Slide 1: Unlocking Our Full Potential
UNLOCKING OUR FULL POTENTIAL Bank of America Merrill Lynch 2019 Global Metals, Mining and Steel Conference 14-15 May 2019

Slide 2: Cautionary Statement
CAUTIONARY STATEMENT Disclaimer: This presentation has been prepared by Anglo American plc (“Anglo American”) and comprises the written materials/slides for a presentation concerning Anglo American. By attending this presentation and/or reviewing the slides you agree to be bound by the following con

Slide 3: Our Long Term Performance Based on Three Pillars
OUR LONG TERM PERFORMANCE BASED ON THREE PILLARS Effectiveness Efficiency Sustainability Cash Flow Return on Capital Holistic across Business 3

Slide 4: Today We Are a Fundamentally Different Business
TODAY WE ARE A FUNDAMENTALLY DIFFERENT BUSINESS Copper equivalent production and productivity1,2 2012 to 2018 Number of assets 200 180 +98% 50% productivity 160 140 120 Production volumes1 100 80 108 10% 60 40 2012 2013 2014 2015 2016 2017 2018 Unit costs2 Production index (Cu Eq)1 Productivity inde

Slide 5: Leading Competitive Position
LEADING COMPETITIVE POSITION Competitive Sustainable Differentiated Average margin adjusted cost curve position3 Net debt:EBITDA5 Cu Eq growth6 2018-2023 ~20-25% 0.9x 45% Peer range ~15% 37% Peer 36% range Peer 0.3x range ~5% 0.0x Anglo Peers4 Anglo Peers4 Anglo Peers4 5

Slide 6: A Sustainable Business
A SUSTAINABLE BUSINESS Palladium grain Copper, nickel, steel (iron ore and metallurgical coal)

Slide 7: Innovation Is Needed to Ensure Sustainability
INNOVATION IS NEEDED TO ENSURE SUSTAINABILITY 1900 Today Future? 0.5% Cu 4% Cu 24t waste 1t waste 40kg Cu: 1t ore 8t ore 40kg 3m3 water 10 KWhr 6m3 water 160 KWhr Ever increasing scale Precise. Predictable. Reliable 7

Slide 8: Step-Change in Our Performance and Sustainability
STEP-CHANGE IN OUR PERFORMANCE AND SUSTAINABILITY Operating P101 FutureSmart Model MiningTM Stability and optimisation Exceeding industry best-in- Game-changing technology; class process & equipment data analytics; sustainability performance Incremental improvement Step-change 8

Slide 9: FutureSmart: Our Commitment to Sustainability
FUTURESMART: OUR COMMITMENT TO SUSTAINABILITY FutureSmart MiningTM Operational efficiency Fewer Trusted surprises Thriving Healthy Corporate Communities Environment Leader Access to resources 9

Slide 10: Our Tailings Safety Management
OUR TAILINGS SAFETY MANAGEMENT Industry leading dam safety management Tailings dams in our portfolio 6 levels of assurance: 2 external, 2 independent Group technical expertise Downstream/ other Group Technical Upstream Specialists Southern Australia Internal risk Africa assurance No upstream constru

Slide 11: A Unique Business
A UNIQUE BUSINESS Palladium grain

Slide 12: Asset Quality Plays to Global Demand Themes
ASSET QUALITY PLAYS TO GLOBAL DEMAND THEMES Diamonds Copper PGMs Bulks World leader World class growth World leader High quality niche Consumer World Greener World Electrified World 12

Slide 13: A Growing, World Class Copper Business
A GROWING, WORLD CLASS COPPER BUSINESS Quality assets with growth High value portfolio with long term potential Collahuasi ~240ktpa 7 (our share) ~1Mtpa at ~120c/lb 7 Los Bronces ~360ktpa 7 With further growth potential from: • existing assets Quellaveco • new projects • exploration ~300ktpa 7 13

Slide 14: De Beers: World Leader in Diamonds
DE BEERS: WORLD LEADER IN DIAMONDS Best-in-class business… …focused on consumers Global demand EBITDA mining margin8 Rest of world ~53% India Gulf USA China Trading business delivering stable margins Female self purchases9 Millennials9 ~8% ~25% ~60% of demand of demand 14

Slide 15: World Leader in PGMs
WORLD LEADER IN PGMs Asset focused Basket price driven by Pd and Rh $2,759/oz Mogalakwena Other Base metals ~50% Palladium Rhodium +283% 2018 cash margin Platinum Basket price Amandelbult Palladium +104% Targeting 25% further cost reductions PGM Basket +64% Platinum (4)% Processing A stable ~10% mar

