  1. Slide 1: Investor Update – Plant

    Investor Update – Plant December 2013

  2. Slide 2: The Mollehuaca Gold Plant

    The Mollehuaca Gold Plant October 2013 crushing circuit carbon-in-leach (CIL) circuits flotation circuit 2

  3. Slide 3: Final construction & commissioning trials (September 2013)

    CIL ‘B’ circuit Carbon-in-leach circuits and ball mill Final construction & commissioning trials (September 2013) Flotation circuit New ball mill being installed 3

  4. Slide 4: Construction of the tailings field (October 2013)

    Construction of the tailings field (October 2013) 4