Sadbhav Infrastructure Project Ltd. · NSE:SADBHIN

Sadbhav Infrastructure Project — Investor Presentation (November 2015)

34 slides from Sadbhav Infrastructure Project's investor presentation, November 2015

  1. Slide 1: Sadbhav Infrastructure Project Limited

    Sadbhav Infrastructure Project Limited November 2015

  2. Slide 2: Disclaimer

    Disclaimer This presentation and the accompanying slides (the “Presentation”),which have been prepared by Sadbhav Infrastructure Project Limited (SIPL) (the “Company”), have been prepared solely for information purposes and do not constitute any offer, recommendation or invitation to purchase or sub

  3. Slide 3: Overview – Sadbhav Infrastructure Project Limited

    Overview – Sadbhav Infrastructure Project Limited SIPL is the only listed Road & Highways BOT company in India with a portfolio of 11 projects  Promoted by Sadbhav Engineering Limited (SEL) in 2007 to operate Road BOT projects for Sadbhav Group  Owns a project portfolio consisting of eleven BOT pr

  4. Slide 4: Key Management Personnel

    Key Management Personnel Board of Directors Mr. Vishnubhai M Patel Mr. Vasistha Patel (Chairman & Non-Executive Director) (Managing Director) Mr. Shashin V Patel Mr. Nitin R Patel (Non-Independent & Non-Executive Director) (Non-Independent & Non-Executive Director) Mr. Sandip V Patel, Mr. Mirat N Bh

  5. Slide 5: Presence of Marquee Investors

    Presence of Marquee Investors Shareholding Pattern as on 30th September 2015 Strong Institutional Presence Category No. of shares % Promoter Group 243,637,647 69.2% Public Shareholding 108,587,569 30.8% Institutions 27,516,008 7.8% DIIs 16,511,463 4.7% FIIs 11,004,545 3.1% Non-Institutions 81,071,56

  6. Slide 6: Operating Assets

    Operating Assets Particulars ARRIL AJTL NSEL HYTPL BHTPL Current Stake 93.99% 99.99% 99.99% 99.99% 76.99% Proposed Stake 99.99%1 99.99% 99.99% 99.99% 76.99% Project Details Project Type Toll Toll Annuity Toll Toll State Gujarat Maharashtra Maha/MP Telangana Karnataka JV Partner Patel Infra N.A N.A N

  7. Slide 7: Operating Assets

    Operating Assets Particulars RPTPL MBCPNL DPTL Current Stake 99.99% 77.82% 72.80% Proposed Stake 99.99% 78.19%1 100.00% Project Details Project Type Toll Service Fee Toll State Haryana Maharashtra Maharashtra SREI Infra and SREI Sahaj e-village JV Partner N.A SEL Limited Client NHAI Govt. of Maha. N

  8. Slide 8: Under Construction Assets

    Under Construction Assets Particulars SUTPL BRTPL RHTPL Current Stake 99.99% 99.99% 99.99% Project Details Proposed Stake 99.99% 99.99% 99.99% Project Type Toll Toll Toll State Rajasthan Rajasthan Haryana Client NHAI NHAI NHAI Lane kms 317.2 349.0 395.2 Concession Start Apr-13 Oct-13 Dec-13 Concessi

  9. Slide 9: Sustained Growth in Asset Base

    Sustained Growth in Asset Base Yearly Operational Assets Addition RHTPL SUTPL BRTPL RPTPL RPTPL SUTPL MBCPNL* MBCPNL RPTPL BHTPL BHTPL BHTPL MBCPNL HYTPL HYTPL HYTPL BHTPL DPTL DPTL DPTL DPTL HYTPL NSEL NSEL NSEL NSEL NSEL DPTL MNEL MNEL MNEL MNEL MNEL MNEL NSEL AJTL AJTL AJTL AJTL AJTL AJTL AJTL AR

