Avrupa Minerals Ltd. · TSXV:AVU

Avrupa Minerals — Corporate Update (August 2012)

11 slides from Avrupa Minerals's corporate update, August 2012

  1. Slide 1: Alvalade Joint Venture

    AVRUPA MINERALS TSX.V: AVU ‘ALVALADE JO JOINT: w /ENTURE =f gibcran pyrite Beit” Bor tugal f - adoe st 20,2) up. — Ls a <o

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements Some of the statements contained in this presentation are forward-looking statements. Forward- looking statements are not historical facts and are subject to a number of risks and uncertainties beyond the Company's control, including, but not exclusively, statements regard

  3. Slide 3: Alvalade JV – project update

    Alvalade JV – project update Phase 1 drilling completed • 8 holes and 3,264 meters in 3 target areas Historic core re-logged and sampled • 190 holes, 51,286 meters re-logged • 881 samples collected from re-logged core TSX.V: AVU 3

  4. Slide 4: Alvalade JV – project update

    Alvalade JV – project update TSX.V: AVU 4

  5. Slide 5: Alvalade JV – Drilling

    Alvalade JV – project update Drilling • Phase 1 completed, 971 samples collected over 3,266 meters drilled in three separate target areas • Full geochemical results pending • Detailed drill logging completed • Alteration and stockwork quartz veining observed in 7 of 8 holes • Geo-structural mineral

  6. Slide 6: Historic drill hole re-logging and sampling

    Alvalade JV – project update Historic drill hole re-logging and sampling • 190 holes, 51,286 meters re-logged • 881 samples collected from re-logged core • District-wide results aid in building geo-structural targeting model • Many holes contained mineralization that was never sampled or followed-up

  7. Slide 7: Aldeia dos Elvas

    Alvalade JV – Aldeia dos Elvas area TSX.V: AVU 7

  8. Slide 8: Azinheira dos Barros

    Alvalade JV – Azinheira dos Barros area TSX.V: AVU 8

  9. Slide 9: Monte da Bela Vista

    Alvalade JV – Monte da Bela Vista area TSX.V: AVU 9

  10. Slide 10: Alvalade JV – near future

    Alvalade JV – near future Geochemical results • Full results expected by mid-September • Will be used to delineate follow-up drill targets in all three Phase 1 areas Geological mapping • Should be completed in all outcrop areas of the JV by early September • New targets being developed in the Caveir

  11. Slide 11: Alvalade JV – near future: Phase 2 drilling

    Alvalade JV – near future Phase 2 drilling • Targeting and planning underway • Budget for up to 3500-3800 meters more drilling in Phase 2, including pre-collar of Tertiary cover • Five new target areas already selected, with more in the pipeline • Planned start-up in mid-September TSX.V: AVU 11

Avrupa Minerals — Corporate Update (August 2012) on 6ix