Slide 1: Presentation on the Power Sector in India
The Tata Power Company Limited Presentation on the Power Sector in India By Mr. F. A. Vandrevala, Managing Director April, 2004 TPC/060404 1

Slide 2: Contents
CONTENTS 1. INDIA- AN OVERVIEW 2. THE ELECTRICITY ACT 2003 3. PROGRESS OF REFORMS 4. POWER SECTOR PLAYERS 5. OPPORTUNITIES 6. CONCLUSION TPC/060404 2

Slide 3: India – Some Facts
India –Some Facts Population 1050 Million (Growth Rate of 1.5%) -2003 data Rs 24.6 lakh Crores = US $ 572 Billion GDP 11th Highest GDP in the World 4th Highest in GDP (PPP)- US $ 2400 Billion System of •Multiparty Parliamentary System –Westminster Model Government •Two Houses of Parliament • Worlds

Slide 4: Economic Highlights
Economic Highlights Sensex Growth +77 % in last 12 months Power Stocks + 243 % in last 12 months Growth Expected GDP • 8% in 03-04 Growth • 10.5 % in Q3 of FY 04 Forbes 2000 •27 Indian Companies in list List The Rupee has strengthened 8.7 % vs US $ in the last one year TPC/060404 4

Slide 5: Tariffs in India
Tariffs in India Typical Electricity Tariffs in India (Maharashtra) Rs/Unit Cents/Kwh* Resident ial 2.8 6.4 Commercial 3.9 8.9 Small Industrial 3.3 7.5 Agricult ure (Met ered)# 1.5 3.4 Big Indust rial 4.0 9.1 Railways 3.9 8.8 * 1$= Rs 44 # Actual paid is less due to Govt Subsidy The Tariffs are stru

Slide 6: Power Scenario - Capacity
Power Scenario - Capacity • Installed Generating Capacity in India (FY03) : – State Government Owned 64,428 MW (58%) – Central Government Owned 34,500 MW (31%) – Private Sector Owned 11,660 MW (11%) – TOTAL 1,10,588 MW Others All India Installed Capacity in MW (Nuclear, Capacity Mix in India Wind) 1

Slide 7: Power Regions of India
Power Regions of India Eastern Grid (EG) –16695 MW Northern Grid (NG) –28553 MW Western Grid (WG) –31563 MW Southern Grid (EG) –28452 MW North – Eastern Grid Power Transfer Matrix (MW) From/To EG NG WG SG Total EG 1700 2450 2700 6850 From/To NG 1700 700 700 WG 2450 700 1400 1400 SG 2700 1400 8950 Pl

Slide 8: Per-Capita Energy Consumption
Per-Capita Energy Consumption ( Kwh per Year per Capita ) Indonesia 379 India 473 China 1019 Mexico 1779 UK 5759 France 6901 USA 12406 Canada 15661 High potential for growth of the power sector in India, even as compared to China TPC/060404 8

Slide 9: Energy and Peak Shortages 2003 - 2004
Energy and Peak Shortages 2003 - 2004 25 Peak Supply Shortage % 20.4 Average Energy Shortage % 20 15 14.9 % 10.7 10.5 10.3 10 8 6.5 7 5.3 5.2 5 4.9 5 0 Northern Southern Western Eastern North- All India Eastern Despite a manifold increase in the installed capacity, supplies have not been able to kee

Slide 10: Commercial Losses of SEBs
Commercial Losses of SEBs With Subsidy Excluding Subsidy 300 254 260 246 250 213 200 165 173 Rs Billion 150 139 126 100 43 50 0 0 FY '92 FY '01 FY '02 FY 03 FY 04(E) Source: Economic Survey of India 2002-03 TPC/060404 10

Slide 11: Future Vision
Future Vision • Vision 2012 by the Government of India – “ Power for All by 2012 ” – Generating Capacity to be increased from 105,000 MW to 212,000 MW – Share of the Private Sector to be increased from 10% to 16.5% – Hydel contribution mix to be increased from 25% to 30% : addition of almost 40,000

