 27-29

  21. Slide 21: Piney Point Terminal Back in Service

    Slide 21: Piney Point Terminal Back in Service

     Piney Point Terminal  5.4 million-barrel storage facility located in Piney Point, Maryland, along the Potomac River  Primary storage capabilities include gasoline, distillates and other clean products  Reactivated due to favorable market economics  Recently signed up storage commitments for 1.

  22. Slide 22: Majority of St. Eustatius Terminal Tankage Recently Leased through 1st Quarter of 2020

    Slide 22: Majority of St. Eustatius Terminal Tankage Recently Leased through 1st Quarter of 2020

    22 Majority of St. Eustatius Terminal Tankage Recently Leased through 1st Quarter of 2020  St. Eustatius Terminal  14.4 million-barrel storage facility located on the island of St. Eustatius in the Caribbean  Primary storage capabilities include crude oil and fuel oil (as well as other refined pr

  23. Slide 23: Fuels Marketing Segment

    Slide 23: Fuels Marketing Segment

    Fuels Marketing Segment

  24. Slide 24: Fuels Marketing Segment Benefits Base Business

    Slide 24: Fuels Marketing Segment Benefits Base Business

    Fuels Marketing Segment Benefits Base Business  Segment is composed of:  Refined Products Marketing  Primarily butane blending, which is a consistent and low risk business  Bunkering  Crude & Fuel Oil Trading  Fuels Marketing Segment currently pays Storage Segment approximately $26 million in

  25. Slide 25: Appendix

    Slide 25: Appendix

    Appendix

  26. Slide 26: Capital Structure

    Slide 26: Capital Structure

    Capital Structure (as of June 30, 2016, Dollars in Millions) $1.5 billion Credit Facility $1,031 NuStar Logistics Notes (4.75%) 250 NuStar Logistics Notes (4.80%) 450 NuStar Logistics Notes (6.75%) 300 NuStar Logistics Notes (7.65%) 350 NuStar Logistics Sub Notes (7.625%) 403 GO Zone Bonds 365 Recei

  27. Slide 27: Reconciliation of Non-GAAP Financial Information

    Slide 27: Reconciliation of Non-GAAP Financial Information

    Reconciliation of Non-GAAP Financial Information 27 2008 2009 2010 2011 2012 2013 2014 2015 Operating income 135,086$ 139,869$ 148,571$ 146,403$ 158,590$ 208,293$ 245,233$ 270,349$ Plus depreciation and amortization expense 50,749 50,528 50,617 51,165 52,878 68,871 77,691 84,951 EBITDA 185,835$ 190,

  28. Slide 28: Reconciliation of Non-GAAP Financial Information (continued)

    Slide 28: Reconciliation of Non-GAAP Financial Information (continued)

    Reconciliation of Non-GAAP Financial Information (continued) 28 Pipeline Segment Storage Segment Fuels Marketing Segment Pipeline Segment Storage Segment Fuels Marketing Segment Projected operating income $ 250,000 - 265,000 $ 195,000 - 210,000 $ 5,000 - 20,000 $ 240,000 - 255,000 $ 215,000 - 230,00

  29. Slide 29: Reconciliation of Non-GAAP Financial Information (continued)

    Slide 29: Reconciliation of Non-GAAP Financial Information (continued)

    Reconciliation of Non-GAAP Financial Information (continued) 29 Jun. 30, 2014 Sept. 30, 2014 Dec. 31, 2014 Mar. 31, 2015 Jun. 30, 2015 Sept. 30, 2015 Dec. 31, 2015 Mar. 31, 2016 Jun. 30, 2016 Income from continuing operations (139,637)$ (116,202)$ 214,169$ 298,298$ 295,436$ 301,335$ 305,946$ 236,222

Source: SEC EDGAR · 8-K filed Sep 21, 2016

More decks from NuStar Energy LP