Petrohawk Energy — Investor Day (March 2008)
86 slides from Petrohawk Energy's investor day presentation, Mar 12, 2008
Slide 1: Analyst Day 2008
Exhibit 99.1 ANALYST DAY 2008
Slide 2: Core Resource Areas
Core Resource Areas Elm Grove / Terryville / Fayetteville Shale 72% of Current Production 69% of Proved Reserves 87% of 2008 Capital Budget 90% of Future Drilling Locations 96% of Total Resource Potential Petrohawk Today Resource-style tight gas focus: conventional and unconventional – 1.1 Tcfe of P
Slide 3: High Potential Core Assets
High Potential Core Assets (1) Based on Petrohawk estimates of risked potential including proved and non-proved locations and reserves. (1) Concentrated upside in three core resource areas Stable proved reserve base in Western Region Total upside significantly above current valuation Approx. Net Acr
Slide 4: Undervalued Resource Company
EV / 2008E EBITDA (1) Price / 2008E CFPS (1) EV / Latest Daily Production ($/Mcfe/d) (2) EV / Proved Reserves ($/Mcfe) (2) Undervalued Resource Company 7.5x 11.6x 12.3x 14.0x 14.3x 15.1x 15.7x 0.0x 3.0x 6.0x 9.0x 12.0x 15.0x 18.0x HK RRC SWN KWK DPTR UPL SD EV/EBITDA 6.3x 7.3x 11.1x 12.4x 12.9x 16.4
Slide 5: Natural Gas Companies are On the Move
Natural Gas Companies are On the Move
Slide 6: Q4 2007 Operating Cost Comparison
Q4 2007 Operating Cost Comparison High Price Realizations (1) Gas: 103% NYMEX / Oil: 97% NYMEX Low-Cost Operator (1) Based on Q4 realized prices. Gas prices include NGLs. $0.00 $1.00 $2.00 $3.00 UPL SWN HK RRC SD DPTR KWK $0.00 $1.00 $2.00 $3.00 HK FST XTO CRK SFY SM XEC COG EAC WLL PXP $0.92 Resour
Slide 7: Focus on Margins
Focus on Margins @$8.00 Petrohawk has continually posted improved cash margins In 2008, HK can achieve over 50% cash margins at under $6.50 gas Excludes one-time severance cost associated with the Gulf Coast divestiture. (1) @$7.00 LOE + Workover Taxes - other Gathering / Trans G&A Interest Cash Mar
Slide 8: 2007 Proved Reserves
Proved Reserves (Bcfe), SEC Pricing PV-10 Value ($ millions), SEC Pricing PUD Reserves 2007 Proved Reserves Other 337 / 32% Core 725 / 68% Other 99 / 21% Core 356 / 79% SEC Pricing (as of 12/31/07): Oil - $95.98/bbl ($92.50 Posted); Gas - $6.80/MMbtu Note: Reserves per NSAI as of 12/31/07; PV10 is p
Slide 9: Proved Reserves: Growth and Improved Quality
375 116 273 1,000 1,200 Production Divestments Adds + Revisions Proved Reserves: Growth and Improved Quality
Slide 10: 2008 Capital Budget
2008 Capital Budget $800 million Core Expansion – 90% operated – ~650 total gross wells – 87% allocated to Core Resource Areas Core Areas 87% $692 MM Non-Core Areas 13% $108 MM Drill & Complete 87% Seismic 1% Land 2% Facilities 4% Recompletions 6% PUD 35% Non-PUD 65%
Slide 11: Operated Rigs
21 Operated Rigs – Fayetteville ramping up to 7 rigs Improvement based on drilling efficiencies – Twelve-rig program planned for Elm Grove and Terryville Horizontal program Downspacing + expansion Additional zone exploration Fayetteville 34% Terryville 15% Other 13% Elm Grove 38% 2008 Capital Budget
Slide 12: 2008 Drilling Plan: Elm Grove Field Overview