Slide 12: Future Vision (contd.)
Future Vision (contd.) • Vision 2012 by the Government of India – “ Power for All by 2012 ” – Peak Demand Shortage to be brought down to 0 from the existing 13% (2001-02). – Average Energy Shortage to be brought down to 0 from the existing 8%. – Industrial tariff, which is presently about Rs. 5 per

Slide 13: Electricity Act 2003, Brief Synopsis
Electricity Act 2003, Brief Synopsis TPC/060404 13

Slide 14: Objects and Reasons for the new Act
Objects and Reasons for the new Act • Objectives of the Electricity Act 2003 – To consolidate laws relating to electricity generation, transmission, distribution, trading and use – To promote competition , protect the interest of consumers and extend supply of electricity to all areas – To rationali

Slide 15: Some Time Lines
Some Time Lines • By 10th Dec 2003 – Establishment of Consumer Grievance Forums by Distribution Licensees – Appointment of Ombudsman by the State Commission. – Application of the Act in a State if so notified by that State • By 10th June 2004 – Vesting assets of SEBs (STUs after enactment) in Govt.C

Slide 16: The Act's Provisions - Licenses
The Act’s Provisions - LICENSES • Licenses required for – Transmission – Distribution – Trading • Deemed licenses awarded to – Existing licensees such as Tata Power, BSES – Central Tx Utility (CTU) and State Tx Utilities (STU) – Government companies formed after segregation of SEBs • Local authoriti

Slide 17: The Act's Provisions - Generation
The Act’s Provisions - GENERATION • Generation has been delicensed i.e. no license and clearances required to establish, operate and maintain thermal / combined cycle stations. • CEA clearance required only for hydel projects • Tariffs for sales to distribution licensees to be determined by the Regu

Slide 18: The Act's Provisions - Distribution
The Act’s Provisions - DISTRIBUTION • Two or more distribution licensees having their own network allowed in the same area. – Provision for franchisees • Open access of distribution network to be allowed by State Regulators in a phased manner • Consumers availing open access must pay – Wheeling char

Slide 19: The Act's Provisions - Transmission
The Act’s Provisions - TRANSMISSION • National Load Despatch Centre, Regional Load Despatch Centres and State Load Despatch Centres to ensure – integrated operation of the power system – optimal scheduling and despatch and – energy accounting • CTU, STUs and other Tx licensees to be engaged in inter

Slide 20: The Act's Provisions - Tariffs
The Act’s Provisions - TARIFFS • Provisions under earlier acts to continue for one year • Determination of tariffs by Regulators to be guided by – National Tariff Policy specified by GoI – Commercial principles – Factors encouraging efficient use of resources and performance improvement – Recovery o

Slide 21: Progress of Reforms
Progress of Reforms TPC/060404 21

Slide 22: Reforms - So Far
Reforms - So Far ¾ The Central Electricity Regulatory Commission established and functional ¾ 9 (out of 28) states have passed their own reform laws prior to enactment of The Electricity Act 2003. ¾ 10 States have unbundled State Electricity Boards. ¾ Almost all States have constituted State Electri

Slide 23: Status of Implementation of the Act
Status of Implementation of the Act • Rules and regulations required for implementation being framed by the Government, CEA, Central Electricity Regulatory Commission, State Governments and the State Electricity Regulatory Commissions. • Drafts of the National Tariff Policy circulated for consensus.

Slide 24: CERC's New Tariff Norms
CERC’s New Tariff Norms • Multi-year tariff guidelines declared. • These guidelines are for the period 2004 – 2009 • All projects to be deemed to be funded by a normative debt : equity ratio of 70% : 30%. • 14% post-tax return on equity for all . • Total depreciation charges to equal loan repayments

Slide 25: CERC's New Tariff Norms (Contd.)
CERC’s New Tariff Norms ------ ( Contd. ) • Performance norms have been raised. – Thresh-hold PLF for thermal plants for earning incentive raised to 80% from the existing 77%. However, incentive increased from 21.5 to 25 paise per Kwh. – Availability for recovery of all fixed costs of run-of-the riv

Slide 26: Privatisation of Distribution
Privatisation of Distribution ¾ Private distribution stable and successful in Mumbai, Kolkata, Ahmedabad and Surat for the last several decades. ¾ Distribution privatisation undertaken in Orissa in 1999. – Problems due to over-valuation of assets and under assessment of T&D losses in the absence of

