Slide 1: Gas Production - Rapid Growth: Investor Presentation October 2009
“Gas Production - Strong Growth” “Gas Production Rapid Growth” Investor Presentation October 2009
Slide 2: Italy and Po Valley
ITALY AND PO VALLEY Gas Consumption 3 tcf p.a. Growing at 2-3% p.a. Gas Production 27 tcf to date Europe’s 2nd largest Po Valley onshore gas province Europe’s largest Val D’Agri onshore oil field Po Valley/Northern Adriatic was monopoly of ENI/Agip for 50 years Page 1
Slide 3: Project Pipeline: Dec 2004 (IPO Price AUD1.00)
PROJECT PIPELINE: DEC 2004 (IPO Price AUD1.00) Applications Exploration / Development / Production / Appraisal Appraisal Development • Bezzecca • Castello • Sant’Alberto • Sillaro Page 2
Slide 4: Project Pipeline: Start 2008
PROJECT PIPELINE: START 2008 Applications Exploration / Development / Production / Storage Appraisal Appraisal Development • AR168PY • 10 Gas targets • Castello • Sant’Alberto • Bagnolo Mella Bid • Cadelbosco • 2 Oil targets • Sillaro • Castello • Existing Storage − Rovagnate • Sillaro potential in
Slide 5: Project Pipeline & Operations: October 2009
PROJECT PIPELINE & OPERATIONS: OCTOBER 2009 Applications Exploration / Development / Production / Storage Appraisal Appraisal Development 2 offshore gas 6 new licence 7 Discoveries 3 fields Bid for new gas & 2 onshore areas moving into storage licences gas production Onshore • Won - AR168PY • 17 Gas
Slide 6: Resource Base
RESOURCE BASE Po Valley Assets 11 License areas 3 Production Developments Sillaro Castello Sant’ Alberto 7 Gas Discoveries for appraisal 17 Gas Exploration prospects 2 Oil prospects Page 5
Slide 7: Building Blocks in Place for Gas Production
BUILDING BLOCKS IN PLACE FOR GAS PRODUCTION Castello Sillaro 20 year Production Concessions Granted Environmental Approvals Surface Plant Equipment Fabricated Pipeline Grid Connections Offtake Contract (100%) Drill Production Well N/A Commence Installation Commence Producti
Slide 8: Pipeline Connected to National Italian Grid
PIPELINE CONNECTED TO NATIONAL ITALIAN GRID Sillaro - Complete Castello – Complete Page 7
Slide 9: Contracts in Place: Italtrading & Elettrogas
CONTRACTS IN PLACE: ITALTRADING & ELETTROGAS Italtrading SpA is an established gas, energy and renewable trading & distribution company which is part of AUD 1 billion private AFIN Group Elettrogas SpA distributes gas through 632 delivery points directly to Italian consumers, with annual turnover of
Slide 10: Prices Strong and Rising
PRICES STRONG AND RISING ITALIAN ENI GAS RELEASE PRICE: SEPTEMBER UPDATE Source: ENI Gas Release and forecast sourced from Alba Soluzioni; Driver parameters and forward curves sourced from Bloomberg Page 9
Slide 11: Maiden Production Field: Castello
MAIDEN PRODUCTION FIELD: CASTELLO Pinch out structure P50 6.3 bcf 2.7 million cf/day 10-12 year field life USD10 million p.a.* *Based on €0.28/cm Page 10
Slide 12: Castello Commissioning Starts: 1 Month to Gas
CASTELLO COMMISSIONING STARTS: 1 MONTH TO GAS Page 11
Slide 13: Bezzecca Can Feed into Castello
BEZZECCA CAN FEED INTO CASTELLO Page 12
Slide 14: Bezzecca: Successfully Drilled and Tested
