Jadestone Energy Plc · LSE:JSE

Jadestone Energy — Q2 2019 Earnings Presentation

31 slides from Jadestone Energy's earnings presentation, Aug 27, 2019

  1. Slide 1: Q2 2019 Quarterly Results Review

    Click to add Slide Title Click to add sub head • Edit Master text styles • Second level • Third level • Fourth level Q2 2019 Quarterly • Fifth level Results Review August 27, 2019 www.jadestone-energy.com 1

  2. Slide 2: Disclaimer & Advisories

    Disclaimer & Advisories Disclaimer You must read the following before continuing. The following applies to this document, the presentation of the information in this document and any question‐and‐answer session that may follow (collectively, the "Presentation"). In viewing the Presentation, you agre

  3. Slide 3: Advisories

    Advisories In addition, statements relating to “reserves” and “resources” are deemed to be forward looking statements as they involve the implied assessment based on certain estimates and assumptions that the reserves or resources described can be profitable produced in the future. There are numerou

  4. Slide 4: Agenda

    Agenda Webcast presentation, quarter ended June 30, 2019 1 Paul Blakeley ⚫ Quarter highlights, operational update, asset performance 2 Dan Young ⚫ Financial review 3 Paul Blakeley ⚫ Outlook, conclusions 4 Team ⚫ Q&A Session 4

  5. Slide 5: Jadestone Energy, corporate overview

    Jadestone Energy, corporate overview Overview Q2 2019 highlights Financial Statement extract ⚫ Three oil liftings, record revenue, cash flow and profits As at, US$mm Jun-19 Mar-19 ⚫ Stag production increases, efficiency improvements Cash1 76.4 84.8 — 49H infill well came on stream at 1,400 bbls/d, T

  6. Slide 6: Environmental, social, and governance priorities

    Environmental, social, and governance priorities Our framework for sustainability Reporting Managing Jadestone will publish its first ever Our ESG-specific KPIs will be set, sustainability report along with its measured, and managed in exactly the financial and operating results for the same way as

  7. Slide 7: Stag achievements and outlook

    Stag achievements and outlook Optimising operations to grow reserves, reduce costs and add value Overview Operating cost reductions1, US$/bbl ⚫ Production—averaged 2,615 bbls/d in Prior operator Jadestone operator Q2 2019, impacted by delayed workovers due to 49H drilling — 37H and 44H pump change-o

  8. Slide 8: Montara riserless light well intervention

    Montara riserless light well intervention A highly efficient intervention campaign Illustration Advantages  Faster set up time on location  Short travel time between wells  No riser run to surface  Deployment of heavy items off well centre  Most cost effective setup for electric-line 2 4 71 Gas

  9. Slide 9: Montara select opex reduction initiatives

    Montara select opex reduction initiatives Approximate annual net savings, US$mm $5.0 Campaign maintenance $5.1 100% $2.3 Perth office support Head office costs costs 100% ~$25mm 100% Total opex $9.0 savings $1.5 Shared Stag/ Organisation right Montara inspection sizing1 resource3 90% $2.0 50% New su

  10. Slide 10: The Montara value opportunity

    The Montara value opportunity On track to deliver significant additional value Levers to unlock value (US$mm) Attractive acquisition cost Strong acquisition metrics: <$7 per bbl 2P reserves / <$19,000 per flowing bbl 2P reserve adds Gas lift installation and optimisation. New umbilical Uptime improv

  11. Slide 11: Nam Du/U Minh

    Nam Du/U Minh Continued progress on development Select define phase/pre-sanction workstreams Nam Du/U Minh in 2019 ⚫ WHP specialty engineering—completed ✓ ⚫ Modest spending in 2019: Engineering ⚫ Facilities & pipeline FEED—completed ✓ Total = ~US$11mm ⚫ Well concept finalisation & engineering—comple

  12. Slide 12: Financial review—key headlines

    Financial review—key headlines Operational delivery strengthens the balance sheet and generates significant cash Overview Average production and hydrocarbon prices ⚫ Another record quarter Q2 2019 Q1 2019 H1 2019 — Record net revenue of US$115.3mm — Record profit after tax of US$22.6mm ⚫ Montara pro

  13. Slide 13: Financial results—quarterly cash bridge

    Financial results—quarterly cash bridge Montara demonstrating strong positive cash generation US$mm Cash balance 150 Qtly ordinary cashflow Qtly non-recurring cashflow 51 21 20 100 9 4 1 12 3 85 14 15 3 76 50 Stag: cashflow impacted by 49H infill capex, but rapid payback Montara: significant positiv

  14. Slide 14: Financial results—Q2 2019 EBITDAX

    Financial results—Q2 2019 EBITDAX Q2 adjusted EBITDAX reconciliation 3 months ended June 30, 2019 Add back depletion, Add back/(less) depreciation, 3 months ended US$’000s Reported non-recurring exploration Adjusted June 30, 2018 Revenue 115,341 (1,376) - 113,965 17,496 Production cost (39,337) 6,94

  15. Slide 15: Montara capped swap summary

    Montara capped swap summary Overview Capped swap summary Vol, bbls Dated Brent US$/bbl ⚫ Swaps cover 600,000 90 approximately 50% of planned 2PD production to Sep 30, 2020 500,000 ⚫ Average swap prices — US$71.72/bbl for 2019 — US$68.45/bbl for Q1- 400,000 75 Q3 2020 ⚫ Upside participation secured o

  16. Slide 16: 2019 guidance

    2019 guidance Production, major spend, and opex Full year average production, boe/d Full year major spend1, US$mm Full year base opex2, US$/boe Not before 2020 40 20 H1 2020 Stag infill & other Montara umbilical 0 Montara LWI Montara seismic Montara Stag Jadestone Montara Stag Ogan Komering Montara

