Nexus Minerals Ltd. · ASX:NXM
Nexus Minerals — South-West Connect 2026
24 slides from Nexus Minerals's conference presentation, Oct 28, 2026
Slide 1: South-West Connect Presentation
rsonal use only SOUTH-WEST CONNECT PRESENTATION 28-29 OCTOBER 2026
Slide 2: Disclaimer
DISCLAIMER This do cu ment co ntains for ward looking statements. Forward looking statements are not based on historical facts but are based on Nexus’s cur rent expectations of fu ture resu lts o r events. Th ese forward lo okin g statemen ts are su bject to risks, uncertain tie s and assump tions w
Slide 3: Corporate Profile
CORPORATE PROFILE NEXUS MINERALS (ASX:NXM) rsonal use only COMPANY OVERVIEW NEXUS MINERALS LIMITED ASX: NXM SHARES 705.6M SHARE PRICE A$0.04 MARKET CAP A$28.2M CASH (30/09/2026) A$7.95M ENTERPRISE VALUE A$20.25M TOP 20 49% CHAIRMAN – MR. PAUL BOYATZIS MANAGING DIRECTOR – MR. ANDY TUDOR +35 years in
Slide 4: Company Projects
COMPANY PROJECTS WEST AUSTRALIAN GOLD FOCUS rsonal use only WALLBROOK PROJECT Exploring for large scale gold deposits Displaying strong spatial continuity Presenting prime opportunity for development Growing gold mineral resource base PINNACLES PROJECT High-grade underground deposit To 100% Ownershi
Slide 5: Large Scale Gold Deposits
LARGE SCALE GOLD DEPOSITS NEXUS GROUP GOLD PROJECTS Wallbrook Gold Project & Pinnacles Gold Project rsonal use only Group Mineral Resources of 14Mt @1.6g/t Au for 709,000oz Multi-million ounce gold district Compelling exploration and development opportunity Region dominated by significant gold produ
Slide 6: Wallbrook & Pinnacles Updated Combined Mineral Resource Estimate
LARGE SCALE GOLD DEPOSITS WALLBROOK & PINNACLES GOLD PROJECTS Updated Combined Mineral rsonal use only Resource Estimate (MRE) 6
Slide 7: Large Scale Gold Deposits
rsonal use only LARGE SCALE GOLD DEPOSITS WALLBROOK GOLD PROJECT
Slide 8: Emerging Gold Camp
WALLBROOK GOLD PROJECT EMERGING GOLD CAMP Wallbrook Resource combined MRE across the three deposits rsonal use only 13.3Mt at 1.5g/t Au for 631,000oz Indicated Mineral Resource of 4.3Mt at 1.5g/t Au for 207,000oz (33%) Inferred Mineral Resource of 9.0Mt at 1.5g/t Au for 424,000oz (67%) Resource incr
Slide 9: Emerging Gold Camp
WALLBROOK GOLD PROJECT EMERGING GOLD CAMP Long section shows defined resource envelopes of Nexus and Northern Star deposits rsonal use only Growth opportunity exists in underexplored areas immediately along strike and down dip of existing deposits 9
Slide 10: Crusader-Templar Deposit
WALLBROOK GOLD PROJECT CRUSADER-TEMPLAR DEPOSIT rsonal use only Crusader–Templar Updated MRE (incl Clement) 10.8Mt at 1.5g/t Au for 533,000oz Diamond drilling commenced October 2026 Bulk density and metallurgical samples Confirm new lode geometry Indicated material comprising 39% of the MRE Crusader
Slide 11: Crusader-Templar Deposit
WALLBROOK GOLD PROJECT CRUSADER-TEMPLAR DEPOSIT rsonal use only Deposit exceeds 530,000oz including an underground of 1.4Mt at 1.9g/t Au for 86,000oz beneath the optimised pit shell The grade continues to increase at depth with higher grade in the underground component 11
Slide 12: Payns Deposit