Slide 27: The Accelerated Power Development Reforms Programme
The Accelerated Power Development Reforms Programme ¾ Objectives : y Reduction of T. & D. losses . y Up-gradation of sub-transmission and distribution system. y 100% metering y Renovation and modernisation of power plants. y Improving the quality and reliability of power supply. TPC/060404 27

Slide 28: The Accelerated Power Development Reforms Programme
The Accelerated Power Development Reforms Programme ¾ Investment Assistance 25% grant, 25% loan from GOI. Balance 50% IGR / FIs ¾ Incentive Scheme Reward for actual cash loss reduction ¾ Fund release based on achievement of milestones TPC/060404 28

Slide 29: The Accelerated Power Development Reforms Programme - Status
The Accelerated Power Development Reforms Programme- Status y 410 projects valued at Rs 166 billion approved y Design of scheme rewards success of reforms with greater access to further funds. y Results already visible; most States have “fundamentals” in place y Feeder level metering has reached 92%

Slide 30: Opportunities
Opportunities TPC/060404 30

Slide 31: Sectoral Opportunities -- Generation
Sectoral Opportunities -- Generation ¾ Hydro share to be raised from 24% to 27% in next five years. ¾ Generation delicensing. yExpansion of existing stations. yCoastal stations. yCoal & gas based stations yRenovation & modernisation ¾ Joint Ventures of Centre / State / Private Sector TPC/060404 31

Slide 32: Sectoral Opportunities -- Transmission
Sectoral Opportunities -- Transmission ¾ National Grid ¾ 4950 MW to 30,000 MW of interregional transfer capability by year 2012 . ¾ Technology up-gradation – 800 KV A.C. and 500 KV D.C. ¾ RLDCs modernization. ¾ Reliability improvement, reactive compensation. ¾ Private participation via y Independent

Slide 33: Sectoral Opportunities -- Distribution
Sectoral Opportunities -- Distribution ¾ Refurbishment of sub-transmission and distribution networks. ¾ Energy accounting and MIS ¾ Metering and meter reading systems. ¾ LT – Less High Voltage Distribution Systems ¾ Technology enhancement for improved reliability ¾ SCADA, Advanced Communications, Mo

Slide 34: Investment Needed During Next Ten Years
Investment Needed During Next Ten Years Investments During next 10 years Rs Cr US $ Billion Generation Projects 576400 131 Transmission Schemes 132000 30 Distribution Network 74800 17 Rural Electrification 74800 17 Renovation and Modernisation 30800 7 Total 888800 202 TPC/060404 34

Slide 35: Power Utilities in India
Power Utilities in India TPC/060404 35

Slide 36: Tata Power - Company Snapshot
Tata Power -Company Snapshot Power Telecom Energy Broadband Tata Tata Being transferred to Generation Transmission Distribution Teleservices a newly formed (TTSL) Petrodyne 100% subsidiary Mumbai Area Mumbai Area Mumbai Area Licences for16 circles Oil & Gas Exploration generation Transmission Distri

Slide 37: TPC has delivered consistent and growing dividends
TPC has delivered consistent and growing dividends … Dividend Payout Ratio and Dividends 30% (%) 7 6.50 25% 25% 6 25% 5.00 20% 5 20% 5.00 19% 4.20 4 15% 3 10% 2 5% 1 0% 0 2000 2001 2002 2003 Dividend payout ratio Dividend (Rs./ share) TPC/060404 37

Slide 38: TPC Profitability – EBITDA & PAT
TPC Profitability – EBITDA & PAT 16000 G R 7.6% CA % 13,362 14000 AG R 3.5 13,018 C 12000 10,733 10,939 9,655 10000 Rs mm 8000 6000 5,082 5,199 4,686 4,556 3,896 4000 2000 0 2000 2001 2002 2003 2004 (Upto Dec 03) EBITDA PAT TPC/060404 38

Slide 39: Tata Power in Distribution - Delhi
Tata Power in Distribution - Delhi • North Delhi Power Limited : – TPC’s maiden foray outside Mumbai into distribution. – Entire circle plagued by high A T & C losses in excess of 50% – Distributing 6000 MUs of electricity over a consumer base of almost 8 lakhs spread out over 570 sq. kms. – Distrib