Slide 16: Structural Trends Favouring High Quality Bulks
STRUCTURAL TRENDS FAVOURING HIGH QUALITY BULKS Iron ore: focus on premium products Metallurgical coal: world class operations Kumba production Minas-Rio production High quality portfolio EBITDA margin ~65%Fe ~67%Fe 86% 52% of which 68% is lump Pellet feed products Hard coking coal Production (Mt) Pr

Slide 17: A Growing Business
A GROWING BUSINESS Exploration drone - Kolomela Copper, nickel, steel (iron ore and metallurgical coal)

Slide 18: What Growth Means to Us
WHAT GROWTH MEANS TO US Growth in Growth in Growth in quality volume margins returns 18

Slide 19: Attractive High Returning Growth Options
ATTRACTIVE HIGH RETURNING GROWTH OPTIONS Growth options generating ~5% CAGR to 2023 Strong margins Attractive returns Fast payback >50% 19-30% <5 years Within disciplined capital allocation framework 19

Slide 20: Inherent Growth; Higher Margins at Long Term Prices
INHERENT GROWTH; HIGHER MARGINS AT LONG TERM PRICES Growth in production6 Portfolio upgrade P101 Technical changes FutureSmart MiningTM Operating Model Disciplined Investment ~135 110 100 2012 2018 2023 30% 42% ~45-50% Improvement in mining margin8 20

Slide 21: Our Investment Proposition
OUR INVESTMENT PROPOSITION Competitive Differentiated Sustainable Assets Capabilities Returns “Leading capabilities actively improving a competitive, world-class asset base to drive sustainable, attractive returns” 21 21

Slide 22: Footnotes
FOOTNOTES 1. 2012-2018 estimate. Copper equivalent is calculated using long-term consensus parameters. Excludes domestic / cost-plus production. Production shown on a reported basis. Includes assets sold, closed or placed on care and maintenance. 2. 2012-2018 estimate. Includes benefits of portfolio

Slide 23: Appendix: Products That Improve People's Lives
APPENDIX Copper: decarbonisation through electrification PGMs: air quality & lower emissions Diamonds: aspiration & growing prosperity Quality bulks: modern infrastructure development PRODUCTS THAT IMPROVE PEOPLE’S LIVES 23 23

Slide 24: 2018 Results
2018 RESULTS Additional material

Slide 25: 2018 – Continued Delivery
2018 – CONTINUED DELIVERY Production volumes1 EBITDA2 Mining margin3 6% $9.2bn 42% Dividend Free cash flow4 ROCE5 $1.3bn $3.2bn 19% 25 25

Slide 26: Safety, Health & Environment
SAFETY, HEALTH & ENVIRONMENT Safety Health Environment Group TRCFR6,7 Fatalities Occupational health – new cases6,8 Major incidents6,9 15 209 30 11 175 4.66 159 4.02 9 111 15 96 101 5.42 5 6 6 3.55 3.17 6 6 2.66 4 2 2013 2014 2015 2016 2017 2018 2013 2014 2015 2016 2017 2018 2013 2014 2015 2016 2017

Slide 27: Leading Margin Curve Improvement
LEADING MARGIN CURVE IMPROVEMENT Average margin adjusted cost curve position10 (%) 49% 12 p.p. 45% 45% 43% 39% 38% 37% 36% 36% 27% Peer 1 Peer 2 Peer 3 Peer 4 Anglo 2013 2018 27 27

Slide 28: Step-Change Beyond Operating Model
STEP-CHANGE BEYOND OPERATING MODEL Copper processing PGM shovels and productivity P101 Exceeding industry best-in- class process & equipment performance Venetia acceleration Longwall performance Bulk Sorting Water & energy savings FutureSmart MiningTM Game-changing technology; Data analytics Coarse

Slide 29: Financials
FINANCIALS Forevermark diamonds

Slide 30: 2018 – Continued Delivery
2018 – CONTINUED DELIVERY EBITDA2 Underlying EPS11 Free cash flow4 $9.2bn $2.55/sh $3.2bn Capital expenditure12 Net debt13 Dividend $2.8bn $2.8bn 100c/sh $2.5bn sustaining, $0.3bn growth down $1.7bn vs FY 2017 40% of underlying earnings 30 30