  17. Slide 17: Jadestone portfolio work programme

    Jadestone portfolio work programme Fully funded programme of material near-term catalysts 2019 2020+ Asset Country Activity Q1 Q2 Q3 Q4 Implement Jadestone operating Montara philosophy Operations Montara Montara production optimisation Transfer of operatorship Montara to Jadestone Stag Infill drilli

  18. Slide 18: Compelling investment opportunity

    Compelling investment opportunity Jadestone currently trades at a deep discount to core NAV Total tangible asset value, US$mm Total tangible asset value, GBP/share US$mm Stag 2P Montara 2P £ /share Stag 2P Montara 2P 2C resource 1 Management estimates 2 2C resource 1 Management estimates 2 1,250 2.0

  19. Slide 19: Jadestone Energy investment highlights

    Jadestone Energy investment highlights A strategy that works, a high value portfolio, and a plan for value accretive growth ⚫ Proven in-region management team with a track record of value creation and shareholder return generation Proven regional management ⚫ End-to-end capabilities through the upst

  20. Slide 20: Appendix

    Click to add Slide Title Click to add sub head • Edit Master text styles • Second level • Third level • Fourth level Appendix • Fifth level www.jadestone-energy.com 20

  21. Slide 21: Asia Pacific region

    Asia Pacific region Maturing hydrocarbon region with significant running room; ideal for Jadestone Asia Pacific reserve breakdown Development type Company Maturity 3% 4% 8% 13% 20% 12% 15% 35% 26% 53% 42% 69% Onshore Shallow water Majors & large IOCs NOCs Late life Mature Deepwater Ultra-deepwater I

  22. Slide 22: Vietnam domestic gas prices

    Vietnam domestic gas prices Established market prices of $7—$9/mmbtu Well-head gas pricing in Vietnam, $/mmbtu US$/mmbtu 10—12 12 9—10.5 10 ~9 7—8 8 6 3—4 4 2 0 Legacy Recently New gas HSFO LNG GSAs executed under HOA GSAs Select comments ⚫ Recent established domestic wellhead gas price range of $7—

  23. Slide 23: Jadestone Energy

    Jadestone Energy Right team, right place, right time ⚫ Primarily the ex-Talisman Asia Pacific team led by Paul Blakeley ⚫ Delivered 11% CAGR production growth over 10 years in Asia Pacific creating US$6bn NAV business, with deep knowledge of key hydrocarbon basins Deep experience ⚫ Differentiated ap

  24. Slide 24: Jadestone Energy—updated portfolio overview

    Jadestone Energy—updated portfolio overview Building a balanced, low risk, full cycle portfolio Portfolio development Key assets location ⚫ 13,500—14,500 bbls/d production guidance for 2019 Gulf of Thailand ⚫ Material reserve and resource base ⚫ Fully-funded near-term value catalysts 51 SC56 — Infil

  25. Slide 25: 2P reserves and 2C resources

    2018 year end update on 2P/2C reserves/resources 43 mm bbls 2P reserves, 9 year reserve life Select comments 2P reserves1 and 2C resources2 net to Jadestone, mmboe mmbbls ⚫ Montara’s 2P reserves are unchanged from acquisition, 50 100% oil 2P Reserves1, Dec. 2018 save for 2018 production 40 6 43 — To

  26. Slide 26: 2019/2020 Australian tax outlook

    2019/2020 Australian tax outlook Key highlights Australian corporate tax overview Australian petroleum resource rent tax (“PRRT”) overview ⚫ Corporate tax rate of 30% of ⚫ Tax at 40% of “PRRT profits”, based on a Jul to Jun tax year, paid quarterly in arrears taxable profits, on a calendar — Based o

  27. Slide 27: Swallow-1 additional perforations

    Swallow-1 additional perforations Accessing more reservoir Overview ⚫ Swallow-1 drilled as part of the original Montara development ⚫ Jadestone identified potential to access three additional zones New and comingle perforations production ⚫ Perforated using latest technology three-and-a- half inch g

  28. Slide 28: Jadestone's Southwest Vietnam gas assets

    Jadestone’s Southwest Vietnam gas assets Developing a significant gas resource into the energy-short domestic market Overview Map of blocks 46/07 and 51 including evacuation route Jadestone W.I. 100%1 Operator Jadestone 496.8 bcf 93.8 2C resources2 mmboe 11 mmbbl Overview ⚫ Significant shallow water

  29. Slide 29: Nam Du/U Minh phased development concept

    Nam Du/U Minh phased development concept Overview of field development plan Description of overall development concept ⚫ 2 minimum facilities, not-normally attended wellhead platforms ⚫ 2 gas production wells per wellhead platform, drilled by jack-up drilling rig ⚫ Central processing facility— lease

  30. Slide 30: Nam Du and U Minh development concept

    Nam Du and U Minh development concept Commercialised via the existing route utilised by Talisman’s PM3 field Project development outline Illustration of Nam Du / U Minh development concept ⚫ Minimal facilities, not-normally attended wellhead platforms, one at each field, tied back to a leased FPSO a

  31. Slide 31: Nam Du/U Minh development schedule

    Nam Du/U Minh development schedule Roadmap to first gas Key milestones Vietnam PSC milestone Project delivery phase Reserve Outline development Field development assessment plan (ODP) plan (FDP) report (RAR) Project execution Concept selection phase Project define phase phase Q1 2016 Q4 2016 Q4 2017

Jadestone Energy — Q2 2019 Earnings Presentation on 6ix