Arya Resources Ltd · TSXV:RBZ

Arya Resources — Investor Presentation (November 2026)

25 slides from Arya Resources's investor presentation, Nov 2, 2026

  1. Slide 1: Saskatchewan Gold Exploration

    Saskatchewan Gold Exploration Advancing the Wedge Lake Gold Project Investor Presentation TSXV: RBZ aryaresources.com 11/2/2026

  2. Slide 2: Disclaimer

    TSXV: RBZ aryaresources.com 2 Disclaimer No stock exchange, securities commission, or other regulatory authority has approved or disapproved the information contained in this presentation. This presentation includes certain “forward-looking statements.” All statements other than statements of histor

  3. Slide 3: Why Invest in Arya Resources?

    TSXV: RBZ aryaresources.com 3 Why Invest in Arya Resources? Strong Leadership Market Position Experienced team with a proven track record Low share float and strong insider in exploration and development across the ownership. Americas. High-Potential Projects Expansion Plans Gold focus with exposure

  4. Slide 4: Why explore in Saskatchewan, Canada?

    TSXV: RBZ aryaresources.com 4 Why explore in Saskatchewan, Canada? Highlights • Located in a Tier 1 mining jurisdiction (per Fraser Institute 2025) • Nearby gold mines have been in production since 1991 • Excellent Accessibility: Year-round highway access, power supply, and workforce • Exploration P

  5. Slide 5: Unlocking Mineral Wealth

    TSXV: RBZ aryaresources.com 5 Unlocking Mineral Wealth Wedge Lake GOLD 2025/26 Drill program: focus on high-priority zones to advance underexplored gold targets using modern technology Dunlop Deposit NICKEL, COPPER, COBALT Follow-up exploration drill program to 2023 results Ramp East Claims GOLD / B

  6. Slide 6: Wedge Lake Gold Property

    TSXV: RBZ aryaresources.com 6 Wedge Lake Gold Property Ownership: North 100% ownership, subject to NSR. $105,000 Cash / 5 years Completed $1,000,000 Exploration Expenditures / 5 years Completed 1,000,000 Common Shares / 5 years Completed 2.5% NSR BUYOUT 1% AT $1,000,000 Current mineral claims: 32,45

  7. Slide 7: Wedge Lake Gold Property

    TSXV: RBZ aryaresources.com 7 Wedge Lake Gold Property Zones/Showings Multiple Gold occurrences over 3,900 m of strike length , 1983-1984 Drilling of the Twin Gold Zone: *Historic Resource 101,250 oz Au grading 5.14 g/t Au (Resource Calculation by: Giant Yellowknife Mines Ltd. – 1984) T-6, Triplet &

  8. Slide 8: Wedge Lake Gold Property: 2025 T-6 & Twin Zone Drill Results

    TSXV: RBZ aryaresources.com 8 Wedge Lake Gold Property 2025 T-6 & Twin Zone Drill Results T-6 Zone: Significant Drill-Hole Intersections Hole Number From (m) To (m) Core Length (m) Au (g/t) AR25-01 32.55 34.76 2.21 10.77 Including 34 34.76 0.76 14.1 AR25-06 53.15 54.28 1.13 16.2 Including 53.15 53.7

  9. Slide 9: Wedge Lake Gold Property: 2026 Drilling Results

    TSXV: RBZ aryaresources.com 9 Wedge Lake Gold Property 2026 Gold Drilling Results 2026 Silver and Scandium Drilling Results Granodiorite Twin & Triplet Zone: Drill-Hole Intersections Twin Silver and Scandium Results Drill Hole From (m) To (m) Interval (m) Au (g/t) Drill Hole From (m) To (m) Interval

  10. Slide 10: TSXV: RBZ aryaresources.com

    TSXV: RBZ aryaresources.com 10

  11. Slide 11: TSXV: RBZ aryaresources.com

    TSXV: RBZ aryaresources.com

  12. Slide 12: Wedge Lake Main Zone: 2.79% Cu over 7.4 m

    TSXV: RBZ aryaresources.com WEDGE LAKE | MAIN ZONE Historic Copper–Gold Showing: Exploration Highlights HISTORICAL DRILL RESULTS FIELDWORK & GEOLOGICAL SCALE 2.79% Cu over 7.4 m • Historical trenches relocated and GPS- recorded Including 1.54 g/t Au and 6.86 g/t Ag • Gossanous grab samples collected

