Orbit Resources Limited · ASX:OBT

Orbit Resources — Godolphin Resources — Shareholder Meeting (June 2024)

26 slides from Orbit Resources's shareholder meeting presentation, Jun 13, 2024

  1. Slide 1: Shareholders' General Meeting

    Shareholders’ General Meeting 1 3 J u n e 2 0 2 4 | A S X : G R L F OC U S ED ON B ECO MI N G AN I NT EG R A L PR O D UC ER I N A U S T R AL I A’S C R I TI C A L M I NER AL S A ND F U TU R E M ETA LS S U PPLY C H AI N RA R E E A R T H E LE ME NT S | C O P P ER -G O LD -BA S E M ET A L S

  2. Slide 2: Disclaimer and Competent Persons Statement

    DISCLAIMER AND COMPETENT PERSONS STATEMENT COMPETENT PERSONS STATEMENT JORC INFORMATION The Presentation has been prepared with reference to public reports made by Ardea Resources Limited (Ardea) (ASX:ARL) and Godolphin Resources Limited (Godolphin or Company) (ASX:GRL). Notably, the Presentation in

  3. Slide 3: Corporate Snapshot

    CORPORATE SNAPSHOT Major shareholders % held Shares on Issue Options on Issue American Rare Earths Limited 12.15% 213.5m 65.6m Brian O’Shannassy & Associates 5.06% Market Capitalisation Shares Price Ian Buchhorn & Associates 4.99% 4.7m $0.022 Saba Nominees Pty Ltd 3.12% Cash (as at 31ˢᵗ March 2024)

  4. Slide 4: Investment Highlights

    INVESTMENT HIGHLIGHTS Focused on the development of projects Focused on development of Narraburra following containing critical minerals and future metals recent appointment of Ausenco to lead scoping across an established tenement suite in NSW study with ongoing exploration initiatives planned Maid

  5. Slide 5: NdPr Prices Strengthening from 12-Month Lows

    NDPR PRICES STRENGTHENING FROM 12-MONTH LOWS • The NdPr price has witnessed a downturn over the last 12 months – however, recent data highlights a ~10% increase in pricing in the last month • Demand continues to increase and further price rises are anticipated for H2 CY2024 • NdPr oxide is likely to

  6. Slide 6: Rare Earths Production

    RARE EARTHS PRODUCTION A GLOBAL SHIFT TO AUSTRALIA FORECAST RARE EARTHS OXIDE PRODUCTION OUTSIDE CHINA¹ • Australia continues to build capacity in rare earths mining and refining - in line with other advanced economies which are continuing to prioritise the diversification of supply chains • This sh

  7. Slide 7: Significant Foothold in NSW

    SIGNIFICANT FOOTHOLD IN NSW A STABLE JURISDICTION Project suite: • Narraburra (100%) – Rare earth elements (REE) • Cambrai (100%) – REE, tin and copper • Trungley (100%) – REE • Yeoval (100%) – Copper and gold • Copper Hill East (100%) – Copper and gold • Gundagai North & South (100%) – Gold GRL MAI

  8. Slide 8: Narraburra: Flagship Asset with Scale Potential

    NARRABURRA FLAGSHIP ASSET WITH SCALE POTENTIAL Identified by the Australian Government Department of Industry, Science and Resources in 2022 Critical Minerals Strategy as a major REE deposit – also listed as a critical minerals project by the Government’s Trade and Investment Commission. Maiden JORC

  9. Slide 9: Rare Earth Distribution

    RARE EARTH DISTRIBUTION TOTAL RARE EARTH OXIDES (TREO) VERSUS TOTAL PERMANENT MAGNET MINERAL OXIDES (MREO) DISTRIBUTION 2 MREO 24% 1 TREO = 550.45ppm 76% 1 Total Rare Earth Oxides (TREO) = Total REOs (La2O3 + CeO2 + Pr6O11 + Nd2O3 + Sm2O3 + Eu2O3 + Gd2O3 + Tb4O7 + Dy2O3 + Ho2O3 + Er2O3 + Er2O3 + Tm2

  10. Slide 10: Narraburra: Low Cost Development Potential

    NARRABURRA LOW COST DEVELOPMENT POTENTIAL Outstanding metallurgy results point to Narraburra’s low-cost development & processing potential Testing completed with Australian Nuclear Science and Technology Organisation (ANSTO) Phase 1: 2023 delivered 92% recovery of key magnet REEs (Pr, Nd, Tb, Dy) wi

  11. Slide 11: Narraburra: Clay Hosted Rare Earth Mineralisation

    NARRABURRA CLAY HOSTED RARE EARTH MINERALISATION Hylogger³ Spectroscopic logging of all diamond drill core was undertaken by the Geological Survey of NSW at its WB Clarke Geoscience Centre at Londonderry • Known association of REE mineralisation with Kaolin (Clay) worldwide • REE distribution is hig

  12. Slide 12: Additional Upside Through 100%-Owned REE Projects

    ADDITIONAL UPSIDE THROUGH 100%-OWNED REE PROJECTS GRL HAS BUILT A SIGNIFICANTLY LARGE LANDHOLDING OF REE PROJECTS IN THE LFB Trungley, New South Wales – EL9628 • Surrounds Narraburra to the north, east and south • Contains Boginderra granite, an A-type granite of the Narraburra suite containing REE

