American Electric Power Company, Inc. · NASDAQ:AEP

American Electric Power — Barclays Capital Utilities Day 2011

21 slides from American Electric Power's conference presentation, Mar 17, 2011

  1. Slide 1: Barclays Capital Utilities Day, Zurich, Switzerland

    Barclays Capital Utilities Day Zurich, Switzerland March 17, 2011 1

  2. Slide 2: Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995

    “Safe Harbor” Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934. Although AEP and each of its Registrant Subsidiaries believe that their expectations are

  3. Slide 3: Presenters: Nick Akins and Brian Tierney

    Nick Akins - President Brian Tierney – EVP and CFO 3

  4. Slide 4: American Electric Power

    American Electric Power Generation owned11 (GW) Generation owned (GW) Southern 42.9 Serving electric customers in Co NextEra 11 states 42.7 Energy AEP 39.9 Duke 38.5 One of the largest Energy U.S. electricity generators Transmission miles11 (‘000s) Transmission miles (‘000s) A EP 39.0 Southern 27.0

  5. Slide 5: Highly Diversified Regulated Utility Platform

    Highly Diversified Regulated Utility Platform 2010 On-Going Earnings 2010 Retail Load Contribution Public Service of Kentucky Southwestern Oklahoma Power 3% Wholesale * 10% Electric 6% Power 11% Residential Ohio Power 30% 24% Texas Industrial 8% 33% All Others Columbus 5% Southern Power Indiana & 17

  6. Slide 6: Domestic Generation Fleet

    Domestic Generation Fleet Generation Capacity by Fuel Type 2010 Generation Production by Fuel Type Based on 39,910 MW Based on 173.2 TWh Pumped Pumped Storage/Hydro/ Nuclear Storage/Hydro Wind/Solar 9.0% 0.5% Nuclear 7% 5% Nat. Gas/Oil 8.0% Nat. Gas/Oil 23% Coal/Lignite 65% Coal/Lignite 82.5% Genera

  7. Slide 7: Emissions Reductions since 2000

    Emissions Reductions since 2000 U.S. Power Plant SO2 Emissions AEP SO2 Emissions 11.2 10.6 10.2 10.6 10.3 10.2 1,020 997 9.4 924 937 in million U.S. tons 8.9 915 900 in thousand U.S. tons 853 7.6 749 55% 5.7 49% 638 reduction reduction 457 since 2000 since 2000 2000 2001 2002 2003 2004 2005 2006 200

  8. Slide 8: The Pressure on Coal Generation

    The Pressure on Coal Generation Key EPA Actions Pending  Transport Rule – Proposed July 2010 All Coal Fired Power Plants Clean Air Transport Rule  “Coal Ash” Rule – Proposed May 2010 Mo lat tal re Renewable Mandates ion ,T gis en  Mercury and other Hazardous igh Le onm Pure Fundamentals Air Pollu

  9. Slide 9: Continual Evaluation is Required

    Continual Evaluation is Required “Fully-Exposed” “Partially-Exposed” “Least-Exposed” Probable Retirement Evaluating potential retirement Not likely to be retired CCS Candidates Smaller, older, less-efficient coal units that will not be economic if retrofitted 64,000 MW 5,000 MW 20% 20% Newer and lar

  10. Slide 10: Continued Investment in Utility Platform

    Continued Investment in Utility Platform Hydro/Renewables Nuclear 7%  Plan for old, small coal units 5% – Initially operate seasonally Natural Gas – Transition towards retirement 23% Coal 65% – Regulatory plan for recovery  Continue evaluation of “partially exposed” units for additional controls C

  11. Slide 11: Transmission Investment Strategy

    Transmission Investment Strategy  Near-Term Investment – Electric Transmission Texas (ETT) secures near term investment opportunities, allowing AEP to invest in the large, growth-oriented Texas transmission market. Total project cost: $3 billion with a 9.96% ROE  Mid-Term Investment – Seven wholl