BEZZECCA: SUCCESSFULLY DRILLED AND TESTED Seismic section Bezzecca field Previously successfully drilled and tested by ENI in 1950s; produced NW SE 5bcf/0.14 bcm gas 50km of seismic acquired and processed confirmed structure and drill site 3 gas bearing levels PL1-A Qmax PL2-A 3.9 million cu
Slide 15: Second Production Field: Sillaro
SECOND PRODUCTION FIELD: SILLARO Top of Anticline P50 14.4 bcf Multiple gas bearing stacked reservoirs 3.8 million cf/day 15-20 year field life USD15 million p.a.* Production Productiontest test(Dec (Dec2005) 2005) *Based on €0.28/cm Page 14
Slide 16: Sillaro Successfully Drilled and Tested
SILLARO SUCCESSFULLY DRILLED AND TESTED 6 production levels confirmed 2 new previously untested levels Well completed safely on schedule on budget Page 15
Slide 17: Fantuzza Can Feed into Sillaro
FANTUZZA CAN FEED INTO SILLARO Targeting 2,600m Miocene structure ~40 bcf / 1.15 bcm (70% of entire field reserves) Previously drilled and tested by ENI 50km of seismic acquired and processed Fantuzza 1 site selected, drilling approvals in process, equipment purchased and drilling rig contra
Slide 18: Growth Program: Production and Exploration Assets
GROWTH PROGRAM PRODUCTION AND EXPLORATION ASSETS Sillaro and Castello first gas: November 2009 Castello Bezzecca can feed into Castello plant: development plan January 2010 Expansion Sillaro first gas: January 2010 Fantuzza can feed into Sillaro plant: well to spud June Qtr 2010 High impact
Slide 19: PVE Reserve & Resource Categorization
PVE RESERVE & RESOURCE CATEGORIZATION Page 18
Slide 20: Gas Exploration: East Po Valley/Adriatic Expansion
GAS EXPLORATION: EAST PO VALLEY/ADRIATIC EXPANSION Page 19
Slide 21: Expansion Offshore: Azzurra (AR168PY)
EXPANSION OFFSHORE: AZZURRA (AR168PY) Major gas production zone in Italy Shallow water depth ~20m Full 3D seismic coverage 4 drilled and tested prospects Azzurra Ginevra Adele Irma/Carola Preliminary award to Po Valley: July 2008 G&G work underway Pipeline connection through li
Slide 22: Oil and Gas Exploration: North Po Valley
OIL AND GAS EXPLORATION: NORTH PO VALLEY Page 21
Slide 23: Correggio: Strong Addition to the Portfolio
CORREGGIO: STRONG ADDITION TO THE PORTFOLIO Plio-Pliocene structural trap Production to date ~240 bcf Potential P50 gas discoveries ~ 35 bcf Planned 3D seismic coverage Page 22
Slide 24: Board of Directors
BOARD OF DIRECTORS Mr Graham Bradley • Former CEO - Perpetual, Blake Dawson Waldron Non-executive Chairman • Director – Singtel • Chairman – HSBC, Stockland, Boart Longyear Mr David McEvoy • 33 years Exxon/Esso Non-executive Director • Director - Woodside Petroleum, AWE, Innamincka Petroleum Dr Byro
Slide 25: Po Valley Capital Structure
PO VALLEY CAPITAL STRUCTURE Shares (m) held Substantial Shareholders % as at 15 Oct 2009 Michael Masterman 23.9 22.0% Hunter Hall 20.4 18.7% Beronia Investments 7.1 6.5% Other Investors 57.4 52.8% TOTAL SHARES 108.8 Market Capitalization (at A$1.55) (€102.8m) A$168.6m Cash at Bank (Oct 09) (€5.1m) A
Slide 26: Summary: 2009/2010
SUMMARY: 2009/2010 Portfolio 3 Fields moving into production 7 Discovered undeveloped fields 17 Defined gas exploration prospects 2 Oil targets Activity 2 Fields - Castello, Sillaro - going into production mid year with USD 25 million Revenue / USD 20 million EBITDA (full year) 2 Apprais
Slide 27: Disclaimer