Zanaga Iron Ore Co. Ltd. · LSE:ZIOC
Zanaga Iron Ore — Mysteel conference, Xiamen, China, November 2013
14 slides from Zanaga Iron Ore's conference presentation, November 2013

Slide 1: Zanaga Iron Ore Project
Zanaga Iron Ore Project Mysteel conference Xiamen, China November 2013

Slide 2: Zanaga Project
Zanaga Project • World class iron ore project in the Republic of Congo • Resource – 6.8Bt (32% Fe) • Reserves – 2.5Bt (34% Fe) • Experienced leadership and Board • Owned by Glencore and Zanaga Iron Ore Company • Post-PFS review identified attractive opportunity for Staged Development of the Zanaga P

Slide 3: Zanaga Project location
Zanaga Project location • Located in the Republic of Congo, 300km north-east of the major Central African port city of Pointe Noire Cameroon Republic • RoC is a favourable destination for resource investment, politically stable since 1999 and a government that recognises the importance of the projec

Slide 4: Project ownership structure
Project ownership structure Zanaga Project 50% +1 Jumelles Ltd 50% - 1 share share JV Agreement • Listed on London and Hong Kong Stock Exchanges • Listed on London Stock Exchange (ZIOC) • Current rating BBB (stable) / Baa2 (stable) • Cash on B/S: $35m at 30 June 2012 • Leading integrated producer an

Slide 5: Work Programmes
Rapid exploration and engineering progress Work Programmes 30Mtpa Q2: Mining Lease Completion of Rail Staged Application Initial Preliminary Rail PFS in PFS and Value 30Mtpa Development (supported by FS Exploration Studies progress Engineering Pipeline PFS scope and SEIA) 2007 2008 2009 2010 2011 20

Slide 6: World scale mineralisation
World scale mineralisation 175,000m of exploration drilling has converted into a large, well defined ore body Photo Lithology Average Fe Mineral Resource Statement Tonnes Fe SiO2 Al2O3 P SOL Classification Mt % % % % Measured 2,400 34.0 43.0 3.3 0.048 CAN Indicated 2,290 30.8 46.6 3.0 0.052 Inferred

Slide 7: Flexible development pathway
Flexible development pathway Indicative 12+2Mtpa Stage One (US$m) Previous 30Mtpa PFS (US$m) Initial capital cost reduced to 1/3rd c.$2.5-3.0bn $7.4bn Improved capital cost intensity c.$200/annual tonne $245/annual tonne Attractive LOM operating costs c.$37-40/t $23/t 60-62% Fe (DSO) Premium product

Slide 8: DSO opportunity
DSO opportunity Sampling of high grade DSO ore (60% Fe) Stage One DSO potential of up to 2Mtpa • Based on at least 3-5Mt of “true” DSO, with opportunity to increase to 250Mt through limited processing • Low capital cost increment to pellet feed project • Leverage existing road and rail infrastructur

Slide 9: High grade product at low strip ratio
High grade product at low strip ratio Mining Processing Plant • Targeting the upper part of the orebody which • 12Mtpa pellet feed supplemented by 2Mtpa sinter feed consists of >600Mt friable ~42% Fe material (circa produced in first stage of flowsheet 20 year life) - 66% Fe PF with 3% Silica and 0.

Slide 10: Demonstrated feasibility of competitive pipeline transport
Demonstrated feasibility of competitive pipeline transport Pipeline selected for primary Staged development transport solution • Stage One – 500mm (20inch) pipeline with 2 • Lower capital cost and in-line with project scale pumping stations • Very low operating cost • Stage Two – 650mm (26inch) pipe

Slide 11: Mine to Port Logistics
Mine to Port Logistics From To By Distance Zanaga Project Exploration Licenses Mine Pointe Noire Road 470km Mine Pointe Noire Pipeline 370km Mine Loudima Road 240km Loudima Pointe Noire Rail 215km Pipeline Corridor Mine Mossendjo Road 170km Mossendjo Pointe Noire Rail 360km Pipeline indicative topog

Slide 12: Stage One port options
Stage One port options • Stage One currently based on owner-built Richards Bay Coal Terminal service harbour and trans-shipping operation Multi-user with Glencore as shareholder • Optionality: • Third party built similar or deep water port • Early low tonnages via existing Pointe-Noire port faciliti

Slide 13: Power opportunities
Power opportunities • Existing grid supplied by low cost power sources Refurbished 220kV transmission lines • Gas generated power using flare gas from oil industry • Existing hydro power • Stage One based on use of national grid, with potential for new hydro power from nearby projects • Stage Two re

Slide 14: Investment Highlights
Investment Highlights Robust project fundamentals • Large ore body defined to support long life development • High quality product specifications Deliverable and financeable project scope • Potential for early DSO production • Reduced capital intensity and quantum • Optionality with respect to por
Source: Internet Archive copy of zanagairon.com
More decks from Zanaga Iron Ore Co. Ltd.
Investor Presentation (May 2026)36 slides · May 6, 2026
Mining Indaba 202622 slides · February 2026
Investor Presentation (December 2025)37 slides · December 2025
Investor Day (March 2025)32 slides · Mar 18, 2025
Investor Presentation (November 2023)23 slides · November 2023
Investor Presentation (2016)12 slides · 2016