  1. Slide 1: Hunter Valley Operations Community Consultative Committee Meeting

    HUNTER VALLEY OPERATIONS Community Consultative Committee Meeting – 24 November 2016 Agenda Items 1. Welcome: Housekeeping, Emergency Procedures 2. Apologies 3. Declaration of pecuniary interests/conflicts of interest 4. Correspondence 5. Confirmation of the previous meeting’s minutes 6. Matters ari

  2. Slide 2: Housekeeping, Muster Area & Safety Share

    Housekeeping, Muster Area & Safety Share HVO CCC Presentation November 2016

  3. Slide 3: Business Arising from July and October CCC Minutes

    Business Arising from July and October CCC Minutes Action Action Action Proposed Accountability Response Proposed By 1 H.Jenkins Travis to provide further breakdown of contractor workforce. Travis Bates Coal and Allied to allow an additional week in sending out business 2 H.Jenkins Daniel Solomon On

  4. Slide 4: Business Arising from July CCC Minutes

    Business Arising from July CCC Minutes Feral Pest Management Update Vertebrate Pest Post July 16 YTD Since the July CCC meeting HVO Deer - 1 has undertaken the following vertebrate Feral Cat 4 4 pest management activities Feral Pig 91 162 • a 4 week 1080 baiting program Fox 3 5 targeting wild dogs a

  5. Slide 5: Inter-Agency Audit program: Dam Safety

    Inter-Agency Audit program: Dam Safety • Joint audit occurred between 3rd - 4th November • Audit comprised NSW EPA, Resources Regulator and DPE • Audit of HVO under the Dams at NSW Mines Audit Program • Audit report from the NSW EPA will be available to the public via the NSW EPA Website HVO Indepen

  6. Slide 6: Update on Hunter Valley Operations

    Update on Hunter Valley Operations Update on Hunter Valley Operations Mark Townson Mining Manager HVO CCC Presentation November 2016

  7. Slide 7: 2016 Mine Operations

    Managed by Rio Tinto Coal Australia HOWICK: COAL PREP PLANT ms nf Pry Z HUNTER VALMEY 2 COAL PREBSPLANT fie “ j De, ‘ \ { 7 Ss = oad —— = te os s \ “we * i= a CARRINGTON) poe ~ PIT a .Y et ikl pase Neko Aimy , wivee 4 \"y y " NORTH: ; ) ANILINGS DAM. coyiay LANDS uc ie tissoe oT ‘ 1 ] Yr RIVERVIEW P

  8. Slide 8: 2016 Rehabilitation Progress

    2016 Rehabilitation Progress Planned Rehab 69.1 ha Seeded/Claimed YTD 51.7ha HVO CCC Presentation November 2016

  9. Slide 9: HVO South EIS Overview

    HVO South EIS Overview HVO South EIS Overview HVO CCC Presentation November 2016

  10. Slide 10: HVO South Modification 5 Environmental Assessment Report

    HVO South Modification 5 Environmental Assessment Report November 2016

  11. Slide 11: Overview

    2 Overview • A modification is proposed to the Hunter Valley Operations South development consent PA 06_0261. • An Environmental Assessment Report (EAR) that considers the social, environmental and economic impacts and benefits of the proposal is expected to be available for public exhibition early

  12. Slide 12: Timeline

    OVULLON] Timeline Consultation and prepare Environmental Assessment (EA) A draft EAis prepared in accordance with the relevant policies. Lodgement of application & EA Coal & Allied will lodge the application with the EA to the Department of Planning and Environment. Public Exhibition of EA The EAwil

  13. Slide 13: Proposed Modification

    4 Proposed Modification • Mining depth extension in Riverview Pit from Vaux to Bayswater seam. • Mining depth extension in South Lemington Pit 2 from Bowfield to Vaux seam. • Increase in maximum height of Cheshunt overburden emplacement from RL155 to 240 m AHD in the northern section only. • Ability

  14. Slide 14: Proposed Modification: Mine sequencing

    OJULLON] Proposed Modification = m COAL Mine sequencing ALLIED Hunter Valley Operations South Modification 5 ee Pl te

  15. Slide 15: Proposed Modification

    6 Proposed Modification • Mine plan review process that considered avoidance and minimisation of environmental impacts. • No extension of State-approved disturbance footprint. • Micro-relief incorporated into overburden emplacement area. • Overburden height increased to RL240M in Northern Cheshunt.