2008 Drilling Plan $293 million ~140 operated wells ~50 non-operated wells 20 acre downspacing 20 operated horizontal wells – Build on recent Taylor Sand success • 10 horizontal wells in Taylor • 10 Davis Sand wells Developing Haynesville Shale play Elm Grove Field Overview 90% % Operated 2008 Budge
Slide 13: Elm Grove: Reserve and Production Summary
Elm Grove: Reserve and Production Summary Reserves YE 2006 to YE 2007: – Increased from Bcfe to Bcfe for 21% YOY Growth Daily Production Full Year 2006 to Full Year 2007: – Increased from MMcfe/d to MMcfe/d for 22% YOY Growth 2008E Proved Reserves Net Production Reserves (Bcfe) Production (Mmcfe/d)
Slide 14: Elm Grove: Cotton Valley Structure
Elm Grove: Cotton Valley Structure with 2007 & 2008 Drilling Program 2007 Drilling Program 2008 Drilling Program 2007 Drilling Program 2007 Drilling Program 2008 Drilling Program 2008 Drilling Program
Slide 15: Elm Grove: Type Log and Play Type
Elm Grove: Type Log and Play Type Coil Tubing fracture stimulation avoids salt water and allows co-mingling with Cotton Valley production Approximately $400,000 to recomplete 53 Hosston recompletions planned in 2008 Stratigraphic field pay Possible horizontal target Most prevalent sand across field
Slide 16: Elm Grove: Horizontal Targets
Elm Grove: Horizontal Targets Thickness 30 ft HORIZONTAL TARGET LCV Taylor Sand Type Log Gross Thickness 250 ft Cotton Valley Davis Type Log HORIZONTAL TARGET
Slide 17: Elm Grove: Isopach
Elm Grove: Isopach Lower Cotton Valley Taylor Sand Knighton #14-5 Drilling Roos #8 Completing Killen #13-3 IP: 16.5 MMcfe/d Killen #13-4 Completing JW Leiber 4.0 MMcfe/d Planned 1 st half new drill Currently drilling Producing well
Slide 18: Elm Grove: Isopach Cotton Valley Davis Sand
JW Operating Moore #2H IP: 2.0 MMcfe/d Petrohawk Snyder #26-5H IP: 4.5 MMcfe/d Petrohawk Charles Horton #30-1H IP: 3.1 MMcfe/d Planned 1 st half new drill Currently drilling Producing well Elm Grove: Isopach Cotton Valley Davis Sand
Slide 19: Haynesville Shale: New North Louisiana Resource Play
Haynesville Shale: New North Louisiana Resource Play Rich organic Shale between Bossier and Smackover Ranges in depth between 10,500’-13,000’ Highly overpressured in southern area of play Elm Grove area only marginally overpressured Over 200’ thick underlying Elm Grove Encana J.W. Adcock core indica
Slide 20: Haynesville Shale activity map
JW Operating: Attempted to Frac Screened out Petrohawk: Drilled deep vertical test Section comparable to CHK and Encana Horizontal well scheduled Q2 Chesapeake: Completed one low volume vertical well Completed horizontal well in October 2007 for 2.8 MMcfe/d Planned half new drill Currently drilling
Slide 21: Haynesville Shale: Cross Section
Haynesville Shale: Cross Section A A’ Chesapeake #1-29H SLRT 2007 Horizontal Test Encana J.W. Adcock Vertical Completion Petrohawk EGP 9-15 Elm Grove Deep Test Test 4.0 MMcfe/d IP: 2.7 MMcfe/d >200’ Net Shale
Slide 22: : i i i i i i i i i i i
: i i i i i i i i i i i
Slide 23: Slide 23
Slide 24: Slide 24
Slide 25: Resource Potential
Resource Potential Terryville Fayetteville Total Company Elm Grove Undeveloped acres: 20,000 Spacing: 20 Acres Risked Potential: 65% Avg Gross Reserves: 1.3 Bcfe Net Revenue Interest: 80% Estimated Resource Potential: 1.5 Tcfe Undeveloped acres: 30,000 Spacing: 60 Acres Risked Potential: 65% Avg Gro
