  1. Slide 1: McPhillamys Gold Project CCC

    1 1 REGIS RESOURCES LTD McPhillamys Gold Project CCC Community Consultative Committee February 2019

  2. Slide 2: Agenda

    2 Agenda 2 1. Apologies 2. Declaration of Pecuniary or other interests 3. Business arising from previous minutes 4. Correspondence 5. McPhillamys Update 1. Project area 2. Water pipe line 6. General Business 7. Next Meeting

  3. Slide 3: Community Consultative Committee

    3 Community Consultative Committee 3 ➢ Consists of Independent Chairperson, 7 Community representatives, Council representatives, 3 Regis representatives ➢ Provides formal communication platform for the broader community ➢ Generally meets bimonthly or quarterly ➢ The 7 community members ideally repr

  4. Slide 4: McPhillamys Gold Project Project Update

    4 4 REGIS RESOURCES LTD McPhillamys Gold Project Project Update February 2019

  5. Slide 5: Proposed Infrastructure

    5 Proposed Infrastructure 5

  6. Slide 6: EIS Update

    6 EIS Update 6 ➢Site Layout ➢Groundwater and Surface Water ➢ Modelling is well advanced and peer reviews are commencing ➢Noise, Vibration, Air Quality and Visual ➢ Numerous mine schedule optimisations with different timing, mining rates and methodologies for building the stockpiles have been run. ➢E

  7. Slide 7: EIS Update (cont.)

    7 EIS Update (cont.) 7 ➢Soils & Biophysical Strategic Agricultural Land (BSAL) ➢ Area of potential BSAL to be excised from proposed mining lease ➢Traffic ➢ Site access options still being assessed from both a highway access and road slope perspective with reports to follow ➢TSF Design ➢ TSF design a

  8. Slide 8: TSF Design Types

    8 TSF Design Types 8 The proposed TSF design for McPhillamys is ‘DOWNSTREAM’ (In 3 stages)

  9. Slide 9: EIS Update (cont.)

    9 EIS Update (cont.) 9 ➢Risk Assessment ➢ Overall environmental risk assessment has been completed report to follow ➢ TSF specific risk assessment to be undertaken ➢ Opportunity to have the Risk Assessment facilitator attend a future CCC meeting to explain how risk assessments are conducted and the

  10. Slide 10: EIS Update (cont.)

    10 EIS Update (cont.) 10 ➢Social & Economic ➢ Social impact assessment ongoing with final round of consultations to be undertaken in near future ➢ When the potential impacts (eg noise, air quality, etc) are known, Regis will communicate with the affected residents ➢ Regis’ aim for the EIS is to be c

  11. Slide 11: EIS Update (cont.)

    11 EIS Update (cont.) 11 ➢Community Consultation ➢Face to Face meetings as studies are completed ➢ Community Information Sheet #5 expected to be distributed soon ➢ More community open days when the environmental assessment reports are complete and impacts are understood ➢ These open days would where

  12. Slide 12: Water Supply Pipeline

    12 Water Supply Pipeline 12 ➢Pipeline corridor ➢ Close to finalisation ➢ Private land holders down from ninety eight to seventeen ➢ Most environmental study field work along pipeline corridor options is now complete with reports being prepared ➢ Priority remains to utilise Springvale recycled water,

  13. Slide 13: Proposed Pipeline Route

    13 Proposed Pipeline Route 13 Main Highway Original Pipeline Route Optimised Pipeline Route

  14. Slide 14: Regulatory Approvals

    14 Regulatory Approvals 14 ➢ Submission of PEA to DPE for issuing of EARs ( Complete ) ➢ Submission of EIS to DPE for adequacy ➢ Review of EIS by various regulators ➢ Exhibition of EIS for minimum of 30 days ➢ Submissions Received ➢ IPC first hearing? ➢ Regis Responds to Submissions ➢ IPC Second hea

  15. Slide 15: McPhillamys