  16. Slide 16: Proposed Modification Indicative Final Landform

    7 Proposed Modification Indicative Final Landform

  17. Slide 17: Proposed Modification Indicative Final Landform

    8 Proposed Modification Indicative Final Landform

  18. Slide 18: Proposed Modification Indicative Final Landform

    9 Proposed Modification Indicative Final Landform

  19. Slide 19: Proposed Modification Indicative Final Landform

    10 Proposed Modification Indicative Final Landform

  20. Slide 20: Visual Amenity

    11 Visual Amenity • Moderate impacts in the short to medium term to the east until rehabilitation can be completed in nominally Year 2022 (Stage 2). • Approx 700m of the existing rehabilitated face of the emplacement area seen from approx. 2.6km to horizon Shearers Lane at Maison Dieu will be retain

  21. Slide 21: Visual Amenity Mitigation

    12 Visual Amenity Mitigation • The emplacement of overburden has been designed to the northern end of Cheshunt Pit to preserve the viewshed through to the Wollemi National Park. • The current setback distance from Maison Dieu is maintained Final landform behind (approx. 2.6km). ridgeline • Overburde

  22. Slide 22: Visual Amenity Additional Viewshed of Emplacement

    13 Visual Amenity Additional Viewshed of Emplacement

  23. Slide 23: Cheshunt Overburden Emplacement – Build Concept and Management Principles

    Cheshunt Overburden Emplacement – Build Concept and Management Principles To Maison Dieu

  24. Slide 24: Cheshunt Overburden Emplacement – Build Concept and Management Principles

    15 Cheshunt Overburden Emplacement – Build Concept and Management Principles Hauling ramp alignment Material placement First lift in the overburden sequenced in areas emplacement begins with adjacent to ramps to outer edge to provide minimise exposure to truck sound barrier while noise while hauling

  25. Slide 25: Cheshunt Overburden Emplacement – Build Concept and Management Principles

    Cheshunt Overburden Emplacement – Build Concept and Management Principles Second lift in the First lift progresses inwards emplacement begins at after outer protection is outer edge and progresses provided. inwards.

  26. Slide 26: Cheshunt Overburden Emplacement – Build Concept and Management Principles

    Cheshunt Overburden Emplacement – Build Concept and Management Principles Emplacement complete

  27. Slide 27: Visual Amenity Interactive Application

    18 Visual Amenity Interactive Application Following the last HVO CCC, it was agreed to modify the HVO South flyover to show earlier stages plans rather than Stage 4 only.

  28. Slide 28: Noise

    19 Noise Noise and vibration study in accordance with NSW Industrial Noise Policy and Voluntary Land Acquisition and Mitigation Policy (VLAMP) • No additional properties are significantly impacted due to the proposed modification. • Fourteen properties not currently entitled to noise mitigation in a

  29. Slide 29: Noise Mitigation

    20 Noise Mitigation • HVO will progressively attenuate all the haul truck fleet to minimise noise impacts. • Continued operational management measures such as the relocation or shutting down of equipment during adverse weather conditions. • Haul roads to the proposed higher emplacement area to be co

  30. Slide 30: Noise Services Road Closure

    21 Noise Services Road Closure Noise

  31. Slide 31: Air Quality

    22 Air Quality Air quality and greenhouse gas assessment in accordance with NSW Approved Method and Voluntary Land Acquisition and Mitigation Policy. • Similar air quality conditions modelled for Maison Dieu and Jerrys Plains as what is already approved for the existing operation. The proposal will

  32. Slide 32: Air Quality Mitigation

    23 Air Quality Mitigation Continued implementation of air quality management plan, including: • Use of water carts to manage wheel generated dust. • Altered or reduced operations in periods of high winds / elevated PM10. • Use of lower / more protected dumping locations during adverse conditions. •

  33. Slide 33: Noise and Air Quality modelling

    24 Noise and Air Quality modelling

  34. Slide 34: Groundwater

    25 Groundwater A groundwater assessment was undertaken against the Aquifer Interference Policy including a groundwater model peer reviewed by Dr Frans Kalf. • Groundwater take from Permian, alluvium and surface aquifers within previous predicted peak takes. • No private bores will be affected by >2m

  35. Slide 35: Surface Water

    26 Surface Water A surface water assessment determined: • No extension of State-approved disturbance footprint. • HVO South will not increase the cumulative impacts of salinity within the Hunter River due to continued participation in the HRSTS. • Any water taken from the Hunter River Regulated Wate

  36. Slide 36: Ecology and Cultural Heritage

    27 Ecology and Cultural Heritage • Proposal limited to within existing State-approved disturbance footprint. • No additional impacts to the ecology or heritage features.

