Admiralty Resources NL · ASX:ADY
Admiralty Resources NL — International Steel & Minerals Conference 2013
21 slides from Admiralty Resources NL's conference presentation, Mar 21, 2013
Slide 1: International Steel & Minerals Conference 2013
ntl Stee! & Minerals Conference 2013 ADMIRALTY RESOURCES
Slide 2: Forward Looking Statements
Slide - 2 - Forward Looking Statements For personal use only The information in this presentation is published to provide information about Admiralty Resources NL (“Admiralty” or “ADY”) and its subsidiaries. All reasonable effort has been made to provide accurate information, but Admiralty makes no
Slide 3: Agenda
Slide - 3 - For personal use only Agenda 1 2 3 4 Admiralty has Admiralty and Admiralty: Appendix the iron the processing of future its iron production schedule
Slide 4: Admiralty has the iron: 264.7 Mt in Chile
For personal use only Admiralty has the iron: * 264.7 Mt in Chile * Combined Measured, Indicated and Inferred Mineral Resources from the Mariposa & Soberana iron deposits, at a cut-off grade of 15% Fe. Map is not to scale.
Slide 5: The iron: Where?
Slide - 5 - Admiralty has the iron: Where? For personal use only 6,800 Ha in the Chilean iron belt: internal roads network without high mountain formations 40-60km from the coast 10 km from the Pan American highway, with direct access 15-40km from the town of Vallenar, regularly serviced by
Slide 6: The iron: At what development stage?
Slide - 6 - Admiralty has the iron: At what development stage? For personal use only 3 iron districts: Harper South, Pampa Tololo and El Cojin 14 targets confirmed by high resolution ground magnetic survey in 2011-2012 Most advanced targets: Soberana and Mariposa 1. Soberana: − JORC compliant
Slide 7: The iron: How much thus far?
Slide - 7 - Admiralty has the iron: How much thus far? For personal use only JORC-compliant Mineral Resources at a cut-off grade of 15% Fe MEASURED INDICATED INFERRED TOTAL % FeT Project RESOURCES RESOURCES RESOURCES RESOURCES AVERAGE (Mt) (Mt) (Mt) (Mt) Mariposa 43.4 7.6 123.5 174.51 24.5 Soberana
Slide 8: The iron: At what development stage? (La Chulula, Simpson)
Slide - 8 - Admiralty has the iron: At what development stage? For personal use only Advancing targets: La Chulula and Simpson 1. La Chulula: − Dimensions of 250 x 900m, with a depth of 600m, located near surface − 8,552m of drilling in the last 12 months, identifying 3 main sectors 3-D inversion
Slide 9: Working towards production
3 1 Working towards production 2 For personal use only 3 1 Drilling at La Chulula (June-July 2012) Main mineralisation sectors at 2 La Chulula (February 2013) 3 Live production test at Soberana (July 2012)
Slide 10: Admiralty has defined the processing of its iron
For personal use only Admiralty has defined the processing of its iron Types of mineralisation encountered at Mariposa, Soberana and La Chulula (2011-2013).
Slide 11: Defined the processing of its iron: How?
Slide - 11 - Admiralty has defined the processing of its iron: How? For personal use only RUN OF MINE EXTRACTION Mining operations to be conducted by a traditional blast-truck-haul method Optimised processing plant flowsheet composed of: TRANSPORT TO PLANT − 4 crushing stages; and − 3 beneficiat
Slide 12: Conceptual Plant Workflow
Slide - 12 - Admiralty has defined the For personal use only processing of its iron: Conceptual Plant Workflow Final Product 0 Source: Project & Maintenance Engineering S.A. (PME), Chile.
Slide 13: Final Product Specification
Slide - 13 - Admiralty has defined the processing of its iron: Final Product Specification For personal use only CHEMICAL COMPOSITION (fines) Fe 63.50% (min) P 0.075% (max) S 0.07% (max) SiO2 5.50% (max) Al2O3 1.50% (max) V 0.43% (max) Ti 0.23% (max) Cu 0.05% (max) Na & K 0.28% (max) Other 0.10% (ma
Slide 14: Final Product in Lump or Fines
Slide - 14 - Admiralty has defined the processing of its iron: Final Product in Lump or Fines For personal use only Lump Lumps Fines Production from the real live test performed on Soberana ROM (July 2012).
Slide 15: Admiralty: future production schedule
For personal use only Admiralty: future production schedule
Slide 16: Admiralty: Future Production Schedule
Slide - 16 - Admiralty: Future Production Schedule For personal use only IRON ORE PRODUCTION (DMT) @ >62% Fe Year ended 30 June 2014 2015 2016 2017 2018 Soberana1 240,000 360,000 360,000 360,000 360,000 Mariposa2 - 500,000 1,200,000 1,200,000 1,200,000 La Chulula3 500,000 1,200,000 1,200,000 Plant E
Slide 17: Appendix
For personal use only Appendix
Slide 18: Board of Directors
Slide - 18 - Board of Directors For personal use only Prof. Ross Harper Stephen Prior Dr Shaoqing Li Michael Perry Hanjing Xu Chairman Managing Director Non-executive Director Non-Executive Director Non-executive Director CBE and Emeritus Chartered accountant, PhD in GeoTechnical Former Senior Partn
Slide 19: Corporate Directory
Slide - 19 - Corporate Directory For personal use only SHARES ON ISSUE: 727,822,759* CONTACT Level 16, 379 Collins Street, NUMBER OF SHAREHOLDERS: 8,343* Melbourne VIC 3000, Australia Tel: +61 3 9620 7144 CURRENT SHARE PRICE: (AUD) 3.4c* Email: [email protected] Website: www.ady.com.au CURRENT MA
Slide 20: Past Final Product Composition
Slide - 20 - Past Final For personal use only Product Composition Extract from Certificate of Analysis issued by Alex Stewart International on the 44,592,413 WTM iron ore fines shipped by MV ZHI QIANG on 22 October 2008.
Slide 21: Thank you for your attention
For personal use only Thank you for your attention. I would be pleased to address any questions from the floor.