Slide 26: 2008 Drilling Plan: Terryville Field Overview
2008 Drilling Plan Terryville Field Overview 90% % Operated 2008 Budget: Over 900 on 20-acre spacing Potential Locations: $0.15 / Mcfe LOE: $1.8 – 3.2 MM / Well Est. Well Cost: 1.0 Tcfe Est. Resource Potential: 1.2 – 3.0 Bcfe / Well Est. EUR: Approx. 42,000 Net Acreage: $121 Million ~60 operated wel
Slide 27: Terryville: Production and Reserves
Terryville: Production and Reserves Reserves YE 2006 to YE 2007: – Increased from 84 BCFE to 122 BCFE for 45% YOY Growth Daily Production Full Year 2006 to Full Year 2007: – Increased from 17 MM/d to 40 MM/d for 135% YOY Growth - 2008E Proved Reserves Net Production Reserves (Bcfe) Production (Mmcfe
Slide 28: Terryville: Cotton Valley / Bossier Type Log
Terryville: Cotton Valley / Bossier Type Log Base Bossier Lower CV Bodcaw CV Vaughn CV “D” Bossier 9500 - 10,600’ 10,600- 11,700’
Slide 29: Slide 29
Slide 30: Slide 30
Slide 31: Terryville: Lower Cotton Valley Structure
Terryville: Lower Cotton Valley Structure Terryville Extension Acquisition • Minimal Lower Cotton Valley, Bossier & Gray penetrations Existing Terryville 3D Area of Possible Eastern 3D Existing Terryville Productive Area Area of Ongoing Western 3D
Slide 32: Terryville: Bossier Wedge Cross Section
Terryville: Bossier Wedge Cross Section T. Bossier B. Bossier T. Bossier B. Bossier ~ 600’ ~ 1300’
Slide 33: Terryville: Seismic Isochron Bossier
Terryville: Seismic Isochron Bossier ficcrary Heirs 23 #1 5p IP: 7.2 MMcfeld TL McCrary 14 #2 Producit i *Bossier Completion Only a breachg we Comstock Joe Nobles #4 IP: 3.1 MMcfe/d * King 14#1 IP: 4.7 MMcfe/d LA Methodist 14 #1 il Drilling Completing LA United Meth. 23 #1 [7 IP: 7.8 MMcfe/d Planned
Slide 34: Terryville: Seismic Structure Gray Sand
Terryville: Seismic Structure Gray Sand Z Kathco 19 #1 ) | IP: 11.5 MMcfe/d Durrett 24 #1 Ve Planned 4* half new drill ec A Currently drilling Le F, | TT 2 Terryville 8k = May spud LOL AE if on NN Bot Gray sand producing well 3% LCVIBossier producing well |) Gray Sand pinch-out
Slide 35: Slide 35
Slide 36: Slide 36
Slide 37: Slide 37
Slide 38: Slide 38
Slide 39: Resource Potential
Resource Potential Terryville Fayetteville Total Company Elm Grove Undeveloped acres: 20,000 Spacing: 20 Acres Risked Potential: 65% Avg Gross Reserves: 1.3 Bcfe Net Revenue Interest: 80% Estimated Resource Potential: 1.5 Tcfe Undeveloped acres: 30,000 Spacing: 60 Acres Risked Potential: 65% Avg Gro
Slide 40: v
v
Slide 41: Fayetteville Production / Reserve Summary
Production / Reserve Summary 2008E Proved Reserves Net Production Reserves (Bcfe) Net Production (Mmcfe/d) Reserves YE 2006 to YE 2007: – Increase from 0.5 to 54.4 Bcfe – Included 250 total wells • 150 Proved Developed with average EUR of 1.8 Bcfe • 98 Proved Undeveloped locations with average EUR o
Slide 42: Fayetteville: Production Growth
Fayetteville: Production Growth 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007 9/1/2007 10/1/2007 11/1/2007 12/1/2007 1/1/2008 2/1/2008 3/1/2008 Gross Operated Production
Slide 43: Time Zero Production Plot