Slide 31: Continued Delivery of Improvements
CONTINUED DELIVERY OF IMPROVEMENTS EBITDA2 variance: 2018 vs 2017 ($bn) $0.8bn initiatives delivered 0.9 0.2 offset by: (0.4) $(0.2)bn oil price & above CPI cost inflation $(0.2)bn working capital build PGMs (0.6) (0.2) 0.4 Other 108 9.5 8.8 9.2 2017 Price14 Currency CPI Minas-Rio Cost & Other 2018

Slide 32: A Resilient Balance Sheet
A RESILIENT BALANCE SHEET Net debt13 ($bn) Net debt:EBITDA2 Gearing ratio17 37% y-o-y 40% y-o-y 31% y-o-y 4.5 0.5x 13% 9% 2.8 0.3x 2017 2018 2017 2018 2017 2018 ~$0.5bn net debt increase in 2019 from IFRS 16 Leases 32 32

Slide 33: Delivering Returns to Shareholders
DELIVERING RETURNS TO SHAREHOLDERS 2018 dividend Payout per share Payout policy $1.3bn 100c 40% $2.6bn returned since H1: 49c, H2: 51c of underlying earnings H1 2017 33 33

Slide 34: Balanced Capital Allocation
BALANCED CAPITAL ALLOCATION Capital allocation framework18 2018 ($bn) Attributable free cash flow4 of $3.2bn 3.8 Add back discretionary spend Reduced net debt13 by $1.7bn Paid dividends of $1.3bn (3.3) Other adjustments (H2 2018 dividend declared: $0.7bn) Discretionary capital options $0.6bn discret

Slide 35: Life Extensions Will Deliver Value; Higher Near-Term Sustaining Capex
LIFE EXTENSIONS WILL DELIVER VALUE; HIGHER NEAR-TERM SUSTAINING CAPEX Sustaining capex12 ($bn) expanded portfolio e.g. Quellaveco ~3.2 ~3.2 2.8-3.1 2.5 0.5 0.5 0.2 2.7 2.7 2.3 2018 2019 2020-21 Long-term Lifex SIB & Stripping19 Disciplined capital allocation framework drives project selection Veneti

Slide 36: Improved Capital Efficiency
IMPROVED CAPITAL EFFICIENCY 30% ~20-25% SIB & stripping capex/Cu Eq tonne Disciplined production growth 2012-2018 2018-202323 ~135 110 100 30% 2012 2018 2023 Capital efficiency (SIB & stripping/Cu Eq tonne) Production (Cu Eq)23 36 36

Slide 37: High Margin, High Return, Fast Payback Options
HIGH MARGIN, HIGH RETURN, FAST PAYBACK OPTIONS 2019 growth capex12 2020-21 growth capex12 $0.6bn to $0.9bn ~$1.5bn to $2bn pa driven by Quellaveco and technology projects subject to board approvals Disciplined capital allocation framework drives project selection24 Our share: Quellaveco (Copper) $2.

Slide 38: $3-4bn Cost & Volume Improvement
$3-4BN COST & VOLUME IMPROVEMENT Delivered 2013-201716: $2-3bn $3-4bn $4.2bn ✓ Operating Model & P101 Technology & Innovation Projects $0.5bn Met Coal P101 $0.4bn Other cost & volume 201816 201916 2020-2216 38 38

Slide 39: A Balanced and Disciplined Approach
A BALANCED AND DISCIPLINED APPROACH Attractive growth23 Strong margin3 Resilient balance sheet ~20-25% ~45-50% <1.5x Cu Eq production – by 2023 Mining margin (LT consensus prices) bottom of the cycle net debt:EBITDA 39 39

Slide 40: Project Update
PROJECT UPDATE Modern infrastructure

Slide 41: Minas-Rio Restarted on Schedule
MINAS-RIO RESTARTED ON SCHEDULE ✓ • Pipeline scan complete and independently verified ✓ • 4km of pipeline replaced as a precaution; additional monitoring equipment installed ✓ • PIG inspection frequency increased to 2 years, from 5 Magnetic PIG ✓ • Re-started in December 2018; FY EBITDA negative $31

Slide 42: Quellaveco On-Track
QUELLAVECO ON-TRACK 2018 achievements 2019 priorities • Asana and Vizcachas river diversions complete • Earthworks & concrete placement for plant • Main access road complete • 4,000-bed camp • Contracts and procurement significantly progressed • Tunnel excavations for overland conveyor • Earthwork c

