Sunda Energy PLC · LSE:SNDA

Sunda Energy — Timor-Leste Online Conference 2020

18 slides from Sunda Energy's conference presentation, Jul 9, 2020

  1. Slide 1: Chuditch Discovery and SundaGas' Plans

    Chuditch Discovery and SundaGas’ Plans Colin Murray, VP Technical Timor-Leste Online Conference www.sundagas.com 9 July 2020

  2. Slide 2: TL-SO-19-16 PSC: Background and Overview

    TL-SO-19-16 PSC: Background and Overview ▪ SundaGas is a Singapore-based E&P company with interests and experience across SE Asia ▪ Investigating Timor-Leste opportunities over a long period and first applied for PSC in 2016 ▪ TL-SO-19-16 PSC signed on 8 November 2019 and is the first new PSC offsho

  3. Slide 3: Timor Sea Bathymetry, Oil and Gas Fields

    Timor Sea Bathymetry, Oil and Gas Fields Sunrise-Troubadour Kelp Deep-1 Discovery Undeveloped Undeveloped Evans Shoal Undeveloped Laminaria-Corallina Field Kitan Field Production suspended Decommissioned Chuditch-1 Discovery Heron-2 Discovery Undeveloped Buffalo Field Undeveloped Decommissioned Blac

  4. Slide 4: Structural Elements and Stratigraphy

    Structural Elements and Stratigraphy Seal Base Darwin Source and Seal Top Plover Reservoir and Source From Cadman & Temple (2004) 4

  5. Slide 5: Semi Regional Structure Map on Darwin Horizon (TWT)

    Semi Regional Structure Map on Darwin Horizon (TWT) 5

  6. Slide 6: Chuditch – Malita Graben Regional Composite Seismic Tie

    Chuditch – Malita Graben Regional Composite Seismic Tie NW Sikatan-1 Chuditch-1 Malita Graben SE Pleistocene UC Oliver Hibernia Johnson Wangarlu Top Plover Upper Jurassic source rocks in expanded section Middle Jurassic reservoirs and gas- prone source rocks 6

  7. Slide 7: Chuditch Ideally Located for Significant Gas Charge

    Chuditch Ideally Located for Significant Gas Charge Modelled migration pathways illustrate likely Chuditch charge from adjacent Malita Graben and spill towards Sunrise-Troubadour Notes ▪ 2D mapping extrapolated beyond mapped limits ▪ Simple depth conversion used time/depth relationship from sea leve

  8. Slide 8: The Chuditch-1 Discovery

    The Chuditch-1 Discovery ▪ Chuditch-1 drilled by Shell in 1998 ➢ 65m water depth, TD 3035m, well drilled in only 13 days ➢ >25m gas encountered, considerably below mapped crest of structure ➢ Good quality Jurassic Plover Formation reservoirs encountered ➢ Best case discovered resource of ~700 Bcf ➢

  9. Slide 9: Seabed features seen on Darwin TWT structure

    Seabed features seen on Darwin TWT structure Seabed channel falsely appears on map – uncertainty in geometry Seabed and extent of structure channel shoal / hill Reefs Reefs Structural high coincident with seabed shoal Seabed Bathymetry Map Darwin TWT Map 9

  10. Slide 10: Seismic Illustration of Chuditch (Dip and Strike Lines)

    Seismic Illustration of Chuditch (Dip and Strike Lines) Chuditch SE Chuditch NE NW SW Seabed channel obscures seismic signal Hibernia Top Cretaceous Distortion of the image around the fault(s) Darwin Plover Reservoir Interval Top Triassic 10

  11. Slide 11: Seismic Illustration of Chuditch West

    Seismic Illustration of Chuditch West NW Chuditch West SE Seabed high and shallowly buried reefs reflected in deeper Hibernia structure coincident with Chuditch West Top Cretaceous Low relief closure at Chuditch West Darwin Plover Reservoir Interval Top Triassic Top Permian 11

  12. Slide 12: Geological Reason for Seabed Anomalies

    Geological Reason for Seabed Anomalies Chuditch Area ▪ During the last ice age, around 18,000 years ago, sea levels were up to 120m lower than today ▪ The Bonaparte Shelf was a land area with a large brackish lake occupying the central Bonaparte Depression. 18,000 Years BP 16,000 Years BP ▪ The Chud

  13. Slide 13: Why do PSDM Depth Reprocessing? Chuditch Uncertainties from Seismic Imaging

    Why do PSDM Depth Reprocessing? Chuditch Uncertainties from Seismic Imaging N Chuditch-1 S Seabed channel obscures seismic signal Chuditch-1 As a long narrow field set up by a key fault, Distortion of seismic image mapping is subject to key uncertainties around fault(s) produces around structural sh

  14. Slide 14: Why do PSDM Depth Reprocessing? Vietnam Case Study

    Why do PSDM Depth Reprocessing? Vietnam Case Study Pre-PSDM Data Final PSDM Data Very poor definition of fault Excellent definition of fault and sequences close to fault and sequences close to fault 14

  15. Slide 15: SundaGas Go Forward Plan

    SundaGas Go Forward Plan PSC Commitment Work Programme ▪ Work programme designed to extract most value from existing seismic, to ensure successful early appraisal and step-out drilling ▪ Likely to drill several wells back-to-back in first drilling campaign 15

  16. Slide 16: Timor Sea Gas Infrastructure and Commercial Context

    Timor Sea Gas Infrastructure and Commercial Context ▪ Bayu Undan (BU) supplies gas to Darwin LNG, critical infrastructure for Timor-Leste ▪ TIMOR GAP acquired 56% of Sunrise and plans to develop Tasi Mane LNG ▪ Santos acquired BU and Barossa from ConocoPhillips and reportedly plans to extend BU fiel

  17. Slide 17: Our Business Partners in Timor-Leste

    Our Business Partners in Timor-Leste Advogados e Consultores Konnekto 17

  18. Slide 18: TL-SO-19-16 PSC: Summary

    TL-SO-19-16 PSC: Summary ▪ SundaGas sees exciting potential in the Chuditch gas discovery and its adjacent exploration features ▪ Initial works are planned to address key technical issue of subsurface imaging ▪ Drilling scheduled for 2022, subject to successful completion of 3D seismic reprocessing,

Sunda Energy — Timor-Leste Online Conference 2020 on 6ix