Slide 40: North Delhi Power Limited Profile
North Delhi Power Limited Profile Area 550 Sq Kms Population 4.5 Mn. Peak Load 1050 MW Estimated annual energy requirement 5,500 Mn. Units Total registered consumers 850,000 (Actual estimated 1 Mn.) Per capita consumption (Units) 1225 (National average 473) Number of employees 4500 (At the time of t

Slide 41: Power scenario in Delhi
Power scenario in Delhi • Peak Requirement – 3100 MW (restricted) • Daily energy requirement – 65-67 MUs (Summer), 60-65 MUs (Winter) • Peak Shortage – 300 MWs • AT&C loss level - in excess of 50% • Peak Growth Rate 7% – 8% • Consumer Profile – Industrial 30% – Commercial 12% – Domestic 50% – Utilit

Slide 42: Five Year Revenue Model
Five Year Revenue Model Financial Support From Government During Transition Period Expenses and return Revenue from retail supply Expenses – approved by Regulator DISCOM (Less due to present losses) Return – Guaranteed – 16% Balance amount for Bulk Supply Purchase (DISCOM’s Paying capacity) Loan Fro

Slide 43: NDPL - Improvements
NDPL- Improvements • Operational and Technological Firsts introduced > Unique SMS facility > Unmanned and Remote controlled Grid Stations > Package Substations > Ring Main SF6 units > Thermo Vision scanning for Hot spot detection > Mobile Maintenance crews > Mobile Transformer Unit > High Voltage Di

Slide 44: NDPL - Improvements (contd.)
NDPL- Improvements (contd.) • Innovative Consumer care > 100% consumer commercial data uploaded on website > automated meter reading > Multiple bill payment options • HR Initiatives > HR development institute started • 12000+man days of training achieved • State of Art training facilities > Performa

Slide 45: Key Achievements of NDPL
Key Achievements of NDPL • Power Transformation Capacity increased by 19% • Distribution Transformation Capacity increased by 12%. • 3 New Distribution Circles created for better monitoring. • (N-1) concept implemented, providing 100% redundancies in 30 Grids out of 40, 7 grids are planned to be don

Slide 46: AT&C Loss Trend at NDPL
AT&C Loss Trend at NDPL 70% 65.5% Privatisation 65% 2002-03 60% 55.53% 55% % 50% 51.1% 45% 2003-04 44.7% 40% 35% Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Months TPC/060404 46

Slide 47: Powerlinks Transmission Ltd
Powerlinks Transmission Ltd • A Joint Venture of Tata Power and Powergrid ; ¾ First Joint Venture in Power Transmission in India - a trend setter • 1200 Kms of 400 KV Double Circuit Transmission Lines ¾ The estimated Capital Cost of Rs 1400 Crores • The project will facilitate creation of a Transmis

Slide 48: Power Trading Corporation
Power Trading Corporation • Electricity Act recognises power trading as distinct activity ¾ Allows Private players to participate • PTC has traded 4178 Mus in FY 03 ¾ Expects to trade 6000 Mus in FY 04 and about 9000 Mus in FY 05 • PTC has launched an IPO of Rs 58.5 Crores > Tata Power holds 16% Equ

Slide 49: NTPC – World Class and World Size Power Utility
NTPC – World Class and World Size Power Utility • Sixth Largest Thermal Generating Company in the World. • Second in capacity utilisation Worldwide. • 21,435 MW Installed Capacity as on date, constituting 19% of India’s installed capacity • 26% of India’s energy generation. • Turnover of U.S. $ 4.5

Slide 50: NHPC – Largest Hydel Power Utility in India
NHPC – Largest Hydel Power Utility in India • 2275 MW of capacity in operation. • 4300 MW of capacity under construction. • 14400 MW of capacity under active development. • ~ 9900 MUs of generation. • High Machine Availability of 97%. • Turnover of U.S. $ 301 Mio. • PAT of U.S.$ 116 Mio. • Gross Fix