Time Zero Production Plot Petrohawk Operated Fayetteville Shale Average Daily Production Per Well 1,000 1,500 2,000 2,500 3,000 3,500 Petrohawk Operated Daily Average 3.0 Bcf Type Curve 2.0 Bcf Type Curve 1.0 Bcf Type Curve Month of Production 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th
Slide 44: Fayetteville: Core Area with Net Isopach
Fayetteville: Core Area with Net Isopach > 1 MMcfe/d 1 - 2 MMcfe/d 2 - 3 MMcfe/d > 3 MMcfe/d Currently Drilling Scheduled 1H 2008 50’ 100’ 125’ 150’ 200’ 75’
Slide 45: Fayetteville – Northern Area
Fayetteville – Northern Area PETROHAWK HIPP PETROHAWK BURGESS PETROHAWK GREEN BAY
Slide 46: Fayetteville: Northern Cross Section
0 150 GR [GAPI] 0.1 20000.45 AF10 [OHMM] 0.1 20000.45 AF20 [OHMM] 0.1 2000 AF30 [OHMM] 0.1 2000 AF60 [OHMM] 0.1 2000 AF90 [OHMM] 0 NPHI [CFCF] 0 DPHZ [CFCF] 0 150 GR [GAPI] 0.1 20000.45 AF10 [OHMM] 0.1 20000.45 AF20 [OHMM] 0.1 2000 AF30 [OHMM] 0.1 2000 AF60 [OHMM] 0.1 2000 AF90 [OHMM] 0 NPHI [CFCF]
Slide 47: Fayetteville – Northern Area
Fayetteville – Northern Area Section 11-T11N-13W: 2 Brown wells producing 3.1 MMcfe/d 1 Burgess well producing 1.4 MMcfe/d Section 14-T12N-12W: May well producing 1.2 MMcfe/d Section 31-T12N-10W: Hipp vertical well test 1.0 MMcfe/d; WOPL Section 30-11N-13W: Lewis well tested 3.3 MMcfe/d; WOPL Sectio
Slide 48: Fayetteville – Southern Area
Fayetteville – Southern Area PETROHAWK WHISENHUNT TEXAS OIL & GAS LILES PETROHAWK BOLAND
Slide 49: Fayetteville: Southern Cross Section
0 150 GR [GAPI] 0.1 20000.45 AF10 [OHMM] 0.1 20000.45 AF20 [OHMM] 0.1 2000 AF30 [OHMM] 0.1 2000 AF60 [OHMM] 0.1 2000 AF90 [OHMM] 0 NPHI [CFCF] 0 DPHZ [CFCF] 0 150 GR [GAPI] 0.1 20000.45 AF10 [OHMM] 0.1 20000.45 AF20 [OHMM] 0.1 2000 AF30 [OHMM] 0.1 2000 AF60 [OHMM] 0.1 2000 AF90 [OHMM] 0 NPHI [CFCF]
Slide 50: Fayetteville – Southern Area
Fayetteville – Southern Area Section 29-10N-15W: Chwalinski, Huff & Jones wells 5 wells producing 6.1 MMcfe/d SWN Cove Creek Field: 8N-14W 35 wells with average State Test of 1.5 MMcfe/d Section 20-9N-12W: Sequoyah well State Test 3.8 MMcfe/d Producing 1.8 MMcfe/d Whisenhunt Development: 19 wells pr
Slide 51: Fayetteville Seismic: 2D and 3D
Fayetteville Seismic: 2D and 3D Seismic Data Summary: 1,027 miles of existing 2D seismic 120 miles of new 2D to be shot in 2008 40 square miles of existing 3D seismic 43 square miles of new 3D to be shot or acquired in 2008 over operated sections 268 non-operated sections with existing or in-progres
Slide 52: Regional Fayetteville Depth Map
Regional Fayetteville Depth Map 1000’ 2000’ 3000’ 4000’ 6000’ 5000’ • We operate in the entire depth range of the play • Reserves and costs have a relative relationship to depth • Drilling and completion efficiencies are occurring at all depths
Slide 53: Comparative Well Cost and Reserves by Depth
Comparative Well Cost and Reserves by Depth 1,500' TVD / 4,000' MD 3,500' TVD / 6,500' MD 5,500' TVD / 8,500' MD RIG $213M $267M $365M TUBULARS $85M $123M $142M MUD $45M $55M $65M FRAC COST / STAGES $450M / 6 $530M / 8 $650M / 9 COMPLETION PACKERS $130M $160M $248M FIXED COSTS $745M $1,105M $1,255M
Slide 54: Fayetteville: Simul-Frac
Fayetteville: Simul-Frac Summary Total of 8 have been pumped (7 Simul-Fracs and 1 Tri-Frac) All have been drilled 560’ apart, simulating 40 acre drainage Most have resulted in production comparable to, or in excess of, nearby single well completions Most recent wells were frac’d on February 29 th We