Slide 43: Prospective Districts in Diversified Geographies
PROSPECTIVE DISTRICTS IN DIVERSIFIED GEOGRAPHIES Brazil Cu-Au Sakatti Uniao, >37,000km2 granted & under application Chidliak Arizona Zambia Cu-Co Zambezi W, >10,000km2 secured Ecuador Brazil Zambezi West Quellaveco Angola Mt Isa South Los Bronces Mogalakwena Australia Cu Mt Isa South, >10,000km2 gra

Slide 44: Investment Proposition
INVESTMENT PROPOSITION “Leading capabilities actively improving a world-class asset base to drive sustainable, competitive returns” Assets Capabilities Returns Focus on quality Operating Model Capital discipline Long life FutureSmart MiningTM Dividend payout ratio Technology & Sustainability Low-cos

Slide 45: Results Additional Material - Footnotes
RESULTS ADDITIONAL MATERIAL - FOOTNOTES 1. Copper equivalent is calculated using long-term consensus parameters. Excludes 14. Price variance calculated as increase/(decrease) in price multiplied by current domestic / cost-plus production and impact of Minas-Rio suspension. Normalised period sales vo

Slide 46: Guidance and Other Material
Real Mining. Real People. Real Difference. ures Jinn neeennenennns, a ol 7 =. aa

Slide 47: Production Outlook
PRODUCTION OUTLOOK Units 2017 2018 2019F 2020F 2021F (new guidance) Diamonds1 Mct 33.5 35 31-33 33-35 35-37 Copper2 kt 579 668 ~630-660 ~620-680 ~590-650 Platinum3 Moz 2.4 2.5 ~2.0-2.14 ~2.0-2.24 ~2.0-2.24 (previously ~2.0 – 2.2) Palladium3 Moz 1.6 1.6 1.3-1.44 1.3-1.44 1.3-1.44 Iron ore (Kumba)5 Mt

Slide 48: 2018 Unit Costs Guidance Beat; Improvement Offsets Inflation in 2019
2018 UNIT COSTS GUIDANCE BEAT; IMPROVEMENT OFFSETS INFLATION IN 2019 De Beers (US$/ct)1 Copper (C1 USc/lb) PGMs (US$/Pt oz)2 Kumba (FOB US$/t) 63 60 ~65 147 134 135-140 1,443 1,561 <1,600 31 32 ~35 2017 2018 2019F 2017 2018 2019F 2017 2018 2019F 2017 2018 2019F Minas-Rio (FOB US$/t)3 Met Coal (US$/t

Slide 49: 2018 Simplified Earnings by BU
2018 SIMPLIFIED EARNINGS BY BU Kumba Iron Metallurgical Thermal $m (unless stated) De Beers Copper PGMs Nickel Other1 Total Ore Coal Coal a 2,834koz3 PGMs 43.3Mt 22.0Mt4 28.4Mt5 43.1kt Sales volume (mined) 31.7Mct2 672kt 1,305koz3 Pt Benchmark price n/a $6,526/t6 n/a $69/t7 $198/t8 $93/t9 $13,117/t6

Slide 50: 2018 Simplified Earnings by BU - Notes
2018 SIMPLIFIED EARNINGS BY BU - NOTES PGMs basket price Coal blended price Own mined volumes Coal weighted average market Price Volume Revenue Price Volume PGMs basket prices Platinum $875/oz 1,305koz $1,142m HCC $207/t 19.2Mt Palladium $1,043/oz 960koz $1,001m PCI $136/t 2.8Mt Rhodium $2,228/oz 16

Slide 51: Earnings Sensitivities
EARNINGS SENSITIVITIES Impact of 10% change Sensitivity Analysis – 20181 in price / FX Commodity / Currency 31 December spot Average realised EBITDA ($m) Copper (c/lb) 270 283 4302 Platinum ($/oz) 794 871 128 Palladium ($/oz) 1,263 1,029 102 Rhodium ($/oz) 2,445 2,204 35 Iron Ore ($/t) 73 72 301 Har

Slide 52: Quellaveco – A World Class Copper Project
QUELLAVECO – A WORLD CLASS COPPER PROJECT Attractive returns Focus on execution Successfully syndicated Low cost with significant All key permits in place, further potential execution benefitting from early works IRR Payback Mitsubishi subscription > 15% 4 years $851m Real, post-tax From first produ

Slide 53: Quellaveco – Financial Modelling
QUELLAVECO – FINANCIAL MODELLING Ownership Anglo American 60%, Mitsubishi 40% Accounting treatment Fully consolidated with a 40% minority interest Shareholder loans from minority shareholder to be consolidated in Anglo American Group net debt Project capex (nominal) $5.0-5.3 billion (100% basis - An