  10. Slide 10: Well Positioned to Capture Growth in the Sector

    Well Positioned to Capture Growth in the Sector 1 Sizeable and diverse 2 portfolio with majority Integrated structure with presence across the entire projects operational road sector value chain Focused strategy 4 3 Projects located in high as roads & highways growth states, on important BOT player

  11. Slide 11: Sizeable and Diverse Portfolio with Majority Projects Operational

    Sizeable and Diverse Portfolio with Majority Projects Operational As of Sept 30 2015, SIPL’s projects have an average residual life of 18 years and 1 months(1), thereby ensuring stable revenues and cash flows. A diversified portfolio of projects (incl MBCPNL) provides higher growth visibility going

  12. Slide 12: Integrated Structure

    Integrated Structure Strong execution capabilities demonstrated by completion of 4 out of 6 operational projects ahead of scheduled CoD In-house Capabilities Across the Roads Value Chain Efficient IT Infrastructure Ensuring Efficiency in Toll Collection • In-house financial and traffic estimates of

  13. Slide 13: Projects Located in High Growth States, on Important Corridors

    Projects Located in High Growth States, on Important Corridors Presence in high growth states where GDP is greater than average India’s GDP by 50-170 bps thereby ensuring high industrial growth providing sustainable traffic , high willingness to pay & better administration India Project Cost by Clie

  14. Slide 14: Focused Strategy as a Roads & Highways BOT Player Only

    Focused Strategy as a Roads & Highways BOT Player Only Single-industry focus combined with a rational bidding strategy has driven growth for SIPL Focused Strategy Stable Growth Track Record Focus on BOT roads and highways  Lane Kms Operational Projects (1) Integrated structure  4 5 7 9 9 Alignment

  15. Slide 15: Toll Collection Trend

    Toll Collection Trend

  16. Slide 16: Toll Collection

    Toll Collection INR mn Ahmedabad Ring Road Infrastructure Limited (ARRIL) (INR mn) 250 Quarter 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 % rise 200 June 147.1 173.3 183.6 183.0 188.4 222.2 17.9% 150 Sept 139.7 164.8 163.9 175.6 202.7 212.5 4.8% 100 Dec 169.9 194.6 179.3 188.5 223.0 50 Mar 177.

  17. Slide 17: Toll Collection

    Toll Collection Bijapur Hungund Tollway Pvt Limited (BHTPL) (INR mn) INR mn Quarter 2011-12 2012-13 2013-14 2014-15 2015-16 % rise 300 June - 164.6* 243.6 255.2 284.2 11.4% 200 Sept - 232.7 236.3 259.6 281.6 8.5% Dec - 227.6 231.0 254.6 100 Mar - 237.6 238.6 273.9 - Total - 862.5 949.5 1,043.3 June

  18. Slide 18: Toll Collection

    Toll Collection INR mn Maharashtra Border Check Post (MBCPNL) (INR mn) 400 Quarter 2011-12 2012-13 2013-14 2014-15 2015-16 % rise 300 June 16.7* 196.1 340.7 73.7% 200 Sept 63.1 222.0 366.9 65.3% 100 Dec 76.2 237.7 Mar 146.2 260.6 - June Sept Dec Mar Total 302.2 916.4 2010-11 2011-12 2012-13 2013-14

  19. Slide 19: Financials

    Financials

  20. Slide 20: Standalone Financials

    Standalone Financials Balance Sheet (INR mn) H1 FY16 FY15 FY14 Income Statement (INR mn) H1 FY16 FY15 FY14 Share Capital 3,522.3 3,109.6 282.6 Income from Operations 132.6 701.1 911.8 Reserves & Surplus 8,456.7 5,326.3 8,036.0 Other Income 264.7 372.0 246.6 Net Worth 11,979.0 8,435.9 8,318.6 Total I