  37. Slide 37: Socio-economic

    28 Socio-economic • Sustains mine employment at current levels and generates additional economic activity including $243 million in royalties and $160 million in taxes. • It does not result in social impacts arising from workforce influx, population change and associated impacts on infrastructure.

  38. Slide 38: Feedback

    OVULLONY Feedback 29

  39. Slide 39: Visual Amenity Rehabilitation progression

    30 Visual Amenity Rehabilitation progression – nominally 2019

  40. Slide 40: Visual Amenity Rehabilitation progression

    31 Visual Amenity Rehabilitation progression – nominally 2022

  41. Slide 41: Cultural Heritage Management

    Cultural Heritage Management Cultural Heritage Management HVO CCC Presentation November 2016

  42. Slide 42: Hunter Valley Operations Cultural Heritage Management

    Cultural Heritage Management Hunter Valley Operations Cultural Heritage Management Joel Deacon Specialist, Cultural Heritage NSW

  43. Slide 43: Cultural Heritage Management: Legislation

    Cultural Heritage Management Legislation • Manage both Aboriginal & non-Aboriginal heritage • Aboriginal heritage regulated under National Parks & Wildlife Act 1974 (under review) • Non-Aboriginal heritage regulated under Heritage Act 1977 • Specific operational compliance for both conditioned throu

  44. Slide 44: Cultural Heritage Management: Consultation

    Cultural Heritage Management Consultation • Aboriginal heritage management program developed in consultation with Aboriginal Cultural Heritage Working Group (CHWG) comprised of Aboriginal community stakeholders • CHWG stakeholders participate in all aspects of cultural heritage assessment (surveys),

  45. Slide 45: Cultural Heritage Management: Aboriginal Heritage

    Cultural Heritage Management Aboriginal Heritage • Managed under two approved Aboriginal Heritage Management Plans – one for HVO South, one for HVO North • Ensures compliance with development consents, legislation & RTCA standards – Zone Plan guides management • HVO has been subject of archaeologica

  46. Slide 46: Cultural Heritage Management

    Cultural Heritage Management

  47. Slide 47: Cultural Heritage Management

    Cultural Heritage Management

  48. Slide 48: Cultural Heritage Management

    Cultural Heritage Management

  49. Slide 49: Cultural Heritage Management

    Cultural Heritage Management

  50. Slide 50: Cultural Heritage Management: Non-Aboriginal Heritage

    Cultural Heritage Management Non-Aboriginal Heritage • Numerous locally significant non-Aboriginal sites located at HVO • Some listed on Singleton Council Local Environmental Plan, one – Chain of Ponds Inn – on State Heritage Register • Non-Aboriginal heritage surveyed & assessed for any new develop

  51. Slide 51: Cultural Heritage Management

    Cultural Heritage Management

  52. Slide 52: Cultural Heritage Management: Chain of Ponds Inn

    Cultural Heritage Management Chain of Ponds Inn • Located on Old New England Highway, halfway between Singleton & Muswellbrook • Inn dates from 1840s & post-dates the lock up • Stable block also part of complex • Listed on State Heritage Register • External & internal (including asbestos removal) cl

  53. Slide 53: Cultural Heritage Management

    Cultural Heritage Management

  54. Slide 54: Directions to Chain of Ponds Inn

    COAL »> ALLIED - Right onto Old Managed by Rio i : a New England Highway (at Chain of Ponds Inn Moto - X sign) located c.500m past 4, : Liddell Coal % E entrance om Ravensworth Left onto New England Hwy Right onto Lemington Rd

  55. Slide 55: Park up areas

  56. Slide 56: Community Representative Feedback

    Community Representative Feedback Community Representative Feedback HVO CCC Presentation November 2016

  57. Slide 57: General Business

    General Business General Business HVO CCC Presentation November 2016

  58. Slide 58: Date & Time of Next Meeting

    Date & Time of Next Meeting 2017 Calendar March 23, 2017 July 20, 2017 November 16, 2017 HVO CCC Presentation November 2016