Slide 51: The Power Grid Corporation of India Limited
The Power Grid Corporation of India Limited • Single Largest Transmission Utility in the World • Over 41,000 Circuit Kms. of EHV Transmission Network spanning the length and breadth of India. • 34,000 MVA of Transformer capacity. • Transmits 40% of power generated in India. • Turnover of U.S. $ 550

Slide 52: Bharat Heavy Electricals Limited (BHEL)
The Bharat Heavy Electricals Limited ( BHEL ) • Manufactures 180 Products ( 30 Major Product Groups ) at 14 Manufacturing Units. • Product Range includes equipment for power generation, transmission and distribution, transportation, telecom. • 90,000 MW of power generation capacity supplied for util

Slide 53: Conclusion
Conclusion • The Indian Power Sector is on the move. • Legislation is in place and Reforms are in progress. • Ambitious capacity addition target of 1,07,000 MW by 2012, with matching capacities in Transmission and Distribution. • Inter-regional power transfer capacity to be augmented to 30,000 MW •

Slide 54: Thank You!
Thank You ! TPC/060404 54

Slide 55: Back Up
TATA POWER TPC/060404 55

Slide 56: Efficiency Improvement Commitments
Efficiency Improvement Commitments Annual break up of commitments as quoted by Tata Power 2002-03 2003-04 2004-05 2005-06 2006-07 Annual 0.50% 2.25% 4.50% 5.50% 4.25% improvements of losses Loss levels at the 47.6% 45.35% 40.85% 35.35% 31.10% end of year Total commitment for loss reduction in 5 year

Slide 57: Performance Change
Performance Change 1.0 Customer Service Indices FY 2003-04 Particulars Units Feb-03 Feb-04 YTD 04 Reliability Index % 99.62% 99.78% 99.55% Load Shedding (as a %age of total MUs 8.35 14.56 91.97 energy input) % 2.19% 3.72% 1.79% % %age of billing errors corrected 0.21% 0.12% 0.51% (Cumulative) 2.0 Op

Slide 58: List of Indian Companies in Forbes 2000
List of 27 Indian Companies in Forbes 2000 • Forbes 2000 List (Ranking) – Indian Oil (243), SBI (251), ONGC (273), RIL(303), BPCL(804), ICICI Bank (820), HPCL(856), GAIL (1238), Canara Bank (1271), PNB (1286), ITC (1311), Infosys (1320), Wipro (1343), BOI (1344), BOB (1358), HDFC (1380), Sail (1393)

Slide 59: Revenue Realised vs Power Purchase per unit
Revenue Realised Revenue Realised Vs Power Purchase per unit input (2003-04) 2.65 2.56 2.6 2.33 2.4 2.27 2.2 2.07 1.99 Rupees 2.0 1.86 1.83 1.83 Net Margin 0.75 1.8 Net Margin 0.33 1.6 1.58 1.58 1.58 1.58 1.58 1.58 1.4 1.52 1.52 1.52 1.2 Apr May Jun Jul Aug Sep Oct Nov Dec TPC/060404 59

Slide 60: Revenue Collection Comparison
Revenue Collection Comparison Comparison of Revenue Collection (2002-03 Vs 2003-04) 120 116.52 2003-04 110 113.09 113.27 107.37 105.47 105.32 104.48 100 104.11 101.84 Rs. Crores 96.46 90 92.01 89.82 2002-03 88.37 85.76 80 80.72 79.97 80.36 70 73.64 60 Apr May Jun Jul Aug Sep Oct Nov Dec TPC/060404 6

Slide 61: Business Lifeline - Power Reliability
Business Lifeline - Power Reliability Energy Distribution (FY 04) NDPL 30% Other Discoms 70% Load Shedding (FY 04) NDPL 15% Other Discoms 85% TPC/060404 61
Source: Internet Archive copy of tatapower.com
More decks from Tata Power Company Limited
Q2 FY27 Earnings Presentation72 slides · Nov 11, 2026
Q1 FY27 Earnings Presentation70 slides · Jul 27, 2026
Shareholder Meeting (July 2026)13 slides · Jul 7, 2026
Q4 FY26 Earnings Presentation69 slides · May 12, 2026
Q4 FY26 Earnings Presentation70 slides · May 12, 2026
Q3 FY26 Earnings Presentation71 slides · Feb 4, 2026