Miller Energy Resources — Investor Presentation (June 2014)
25 slides from Miller Energy Resources's investor presentation, Jun 24, 2014
Slide 1: NYSE: MILL
NYSE: MILL
Slide 2: Forward Looking Statements
2 Forward Looking Statements Certain statements in this presentation and elsewhere by Miller Energy Resources¸ Inc. are "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. These forward-looking statements involve the implied assessment that the re
Slide 3: Executive Summary Company Highlights
3 Executive Summary Company Highlights Alaska Assets Miller Resources, Inc. Highlights (1) Stock Ticker (NYSE) MILL Price (6/23/14) $5.51 Shares Outstanding (6/23/14) 45.24 million Market Capitalization (6/23/14) $249.3 million Total Capitalization $543.6 million Institutional Ownership 36% Insider
Slide 4: Cook Inlet Region Pacific Assets and North Fork Assets
4 Cook Inlet Region Pacific Assets Net production of 2,500 BOE/D (3,000 BOE/D gross) at April 30, 2014 Significant development opportunity through 3P The Osprey platform has capacity for 21 wells producing 25,000 BOE/D With eight wells currently in operation, Miller has capacity to add 13 ne
Slide 5: Shareholder Value With Milestones
5 $0.00 $2.00 $4.00 $6.00 $8.00 $10.00 Ju l-0 8 Oc t-0 8 Ja n- 09 Ap r-0 9 Ju l-0 9 Oc t-0 9 Ja n- 10 Ap r-1 0 Ju l-1 0 Oc t-1 0 Ja n- 11 Ap r-1 1 Ju l-1 1 Oc t-1 1 Ja n- 12 Ap r-1 2 Ju l-1 2 Oc t-1 2 Ja n- 13 Ap r-1 3 Ju l-1 3 Oc t-1 3 Ja n- 14 Ap r-1 4 Shareholder Value With Milestones 1. Scott M.
Slide 6: Miller Energy Investment Strategy
6 Miller Energy Investment Strategy ACQUIRE OPTIMIZE EXPLORE Focus on Alaskan assets Looking for assets with significant upside Assets with significant infrastructure in place Build or acquire technical expertise Improve on past mistakes Apply new technologies and operational expertise
Slide 7: Acquisition History
7 Acquisition History $2.25 million plus cures Pacific Energy Assets Savant Energy Assets North Fork Assets Purchase Price Common Equity Contribution Production Increase Infrastructure Value / Potential Reserves in Place $11 million to date At acquisition: no production Current gross product
Slide 8: Miller Growth & Operating Efficiencies
8 50 366 0 50 100 150 200 250 300 350 400 2010 Dec 2013 Pr ov ed De ve lop ed ($ m illi on s) 6,100 4,600 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 2009 Current Pr od uc tio n ( BO E/ D) Gross Net 70 20 0 10 20 30 40 50 6 70 80 2009 Op C ost & LO E ($ /B OE ) Miller Growth & Operating Efficiencies
Slide 9: Alaska Operating Environment
9 Alaska Operating Environment Underdeveloped Basins Both North Slope and Cook Inlet provide additional development opportunities Alaska Cash Rebates 20% to 65% of development costs reimbursed by the state Proceeds generally received 4 to 6 months following application Not contingent on succ
Slide 10: Inflection Point for Miller Energy Resources
10 Inflection Point for Miller Energy Resources Significant access to low cost capital Team has grown from six in 2009 to over 75 employees, excluding Savant, with all key functions in-house Vertically integrated - Own 3 drilling rigs, 1 under contract and looking to acquire additional rigs -
Slide 11: Redoubt Shoal Hemlock Structure
11 Redoubt Shoal Hemlock Structure Step out drilling commenced with RU-9 and we expect to have drilled into four new fault blocks by end of 2015 Positive DST tests in North & South Step Outs in 1960s RU-1 drilled in Central fault in 2001 – 1,089 IP & 10 mmbbls PUD RU-2 drilled in South fault 2002 –
Slide 12: West McArthur River Unit
12 West McArthur River Unit 13.3 MMBbls recovered from WMRU to date Greater than 20% primary recovery based on estimated oil in place Positive initial results from WMRU-2B with indications of additional primary recovery potential from fault block Sword step out well successfully drilled in November
Slide 13: North Fork Unit