Slide 54: Quellaveco – Accounting
QUELLAVECO – ACCOUNTING Anglo American consolidates 100% of Quellaveco’s P&L and Balance Sheet. Mitsubishi’s 40% share is shown as a non-controlling interest. After the initial $0.8bn equity injection by Mitsubishi, the project will be funded 60:40 through shareholder debt. Group net debt by the end

Slide 55: PGMs
PGMS Own mined production split by volume Platinum demand1 - European diesel only ~20% European light duty Platinum 2% autocatalysts Other autocatalysts 6% ~20% ~22% Palladium 8% 3% Other Rhodium 46% Gold Ruthenium 35% Industrial & other Jewellery Iridium ~35% ~23% Own mined production split by reve

Slide 56: Portfolio Overview – Simplified
PORTFOLIO OVERVIEW – SIMPLIFIED De Beers Copper PGMs Botswana Debswana Mogalakwena Los Bronces South Africa DBCM Chile Collahuasi Amandelbult South Namibia Namdeb Other operations Africa Processing Canada Canada Peru Quellaveco Other operations Trading GSS Iron ore Coal Nickel & Manganese Australia

Slide 57: Asset Quality: Differentiated Portfolio
ASSET QUALITY: DIFFERENTIATED PORTFOLIO Revenue by product1 Capital employed by geography1 Nickel and Manganese Other 6% 5% PGMs Australia Thermal coal 19% 10% 12% Brazil 24% Diamonds Met coal (De Beers) 14% 20% Chile, Peru & Colombia Iron ore 19% South Africa 12% Copper 26% Namibia & 17% Botswana 1

Slide 58: Our Asset Improvement Journey
OUR ASSET IMPROVEMENT JOURNEY Group 2018 2013 Group 37th percentile 49th percentile Diamonds (De Beers) Copper PGMs Iron Ore Met Coal Thermal Coal Manganese Nickel Nickel & Manganese Margin adjusted cost Q1 Q2 Q3 Q4 curve position 58 58 Source: Wood Mackenzie, CRU, De Beers internal analysis, Anglo

Slide 59: High Quality Diversified Portfolio
HIGH QUALITY DIVERSIFIED PORTFOLIO ~1Mt copper #8 producer currently, #5 post Quellaveco ~37Mct diamonds (De Beers) #1 producer by value, #2 by volume ~5Moz PGMs #1 producer ~75Mt high grade iron ore #5 export producer (post Minas-Rio ramp up) ~30Mt premium coking coal #3 export producer ~30Mt expor

Slide 60: Commodity Outlook
COMMODITY OUTLOOK Medium-to-long term commodity outlook • Demand to remain robust in medium to long term. China remains main driver for demand. Green economy Copper presents upside. • Supply expected to tighten from 2020s. • Growing disposable income drives demand. Long term, demand broadly correlat

Slide 61: IFRS 16: New Accounting Standard for Leases
IFRS 16: NEW ACCOUNTING STANDARD FOR LEASES • Leases mainly corporate offices and jewellery stores; also freight and some mining equipment • Previously accounted for ‘off-balance sheet’ with lease costs taken to P&L New accounting from 2019 • Lease commitments brought onto the balance sheet, increas

Slide 62: Debt Maturity Profile
DEBT MATURITY PROFILE Debt repayments ($bn) 1.9 1.4 1.4 1.1 1.1 0.7 0.7 0.5 0.6 0.5 0.4 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029+ Euro Bonds US$ Bonds GBP bond Other Bonds Subsidiary Financing % of portfolio 46% 47% 4% 1% 2% Capital markets 98% Bank 2% US bonds Euro bonds GBP bond Othe

Slide 63: Operating Model, Technology and Innovation
OPERATING MODEL, TECHNOLOGY AND INNOVATION

Slide 64: Anglo American Operating Model: A Differentiated Approach
ANGLO AMERICAN OPERATING MODEL: A DIFFERENTIATED APPROACH Apply a manufacturing approach to Work that is planned, scheduled and mining, through organised and efficient properly resourced is safer and delivers planning and execution of work consistently and at a lower cost Further improvements implem

Slide 65: P101: Focused on the Key Value Drivers
P101: FOCUSED ON THE KEY VALUE DRIVERS Mine Plant Drill Blast Load & haul Crush Mill Float & filter Percentage of 2018F direct cost base, Los Bronces = c.5% cost base >45Mtpa +10% >94% >89% Shovel Throughput Operating time Recoveries performance increase 65 65

