  1. Slide 1: Gold Production in Shandong Province, China

    MJS: TSX-V A0BK1D: FSE January 2016 GOLD PRODUCTION IN SHANDONG PROVINCE, CHINA

  2. Slide 2: Cautionary Statement

    Cautionary Statement Disclaimer MAJESTIC GOLD CORP. (“Majestic” or “the Company”), has taken all reasonable care in producing and publishing information contained on this presentation, and will endeavor to do so regularly. Material on this presentation may still contain technical or other inaccuraci

  3. Slide 3: Cautionary Statement

    Cautionary Statement Disclaimer PRODUCTION DISCLAIMER: The Company’s production decision was not based on a feasibility study of mineral reserves demonstrating economic and technical viability. The Company’s production decision was made based on the open pit optimization resource model set out in th

  4. Slide 4: Management Team

    Management Team JOHN CAMPBELL – Lead Director DIRECTORS AND MANAGEMENT • Mr. Campbell holds a law degree from the University of British Columbia (1960), and practiced law full time from 1970 to 1985, specializing in resource and GENGSHU MIAO – Chairman securities law. Mr. Campbell has managed a numb

  5. Slide 5: Opportunity in China

    OPPORTUNITY IN CHINA • China became the largest producer of gold in the world in 2007 and the largest consumer of gold in 2013 • Domestic demand for gold far greater than domestic supply • Consistent economic growth in China and India drives demand • Stable political and investment climate • Large,

  6. Slide 6: Songjiagou Project Location

    Songjiagou Project Location • Majestic’s Songjiagou Mine is located in Muping County on the Jiaodong Peninsula, Shandong Province  Shandong is the historic heartland of China’s gold mining industry  Shandong produces 25% of China’s annual gold production • Majestic Gold holds 75% (70.5% net) inter

  7. Slide 7: Geology of Project Area

    Geology of Project Area • Songjiagou is a mesothermal deposit hosted in a conglomerate in the Laiyang Group Linsishian formation • Mineralization occurs in veins, disseminations, and in stockworks and is visually indistinguishable from wall rocks 7 from SRK Report, August 2013

  8. Slide 8: Project Resource and Economics

    Project Resource and Economics • SRK Consulting (China) Ltd. updated resource calculation in January 2013 • Based on a database of 20,836 samples from:  46 surface trenches  77 surface drill holes  104 underground samples (channel samples and drill holes) NI 43-101 Compliant Resource Estimate wit

  9. Slide 9: Preliminary Economic Assessment

    Preliminary Economic Assessment • Completed by SRK Consulting (China) Ltd. (“SRK”) in August 2013, amended in January 2016 • Multiple based on current market capitalization of approximately US$71.4 M • Base Case NPV’s based on SRK’s 2013 in-Pit Indicated Resource only, within the original Mining Lic

  10. Slide 10: Milestones 2010 - Present

    Milestones 2010 - Present  Revised ownership from 60% to 75% (70.5% net) in 2010  Raised $75 million – most recently $35.5 million completed in June 2012  Original Resource - NI 43-101 by Wardrop in October 2010 – revised by SRK in August 2013  Original PEA by Wardrop in March, 2011 – revised by

  11. Slide 11: 2015/2016 Focus: Implementation of Optimization Program to Increase Grade

    2015/2016 Focus: Implementation of Optimization Program to Increase Grade • Revised mining/milling contract provides Majestic with control over mine design, planning, and direction of mining activity, including the disposal of waste material • More accurate 3D Laser Survey of entire area completed,

  12. Slide 12: Revised Topographic Map of Songjiagou and surrounding area

    Revised Topographic Map of Songjiagou and surrounding area 12

  13. Slide 13: Au Grade Distribution

    a MSS) Gold Corp, Au Grade Distribution | ° 4111100 N 621300 E uw = N oS Section Line 36 — 4110900 N 4110500 N — AuCap <0.3 >=0.3 >=0.5 >=1.0 — | 13

  14. Slide 14: Au Grade Distribution

    pm, Majestic Gold Comp, Section Line 36 — 200 200 — Case 1: ino Limit with mining Case 4: yg license(+9m ASL) Case 2: No Limit Limit with mining license(-39m ASL) Case 3: Limit with mining — -200 license(-400m ASL) -299 — ; AuCap <0.3 >=0.3 — -300 >=0.5 >=1.0 14

  15. Slide 15: Capital Structure February 2016

    Capital Structure February 2016 Shares Issued: 839,765,216 Toronto Stock Exchange TSX-V MJS Options: 48,200,000 Recent Share Price CAD$ 0.085 52-week low-high CAD$ 0.035-0.12 Fully Diluted: 887,965,216 Market Cap.: CAD$ 71.38M Cash Position : USD$ 7.6M Frankfurt Stock Exchange A0BK1D (as of February

  16. Slide 16: Summary

    Summary • Large NI 43-101 gold in-pit gold resource with room for expansion • In production with approvals in place to increase size of open pit within larger Mining License • Plans for 2016:  Continue implementation of grade control program  Increase capacity of on-site assay lab  Continue build

  17. Slide 17: Contact Information

    Contact Information Head Office: Majestic Gold Corp. 306 – 1688 152nd Street Surrey, British Columbia Canada V4A 4N2 Telephone +1 (604) 560-9060 Fax +1 (604) 560-9062 Website www.majesticgold.com E-mail [email protected] 17

  18. Slide 18: Open Pit Operations

    Open Pit Open Pit Operations 18

  19. Slide 19: Mill Pictures: Crushers & Conveyors to Main Mill

    Mill Pictures Crushers & Conveyors to Main Mill 19

  20. Slide 20: Inside the Mill: Ball Mill in operation

    Inside the Mill Ball Mill in operation 20

  21. Slide 21: Inside the Mill: Coarse Crush returning to Ball Mill

    Inside the Mill Coarse Crush returning to Ball Mill 21

  22. Slide 22: Inside the Mill: Mixer in operation

    Inside the Mill Mixer in operation 22

  23. Slide 23: Inside the Mill: Floatation Cells

    Inside the Mill Floatation Cells skimming off Gold Concentrate 23

  24. Slide 24: Inside the Mill: Gold Concentrate

    Inside the Mill Gold Concentrate after moisture reduction Ready to ship to the Smelter 24

  25. Slide 25: Tailings Pond

    Tailings Pond Water recycling reservoir below tailings dam (zero discharge) 25