  12. Slide 12: Joint Venture Strategy: Long-term

    Joint Venture Strategy: Long-term  Strategy: JV’s secure new investment opportunities with local utilities to diversify AEP’s investment outside AEP’s traditional footprint while providing longer-term incremental earnings. JV projects are well-suited for FERC formula rate recovery mechanism, includ

  13. Slide 13: Traditional Ratemaking Environment

    Traditional Ratemaking Environment Growth in Net PP&E Regulatory Framework  Base Rates Net PP&E $40.0 ― Recovery of capital and financing % costs 7.4 G R = $37.2 ― Recovery of set level of O&M costs $35.0 CA $35.7 P &E $34.3 011P $33.0 $30.0 5-2  Recovery of Fuel Costs $ in billions 200 $29.9 $26.

  14. Slide 14: AEP Ohio ESP Filing – Core Policy Issues

    AEP Ohio ESP Filing – Core Policy Issues Investment in Ohio Jobs in Ohio Energy Security Supports economic Jobs are a key Secure, reliable and development and component of growth predictable electricity essential tax base potential in Ohio supply is basis for sustained investment and employment in O

  15. Slide 15: Capital Allocation

    Capital Allocation In this economic recovery cycle, capital allocation requires balance for spending that considers the obligation to serve, the ability to obtain rate increases, a balance sheet to support the plan, and the total return proposition to shareholders  Capital for Growth – Capital budg

  16. Slide 16: Capital Expenditures

    Capital Expenditures $3,000 $2,900 $2,615 AEP Transco $2,487 $350 $2,500 $160 JV Equity $1 $47 $113 $280 Contributions, net $77 $2,243 $34 AEP River Ops & $50 $223 Other Non-Utility $457 $24 $56 Environm ental $2,000 $303 $319 $256 New Generation $ in millions $62 $263 $82 $133 Corporate/Other $1,50

  17. Slide 17: Rate Changes

    Rate Changes $700 Pending/Future $600 Settlement on file pending approval Secured $500 $ in millions $400 $659 $300 $235 $527 $450 $28 $200 $45 $352 $329 $100 $162 $0 2006A 2007A 2008A 2009A 2010A 2011E Note: Rate changes in this chart exclude revenues with offsetting costs Pending/future rate cases

  18. Slide 18: 2011 Ongoing Earnings Guidance

    2011 Ongoing Earnings Guidance 2010A: $3.03/share 2011E: $3.00-$3.20/share Near-Term Earnings Drivers AEP Total Normalized GWh Sales Quarter % Change vs. Prior Year  Recovering economy 15% 10%  Rate recovery from returns on capital 5% investment 2.5% 1.9% 1.7% 0.8% 1.1% 0%  Continued O&M discipli

  19. Slide 19: Earnings and Dividends

    Earnings and Dividends On-Going EPS History Since 2004 Dividend History Since 2004 $/share $/share 3.60 2.00 3.40 .1% .0 % $1.84 = 4 1.80 4 R $3.24 = 3.20 C AG $3.10 G R $1.71 $3.00 $2.97 $3.03 A $1.64 $1.64 C $1.58 3.00 1.60 $2.77 $1.50 2.80 $2.73 $1.40 $1.42 2.60 1.40 $2.33 2.40 1.20 2.20 2.00 1.0

  20. Slide 20: Long-term EPS Growth Rate

    Long-term EPS Growth Rate  4-6% EPS growth 2012-14 – Average annual capital spend between $2.9-3.4B Average Annual EPS Growth – Utility platform replacement capital defined over two periods of about $1.4B (annual depreciation) – Growth in rate base of $1.5-2.0B Period of 4-6% average per year, allo

  21. Slide 21: AEP Highlights

    AEP Highlights  Regulated Electric Utility – Regulatory and economic diversity – Operating Company Model  Focus on Capital Allocation – Capital for Growth – Return of Capital to Shareholders  Strong Balance Sheet – Stable credit ratings – Capital plan supported by cash flow – Strong liquidity pos