  21. Slide 21: Consolidated Financials

    Consolidated Financials Balance Sheet (INR mn) H1 FY16 FY15 FY14 Income Statement (INR mn) H1 FY16 FY15 FY14 Share Capital 3,522.3 3,109.6 282.6 Income from Operations 2,736.5 5,003.0 3,744.0 Reserves & Surplus 7,632.8 4,699.5 8,265.9 Other Income 148.5 285.9 215.9 Net Worth 11,155.1 7,809.1 8,548.5

  22. Slide 22: Annexure

    Annexure

  23. Slide 23: ARRIL

    ARRIL • Located around Ahmedabad city in circular pattern just 10 kms away from the state capital Gandhinagar Location • It serves as a by-pass road and crosses 19 major radial roads of the city • Provides interstate connectivity between Gujarat and Maharashtra, Rajasthan and Madhya Pradesh • Connec

  24. Slide 24: AJTL

    AJTL  Project road is located in the heart of Maharashtra wherein Section-I (50 kms) starts from Aurangabad airport and ends at Jalna by-pass. Location Section II of the project (16 kms) starts from Zalta by-pass and ends at Beed by-pass  Connectivity to vast industry hinterland area viz, Aurangab

  25. Slide 25: HYTPL

    HYTPL • Starts at Hyderabad and ends near Raigiri at the junction of Yadagirigutta Road Location • It is on of the busiest sections of NH-202, carries both local and inter-state traffic • An important link connecting highly industrialized cities Hyderabad & Warangal which attracted most of the traff

  26. Slide 26: BHTPL

    BHTPL • Project is part of the Bijapur-Hungund section of NH- 13. The entire project is located in the state of Karnataka • It caters to North-South traffic, originating from Bengaluru to Delhi Location • On project highway about 90% of the traffic is single journey mainly long distance through traf

  27. Slide 27: RPTPL

    RPTPL • Project is part of the Rohtak-Panipat section of NH-71A. The entire project is located in the state of Haryana NH-1 Location • It caters to long distance traffic, originating from IOC refinery Textile Cluster Rajasthan, Maharashtra, Gujarat to Northern states like Punjab, J & K, Haryana and

  28. Slide 28: MBCPNL

    MBCPNL • MBCPNL, first of its kind project in India has 22 Border check post located around Maharashtra state with a objective to facilitates RTO Location checks, sales tax and excise clearances, weighment of vehicles and IT support to ensure that there are no delays or tax leakages • Out of the 22

  29. Slide 29: MBCPNL: Services Offered

    MBCPNL: Services Offered Services Electrical & Support Road works Computer works Miscellaneous works Electronic equipment infrastructure Design & development Installation and Development of Development of lighting Landscaping and of entry and exit points maintenance of various necessary infra. for t

  30. Slide 30: DPTL

    DPTL • The project road starts from MP/MH Border & ends at Dhule. It is a part of NH-3 (AB Road) which connects Agra to Mumbai. Major Location towns/cities enroute in DPTL area are Palasner, Sangvi, Shirpur, Varshi, Nardana, Songir and Dhule • Major highways NH-3 and NH-6 intersect at Dhule. NH-6 se

  31. Slide 31: SUTPL

    SUTPL Key Description of the Project Stretch NH-8 leading to New • Project is part of the Shrinathji-Udaipur section Delhi of NH-8. The entire project is located in the Project Rajsamand – Major Marble state of Rajasthan. Length of the project is ~79 Cluster in India kms • The project is located at

  32. Slide 32: BRTPL

    BRTPL Key Description of the Project Stretch Textile Hub • Project is part of the Bhilwara-Rajsamand Project / section of NH-758. The entire project is Major Marble Clusters in Location located in the state of Rajasthan Rajasthan (Around 20% of India’s Marble reserve) • The total length of the stret

  33. Slide 33: RHTPL

    RHTPL Key Description of the Project Stretch • Project is part of the Rohtak-Hissar Project / section of NH-10. The entire project is HSIIDC Industrial Area Location located in the state of Haryana • The total length of the stretch is 83 km Proposed International Cargo Terminal Industrial Modern Tow

  34. Slide 34: Thank You

    Thank You 34