  13. Slide 13: Dunlop Deposit

    TSXV: RBZ aryaresources.com 13 Dunlop Deposit Ni, Cu & Co Ultramafic Intrusive Ownership: 100% 2023 Drilling NSR 3.0% NSR – Buyout 2.5% at $2,000,000 1700m 1600m Current mineral claims: 4,059 acres (1,643 ha) Wedge Lake 4km

  14. Slide 14: Dunlop Deposit

    TSXV: RBZ aryaresources.com 14 Dunlop Deposit Confirmation drilling by Arya 2023 AR 23-003 Intersected: AR 23-008 Intersected: AR 23-005 Intersected: 136 m of 0.18% Cu 36.5 m of 0.35% Cu 67 m of 0.20% Cu 0.34% Ni 0.62% Ni 0.39% Ni 175 ppm Co 247 ppm Co 176 ppm Co (including 9.7 m of 3.37% CuEq) Copp

  15. Slide 15: Ramp East Claims

    TSXV: RBZ aryaresources.com 15 Ramp East Claims Current Claims Current Claims Arya Ramp East Claims Ramp Metals Claims Ownership: Option to earn 100% $100,000 in cash over a 24-month period $25,000 PAID 1,500,000 shares over a 24-month period 500,000 SHARES ISSUED 2.0% Net Smelter Return (NSR) royal

  16. Slide 16: Ramp East Claims: Proposed Work Programs

    TSXV: RBZ aryaresources.com 16 Ramp East Claims Proposed Work Programs Fly a fixed-wing airborne geophysical survey to provide high- resolution geophysical data over the granodiorite-quartz-diorite migmatite complex Systematic outcrop mapping to better constrain the geology around the Howard Lake sh

  17. Slide 17: Share Structure

    TSXV: RBZ aryaresources.com 17 Share Structure Issued and Outstanding Listed Shares (October 30, 2026) 50,563,775 Warrants ($0.25 Expiring June 03/2027) 5,100,000 B-Warrants ($0.25 Expiring June 3, 2027 & June 23, 2027) 412,920 B-Warrants ($0.33 Expiring Dec. 24, 2027, and Jan. 12, 2028) 285,695 B-W

  18. Slide 18: Management & Directors

    TSXV: RBZ aryaresources.com 18 Management & Directors Rasool Mohammad Oliver Foeste, CPA, CA President, Chief Executive Officer and Director Chief Financial Officer Mining engineer with more than 30 years of energy and mining experience across Canada, the U.S. and South America. Founder and former C

  19. Slide 19: Director

    TSXV: RBZ aryaresources.com 19 Director Peter Deacon Andrew Cormier, CPA Director Director CEO of River Birch Global Water and Deacon Global Capital. Previously CFO and director of River Birch Global Water, overseeing global helped manage approximately $400 million for private clients at finance, ac

  20. Slide 20: Contact Us

    TSXV: RBZ aryaresources.com 20 Contact Us: Arya Resources Ltd. Rasool Mohammad, CEO CHF Capital Markets Cathy Hume, CEO 850 West Hastings Street E: [email protected] E: [email protected] Suite 450 T: (604) 868-7737 T: (416) 868-1079 x 251 Vancouver, BC V6C 1E1 Twin Zone Core-Photos @AryaResourc

  21. Slide 21: Appendix

    TSXV: RBZ aryaresources.com 21 Appendix Sections

  22. Slide 22: Wedge Lake Gold Project Drill Hole Plan Map

    Twin Zone T6 / Triplet Zone Wedge Lake Gold Project Drill Hole Plan Map

  23. Slide 23: Twin Zone Section 200TW

    400m Legend IF-2 Rhyolite Mixed Volcanics Andesite Iron Formation 1 Iron Formation 2 IF-1 3.91/5.0m gold grams per tonne/metre 300m Twin Zone Section 200TW Looking West 200 E 100 E 300 E

  24. Slide 24: Twin Zone Section 225TW

    400m IF-2 Legend Rhyolite IF-1 Mixed Volcanics Andesite Iron Formation 1 Iron Formation 2 3.91/5.0m gold grams per tonne/metre 300m Twin Zone Section 225TW Looking West 200 E 100 E 300 E

  25. Slide 25: T-6 & Triplet Zone Section Looking Northwest

    Twin Zone 400m T6 / Triplet Zone 1.97/2.48 m 48.9/0.9 m Section Line 300m Legend Quartz Vein Mixed Volcanics Strong Zone of Alteration/ Silicification Iron Formation 3.91/5.0m gold grams per tonne/metre T-6 & Triplet Zone Section Looking Northwest Section Looking Northwest

Arya Resources — Investor Presentation (November 2026) on 6ix