WALLBROOK GOLD PROJECT PAYNS DEPOSIT rsonal use only Maiden Mineral Resource 1.2Mt at 1.3g/t Au for 50,000oz Diamond drilling commenced October 2026 Bulk density and metallurgical samples Support conversion to Indicated resource category Test fold hinge geometry Footprint of 900m x 750m, approximate
Slide 13: Payns Deposit
WALLBROOK GOLD PROJECT PAYNS DEPOSIT rsonal use only Significant intercepts from Nexus RC drilling 5m at 12.83g/t Au within 21m at 3.26g/t Au from 39m 6m at 3.15g/t Au within 22m at 1.14g/t Au from 28m 3m at 3.89g/t Au within 8m at 1.70g/t Au from 37m 5m at 8.20g/t Au within 13m at 3.35g/t Au from 3
Slide 14: Branches Deposit
WALLBROOK GOLD PROJECT BRANCHES DEPOSIT Maiden Branches MRE rsonal use only 1.3Mt at 1.1g/t Au for 48,000oz A A’ Diamond drilling commenced October 2026 Bulk density and metallurgical samples Support conversion to Indicated resource category Orientation of deeper high-grade zone Footprint of 1,500m
Slide 15: Branches Deposit Section A-A'
WALLBROOK GOLD PROJECT BRANCHES DEPOSIT rsonal use only Section A- A’ 15
Slide 16: Amand Prospect
WALLBROOK GOLD PROJECT AMAND PROSPECT Diamond drilling commenced October 2026 rsonal use only Structural data to guide future resource definition drilling Footprint of 1,700m x 600m and situated 2.5km northeast of Crusader-Templar Deposit Amand is situated on a granted mining lease and is easily acc
Slide 17: High-Grade Underground Gold Deposit: Pinnacles Gold Project
rsonal use only HIGH-GRADE UNDERGROUND GOLD DEPOSIT PINNACLES GOLD PROJECT
Slide 18: Pinnacles Gold Project
PINNACLES GOLD PROJECT Located 15km south of Carosue Dam Operations rsonal use only High-Grade underground deposit Nexus to 100% ownership (expected Q4 2026) JORC 2012 Combined MRE 609,000t @ 4.0g/t Au for 78,000oz Au JORC 2012 U/G MRE 450,000t @ 4.6g/t Au for 66,000oz Au (U/G only) U/G Mine develop
Slide 19: Pinnacles Gold Project Underground Study
PINNACLES GOLD PROJECT rsonal use only Underground Study 80m – 280m Conceptual Design Only 19
Slide 20: rsonal use only
Over 7,500km2 of prospective tenure rsonal use only First mover advantage allows for regional scale exploration targeting with one of the largest pegging exercises in NSW history Exploration for a range of minerals Gold - Copper – LCT – Tin - Tungsten LCT pegmatites are associated with highly fracti
Slide 21: NSW Minerals Project 7,500km2 Mega Peg
NSW MINERALS PROJECT 7,500KM2 “MEGA PEG” rsonal use only A review of open file geology and whole-rock geochemistry confirmed that much of the exploration ground granted in southern NSW is underlain by reduced, fractionated, peraluminous S-type granites Southern Geoscience Consultants have completed
Slide 22: Projects Summary
PROJECTS Nexus Group Combined MRE 14Mt at 1.6g/t Au for 709,000oz SUMMARY rsonal use only WALLBROOK GOLD PROJECT PINNACLES U/G GOLD PROJECT NSW MINERALS PROJECT HIGHLY PROSPECTIVE & STRATEGIC HIGH GRADE GOLD ~7,500KM 2 GRANTED TENURE LANDHOLDING OPPORTUNITY First mover advantage regional Updated MRE
Slide 23: Appendix: JORC Tables
APPENDIX 1 JORC TABLES rsonal use only Pinnacles Project Combined JORC 2012 Mineral Resource Estimate 23
Slide 24: rsonal use only
rsonal use only 2/41-47 Colin Street West Perth WA 6005 P (08) 9481 1749