Slide 55: Fayetteville: Northern Area Simul-Frac
Fayetteville: Northern Area Simul-Frac Results HK Burgess #1-11H Frac’d December 19 th Producing 1.4 MMcfe/d HK Lewis #1-30H: Frac’d January 3 rd Tested 3.3 MMcfe/d; WOPL st Sales Est. March 15th HK Bentzinger #1 & 2-17H: Frac’d February 21 st Producing 1.5 & 1.5 MMcfe/d HK Brown #1 & #2-11H Frac’d
Slide 56: Cemented Liner Completion System
Cemented Liner Completion System Pros for Cemented Liner System Ability to specifically place perforations Ability to control the number of perforations Ability to eliminate sand production Eliminate the mechanical risk of the packer system Not limited to a maximum number of stages
Slide 57: Open Hole Packer Completion System
Open Hole Packer Completion System Pros for Open Hole Packer System Frac pumped 1 day, accelerating production Frac accesses entire formation face in the stage Formation is not exposed to damaging cement Surface logistics and down hole time with tools minimized
Slide 58: Fayetteville Drilling Efficiencies (<5,000 ft MD)
Fayetteville Drilling Efficiencies (<5,000 ft MD) $450,000 per well savings – Spud-to-spud reduced by 45% BHA optimization Drilling parameters $0 $1,000,000 $2,000,000 Spud to Spud Avg Est Cost Casing size reduction Spudder rig Continuous improvement Feb 2007 Jan 2008
Slide 59: Fayetteville Drilling Efficiencies (>5,000 ft MD)
Fayetteville Drilling Efficiencies (>5,000 ft MD) $200,000 per well savings – Spud-to-spud reduced by 35% No intermediate casing Spudder rig $0 $1,000,000 $2,000,000 Spud to Spud Avg Est Cost Optimized casing Upgraded rig fleet Continuous improvement Feb 2007 Jan 2008
Slide 60: Fayetteville: Drilling Performance
Fayetteville: Drilling Performance Rig efficiency up 50% Spud-to-spud down 40% 1.50 1.67 1.50 1.50 2.25 J-A '07 Sep Oct Nov Dec Jan08 Wells per Month Rig Count Spud to Spud Drill more wells with fewer rigs – Budgeted 155 wells with 5 rigs – Drill 2.5 wells per rig per month
Slide 61: Fayetteville Pipeline Plan
Fayetteville Pipeline Plan Petrohawk Gathering Expected to be stand-alone profit center ~100 miles of gathering lines built or planned Goal is better control and cost efficiencies Aggressively seek to transport third party gas Firm Transport on Boardwalk Contracted for 100 MMbtu/d transportation Tot
Slide 62: Slide 62
Slide 63: -
-
Slide 64: -
-
Slide 65: -
-
Slide 66: Slide 66
Slide 67: Slide 67
Slide 68: Resource Potential
Resource Potential Total Company Elm Grove Undeveloped acres: 20,000 Spacing: 20 Acres Risked Potential: 65% Avg Gross Reserves: 1.3 Bcfe Net Revenue Interest: 80% Estimated Resource Potential: 1.5 Tcfe Undeveloped acres: 30,000 Spacing: 60 Acres Risked Potential: 65% Avg Gross Reserves: 3.0 Bcfe Ne
Slide 69: Western Region: Locator Map
Western Region: Locator Map Jalmat TXL North Waddell Ranch Sawyer James Lime Tyler Waterflood Talihina NW WEHLU Lipscomb 74% % Gas: $1.15 / Mcfe LOE: 51% % Operated 2008 Budget: $87MM 2008 Budget: MMcfe/d Daily Production: 0.2 Tcfe Est. Resource Potential: 325 Bcfe Proved Reserves:
Slide 70: Western Region Production / Reserve Summary