13 North Fork Unit 100% working interest in $185 million of Proved and Probable PV-10 Probable SEC PV-10: $93.1 Million Total Proved SEC PV-10: $92.3 Million (Per Dec. 2013 Ryder Scott reserve report) Includes six (6) natural gas wells, production and processing equipment and 15,464 acres
Slide 14: North Slope Acquisition - Savant
14 North Slope Acquisition - Savant Binding agreement to acquire Savant Alaska, LLC subject to due diligence and regulatory approval, for $9.0 MM Savant to become wholly-owned subsidiary of MILL MILL to own 67.5% working interest in the Badami Unit, with ASRC Exploration, LLC remaining as a 32
Slide 15: Robust Drilling Inventory
15 Robust Drilling Inventory Year Well Area Discussion WMRU-2B WMRU Oil target, attic play NFU 14-25 NFU Workover RU-9 RU South step out WF-3 WF Gas target NFU 41-35 NFU Behind pipe NFU 23-25 NFU Side track RU-12 RU Oil target, Northern FB Olsen WMRU Gas target Sabre WMRU Oil target NFU 07 NFU Gas t
Slide 16: Miller Energy Value Proposition
16 Miller Energy Value Proposition Significant Asset Base 4 Distinct producing fields Redoubt, WMRU, North Fork, TN 54.8 MMBOE of P1, P2 and P3 Reserves (per R.E.D, excluding North Fork) $1.4 Billion of PV-10 (per R.E.D., excluding North Fork) Advantages of State-Of-the- Art Infrastructure Equipment
Slide 17: Appendix
Appendix Dynamic High Growth Leader
Slide 18: Management Biographies
18 Management Biographies Deloy Miller - Mr. Miller, our founder, has been Chairman of the Board of Directors since December 1996, and was CEO from 1967 to August 2008, and COO from August 2008 to July 2013. Since then, Mr. Miller has been Executive Chairman of the Board of Directors. He is a season
Slide 19: Alaska Activities
19 Alaska Activities Sword-1: Total production to date of approximately 116,000 barrels of oil – received approval to commingle next two zones on June 19, 2014 WMRU-8: Drilled & completing – modifying completion WMRU-2B: Initial production rates approximately 630 BOED RU-9: Currently drillin
Slide 20: New Rig-36
20 New Rig-36 Recent Land-based Rig Purchase Option Entered into option to purchase rig for $3.25MM, including deposit ~2400-HP, ~25,000’ drilling capabilities Planned rig improvements needed for Sabre prospect (high PSI mud system, pits, etc.) Plan to drill Sabre from WMRU pad Up to 6 wel
Slide 21: Pro Forma Capitalization
21 Pro Forma Capitalization $250 million facility $60 million initial borrowing base $20 million drawn at close Key credit facility terms include: L+300 to L+400 pricing Three (3) year maturity Undrawn commitment fee of 50bps to 75bps Led and arranged by KeyBanc Capital Markets Oth
Slide 22: Decreasing Cost of Capital
22 Decreasing Cost of Capital Current Financing $250MM RBL facility priced at L+300 – L+400 ̶ $60MM borrowing base available with $20MM drawn at close $175MM 4-Year Second-Lien Secured Credit Facility by Apollo Investment Corp and Highbridge Principal Strategies at 11.75%, fully drawn at closing
Slide 23: Hedging
23 Hedging Hedging Summary Hedge Summary Over 90% of current net oil production hedged Charge for novation of hedges to KeyBanc reduced price by $0.30/bbl The North Fork Unit has the vast majority of its gas production effectively hedged through ENSTAR gas delivery contracts – Contract price c
Slide 24: Trans-Foreland Pipeline
24 Trans-Foreland Pipeline Pioneers of concept, new crude oil pipeline linking west side to east side Partnered with Tesoro pipeline group to fund feasibility, design and engineering Over the last two years our companies have worked together to advance the permitting and engineering of the pro
Slide 25: Contact Information
25 Contact Information Miller Energy Resources, Inc. 9721 Cogdill Road, Suite 302 Knoxville, TN 37932-3425 Phone: 865-223-6575 [email protected] www.millerenergyresources.com Investor Relations MZ Group - North America Derek Gradwell SVP, Natural Resources Phone: 512-270-6990 dgradwell@
Miller Energy Resources — Investor Presentation (June 2014) on 6ix