  13. Slide 13: Narraburra: Multiple New Rare Earth Exploration Targets

    NARRABURRA MULTIPLE NEW RARE EARTH EXPLORATION TARGETS IDENTIFIED AT NARRABURRA WITH POTENTIAL TO SIGNIFICANTLY UP SCALE THE PROJECT • Exploration targets with potential to expand the existing JORC 2012 Mineral Resource Estimate, have been identified at Godolphin’s 100% owned Narraburra Rare Earth E

  14. Slide 14: 2024 Exploration Timeline – A Distinct Focus on REE

    2024 EXPLORATION TIMELINE – A DISTINCT FOCUS ON REE NARRABURRA NARRABURRA UPDATE TO MINERALOGICAL NURRABURRA MINERALOGY MRE COMMENCEMENT AND DRILLING – AND metallurgy COMMENCES OF NARRABURRA NURRABURRA METALLURGICAL EXPAND results MINING MINING STUDY TEST WORK RESOURCE SIZE SCOPING STUDY RESULTS CAM

  15. Slide 15: New Gold-Copper Soil Anomaly Defined at Spring Creek Prospect

    New Gold-Copper Soil Anomaly Defined At Spring Creek Prospect • A new gold - copper – arsenic in soil anomaly has been defined along a splay of the Narangal Thrust fault, on the Copper Hill East Project • Anomaly was defined from assay results obtained from a soil orientation line, conducted to dete

  16. Slide 16: Investment Summary

    INVESTMENT SUMMARY EXCEPTIONAL OPTIONALITY AND POTENTIAL • Maiden JORC 2012 MRE* at Narraburra Rare Earth project to 94.9Mt @ 739 ppm ⚬ including high grade core of 20Mt @ 1,079 TREO using a 600 ppm cut off • 126% uplift to TREO grade • 50% Indicated Resource • 30% increase to tonnage from previous

  17. Slide 17: Appendix

    | -S Godolphin APPENDIX

  18. Slide 18: Copper, Gold and Base Metals Projects

    APPENDIX 1 COPPER, GOLD AND BASE METALS PROJECTS Lewis Ponds: • JORC 2012 Minera Resource Estimate of 6.20 Mt at 2.0g/t gold, 80g/t silver, 2.7% zinc, 1.6% lead and 0.2% copper • Resource is part of a larger mineral system extending over 9km SE with extensive gold, copper and base metal workings • Y

  19. Slide 19: Increasing the Lewis Ponds Opportunity

    APPENDIX 2 INCREASING THE LEWIS PONDS OPPORTUNITY Spicers Lode open to the north – no drilling Large gaps within the resource – infill drilling Untested Downhole EM off hole conductors – not tested Lewis Ponds Copper rich south – no modern follow-up Re-interpretation of soil geochemical data confirm

  20. Slide 20: Increasing the Lewis Ponds Opportunity

    APPENDIX 2 INCREASING THE LEWIS PONDS OPPORTUNITY Results from an orientated soil survey north of known mineralisation at Lewis Ponds identified areas of elevated gold in soils, co-incident with VTEM anomalies with a similar signature to the main mineralised lodes at Lewis Ponds – direct drill targe

  21. Slide 21: Unlocking Value at Lewis Ponds

    APPENDIX 2: UNLOCKING VALUE AT LEWIS PONDS Grade Contained metal Tonnage Class (Mt) Au (g/t) Ag (g/t) Zn ((%) Pb (%) Cu (%) AuEq (g/t) Au (koz) Ag (moz) Zn (kt) Pb (kt) Cu (kt) Inferred 6.2 2.0 80 2.7 1.6 0.2 6.0 398 15.9 170 99 11 Total 6.2 2.0 80 2.7 1.6 0.2 6.0 398 15.9 170 99 11 *Lewis Ponds Res

  22. Slide 22: Yeoval Copper Gold Project

    APPENDIX 3 YEOVAL COPPER GOLD PROJECT Yeoval Project (EL8538) covers ~290km2 , with over 60 historic copper- gold mine workings along 20km strike length Typical porphyry Cu-Au style mineralisation at Yeoval with disseminated and vein-hosted chalcopyrite, molybdenite and bornite Recent diamond drilli

  23. Slide 23: Copper Hill East Copper and Gold Project

    APPENDIX 4 COPPER HILL EAST (CHE) COPPER AND GOLD PROJECT • Project located in the same volcanic sequence as Boda (50km north) and Cadia- Ridgeway (50km south) • Two drilling phases completed in 2020 • Preliminary indications from work include: ⚬ Copper and gold in soils anomaly ⚬ Minimum of 7km str

  24. Slide 24: CHE Turrawonga – Copper Gold Porphyry Potential

    APPENDIX 4 CHE TURRAWONGA – COPPER GOLD PORPHYRY POTENTIAL • Prospect hosts a magnetic anomaly with coincident Au/Cu anomaly-tested with four RC drill holes, two with diamond tails • Drill holes intersected: ⚬ Multiple intrusions ⚬ Zones of strong magnetite and pyrite ⚬ Chlorite-epidote-albite alter

  25. Slide 25: Slide 24 IM0 2 March 2021

    Slide 24 IM0 2 March 2021 Ian Morgan, 2024-06-12T02:11:30.045

  26. Slide 26: Contact

    CONTACT G O D O L PHI NRE SO U R C ES.CO M.AU Jeneta Owens – Managing Director [email protected] Unit 13, 11-19 William Street Orange, NSW, 2800 Australia +61 417 344 658

Godolphin Resources — Shareholder Meeting (June 2024) on 6ix