Production / Reserve Summary Steady state assets with low maintenance capital requirements Low decline, high cash generation Growth opportunities derived from special projects 2008E Proved Reserves Net Production Reserves (Bcfe) Production (Mmcfe/d) Note: 2003 – 2005 proved reserves internally estim
Slide 71: Western Region: WEHLU
Western Region: WEHLU West Edmond Hunton Lime Unit Hunton production @ ~ 8,000’ Oklahoma & Logan Counties, Oklahoma 33,000 net acres ~8.0 MMcfe/d current net production w/ ~2.0 MMcfe/d shut-in $18 million 2008 budget Combination of vertical and horizontal development AMI with Chesapeake on west side
Slide 72: Western Region: Sawyer Field
Western Region: Sawyer Field Petrohawk operated Sutton County, Texas Canyon Sand production @ ~ 5,000’ 91-100% W. I. 10 MMcfe/d current net production $18.6 million 2008 budget 30 Bcf PUD reserve add in 2007 Expected proved reserve adds in 2008
Slide 73: Western Region: Additional 2008 Activity
Western Region: Additional 2008 Activity Other significant areas of development: Waddell Ranch/Crane County, Texas – Ongoing development of shallow oil fields (3,000 - 5,000’) within 76,000 acre ranch – Several deeper (8,000 - 10,000’) exploratory wells budgeted in Jalmat/Lea County, New Mexico – 20
Slide 74: 2008 Guidance
2008 Guidance - Fayetteville Elm Grove Terryville Permian / Other Pro Forma (2) Guidance (1) Includes non-cash stock based compensation charges of $0.12 - $0.16 / Mcfe. (2) Pro forma production for Gulf Coast divestment and acquisitions. 25% organic production growth from core areas Avg. daily produ
Slide 75: Debt and Liquidity Review
($ in millions) 12/31/2007 Debt: Revolver 9.125% Senior Notes 7.125% Senior Notes Total Debt 1,595 Total Shareholder's Equity 2,009 Total Capitalization 3,604 Revolver Borrowing Base 1,000 Revolver Availability Total Liquidity Debt / Total Capitalization 44% EBITDA / Interest Expense 4.8x Debt and L
Slide 76: Derivative Summary
Derivative Summary Collars 50,290 7.05 $ 10.85 $ 62,030 7.30 $ 10.68 $ Swaps 12,800 7.96 $ 3,650 8.46 $ 3,650 $8.25 Puts 5,480 7.00 $ Total Volume and Avg Price 68,570 7.21 $ 10.85 $ 65,680 7.37 $ 10.68 $ 3,650 $8.25 - $ Collars 64.96 $ 80.26 $ - - - Swaps 66.35 $ 77.00 $ $75.28 Total Volume and Avg
Slide 77: Production Growth in Core Areas
Production Growth in Core Areas 2008E Elm Grove Terryville Fayetteville 81% 73% 107% 50% 57%
Slide 78: Slide 78
Slide 79: Slide 79
Slide 80: Slide 80
Slide 81: Slide 81
Slide 82: Slide 82
Slide 83: Slide 83
Slide 84: Resource Potential
Resource Potential Total Company Elm Grove Undeveloped acres: 20,000 Spacing: 20 Acres Risked Potential: 65% Avg Gross Reserves: 1.3 Bcfe Net Revenue Interest: 80% Estimated Resource Potential: 1.5 Tcfe Undeveloped acres: 30,000 Spacing: 60 Acres Risked Potential: 65% Avg Gross Reserves: 3.0 Bcfe Ne
Slide 85: Unlocking Value
Unlocking Value Note: Net Asset Value calculated by allocating $3.00 per Mcfe to estimated year end proved reserves and $1.00 per Mcfe to non-proved reserves. Petrohawk has a rich inventory of development and exploration opportunities We will continue to pursue the right strategies for growth, and w
Slide 86: Analyst Day 2008
ANALYST DAY 2008