Slide 66: A Number of Game Changing Technologies
A NUMBER OF GAME CHANGING TECHNOLOGIES >50% Reduction in water intensity Coarse Particle Recovery Dry Disposal >50% Reduction in energy intensity Advanced Shock-break Precision Classify Fragmentation 66 66

Slide 67: Coarse Particle Recovery: Improved Recoveries
COARSE PARTICLE RECOVERY: IMPROVED RECOVERIES Drill Blast Load & haul Crush Mill Float & filter • Flotation process changed to allow for larger diameter material Technology • Ore is liberated and recovered with lower waste volumes • Significant increase in throughput Benefits • Solidified disposal m

Slide 68: Coarse Particle Recovery: In Copper
COARSE PARTICLE RECOVERY: IN COPPER Drill Blast Load & haul Crush Mill Float & filter >10% >20% Increase in Operating Decrease in water and Free Cash Flow energy intensity 68 68

Slide 69: Bulk Sorting: Less Waste to Concentrator
BULK SORTING: LESS WASTE TO CONCENTRATOR Drill Blast Load & haul Crush Mill Float & filter • Uses sensors to determine ore content prior to processing Technology • Gangue is removed using natural heterogeneity of ore bodies • Provides immediate grade assays • Unlocks production capacity by rejecting

Slide 70: Bulk Sorting: In Copper
BULK SORTING: IN COPPER Drill Blast Load & haul Crush Mill Float & filter >10% Decrease in water and energy intensity 70 70

Slide 71: FutureSmart Mining: Sustainability
FUTURESMART MININGTM: SUSTAINABILITY Environment, Social and Governance

Slide 72: Innovation with Purpose: Key Messages
INNOVATION WITH PURPOSE: KEY MESSAGES Mining is getting harder: Grades declining; societal expectations increasing Context Increasing scale is not a sustainable solution A focus on greater precision and efficiency is needed Improved the business since 2012, through the operating model: 50% fewer Ope

Slide 73: Our FutureSmart Mining Programme: Step-Change Innovation
OUR FUTURESMART MININGTM PROGRAMME: STEP-CHANGE INNOVATION IN TECHNOLOGY AND SUSTAINABILITY Our Sustainability approach is integral to FutureSmart Mining™: to innovate and deliver step change results across the entire mining value chain. It is centred around three Global Sustainability Pillars and n

Slide 74: Our 2018 Sustainability Performance
OUR 2018 SUSTAINABILITY PERFORMANCE 2013 2014 2015 2016 2017 2018 Target Work-related 15 Zero harm fatal injuries1 11 9 6 6 5 15% year-on- TRCFR1 5.49 4.66 4.02 3.55 3.17 year reduction 2.66 New cases of Year-on-year occupational 209 175 159 111 101 reduction disease1 96 Energy 8% saving by consumpt

Slide 75: Our 2018 Sustainability Performance
OUR 2018 SUSTAINABILITY PERFORMANCE 2013 2014 2015 2016 2017 2018 Target 14% saving by Total water 276 276 339 296 306 2020 and 50% withdrawals1 227 by 2030 Environmental Year-on-year 30 incidents1 15 reduction 6 4 2 6 Jobs sustained 111 116 121 125 (‘000) 77 97 % of localised procurement 23 23 21 1

Slide 76: Coal
COAL Coal demand Our Production & Capex Profile Thermal coal makes up ~37% of the global electricity mix We have reduced our thermal coal production by 50% since 2012: IEA and other forecasts see a significant role for thermal coal in Production (Mt) Thermal Coal – South Africa capex ($m) the global

Slide 77: Tailings Dams Summary
TAILINGS DAMS SUMMARY Upstream design Downstream design Built progressively ‘upstream’ of the starter dam by Raised progressively with the crest of the dam moving incorporating tailings materials into the outer dam wall ‘downstream’ of the starter dam, with an internal drain or filter. construction,

Slide 78: Tailings Dams in Our Portfolio
TAILINGS DAMS IN OUR PORTFOLIO Southern Africa Minas-Rio Our dams in southern Africa are well suited due to low rates of The Minas-Rio dam is designed to retain water, one of the most rise, sunny and dry environment, with high evaporation rates, robust designs for tailings storage. It is built with

Slide 79: Tailings Dams Management Process
TAILINGS DAMS MANAGEMENT PROCESS Our Group Technical Standard exceeds regulatory requirements • All our tailings dams are built following established design criteria to ensure structural integrity. Design • We adhere to the highest standards of change management to ensure structural integrity is pre