Pacific Drilling S.A.

Pacific Drilling — Corporate Update (July 2015)

16 slides from Pacific Drilling's corporate update, Jul 23, 2015

  1. Slide 1: Pacific Santa Ana Company Update

    PACIFIC SANTA ANA Company Update July 22, 2015 Pacific Drilling

  2. Slide 2: Forward-looking statements

    Certain statements and information contained in this presentation constitute “forward‐looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. Where any forward‐looking statement includes a statement about the assumptions of bases underlying the forward‐looking

  3. Slide 3: Succeeding in a tough market

    Succeeding in a tough market 3 Pacific Drilling distinguished by operational excellence and cost management  Operational excellence more important than ever: expect market to be very tough for at least 18 months – Clients want the rigs that deliver – PACD management focused on minimizing downtime &

  4. Slide 4: Revenue efficiency illustrates high quality client service delivery

    96.9 95.3 91.1 97.1 95.9 98.4 95.2 95.5 50 55 60 65 70 75 80 85 90 95 100 2013 Q3 2013 Q4 2014 Q1 2014 Q2 2014 Q3 2014 Q4 2015 Q1 2015 Q2 Post‐shakedown fleet revenue efficiency(1) (%) Revenue efficiency illustrates high quality client service delivery Clients want rigs that deliver  Already 9 well

  5. Slide 5: Exclusively high-spec floater fleet positioned well for limited market opportunities

    Percent Contracted High‐Spec Floater % Available 100% 87% 100% 88% 64% 71% 65% 69% 51% 75% 83% 69% 100% 55% 46% 41% 44% 40% 29% 54% Ocean Rig Seadrill Atwood Noble Rowan Ensco Transocean Diamond Offshore Vantage Drilling 2015 2016 Pacific Drilling 89% 82% 78% 68% 50% 71% 55% 52% 48% 40% 33% 28% 21%

  6. Slide 6: Solid $1.9 billion contract backlog

    Solid $1.9 billion contract backlog 6 Contract status as of July 21, 2015 Chevron Nigeria, $586k/d 2 year extension Total Nigeria, $499k/d 2 year extension Chevron USGoM, $490k/d 5 year contract CVX Nigeria, $660k/d 2 year contract Chevron USGoM, $558k/d 5 year contract Construction Mobilization Fir

  7. Slide 7: $32m cost savings delivered; $75m total 2015 target

    $32m cost savings delivered; $75m total 2015 target; $100m annual run‐rate target 7 Labor and personnel costs • Travel • Variable compensation elements • Overhead headcount • Benefits • Training Maintenance expenses • Engineering & major projects • Deferral of non‐ critical normal and project mainte

  8. Slide 8: Smart stacking results in idle rig costs of <$40k/day

    Smart stacking results in idle rig costs of <$40k/day without incremental investment 8 Direct rig‐related opex per day ($k) 215 18 103 Personnel Maintenance Operations Miscellaneous 178 75 40 0 20 40 60 80 100 120 140 160 180 Historical operating Conventional stacking savings Historical stacked Pers

  9. Slide 9: Cost saving initiatives driving stronger 2015 guidance

    Cost saving initiatives driving stronger 2015 guidance 9 Revised and expanded full‐year 2015 guidance for certain items Item Old Range New Range Average revenue efficiency 92% ‐ 96% 94% ‐ 96% Contract drilling expenses $500 million ‐ $525 million $425 million ‐ $450 million General & administrative

  10. Slide 10: Industry-leading EBITDA margin with only 5 rigs on contract

    25% 30% 35% 40% 45% 50% 55% 60% 65% 3Q 2013 4Q 2013 1Q 2014 2Q 2014 3Q 2014 4Q 2014 1Q 2015 2Q 2015 10 Continuing to deliver industry‐leading EBITDA margin with only 5 rigs on contract Range of adjusted EBITDA/revenue for offshore drillers(3),(4) PACD Peer Offshore Driller Average NOTES: • Peer Offs

  11. Slide 11: Projected positive EBITDA through 2017 even with no additional contracts

    11 Projected positive EBITDA through 2017 even with no additional contracts FINANCIAL STRENGTH 1086 1090 715 280 335 860 2014 2015 2016 2017 518 494 370 275 115 280 2014 2015 2016 2017 563 596 345 5 220 580 2014 2015 2016 2017 EBITDA ($m) Costs ($m)Revenue ($m) In absence of new contracts, liquidity

  12. Slide 12: Operating cash flow and existing facilities expected to cover 2017 debt maturity

    Operating cash flow and existing facilities expected to cover 2017 debt maturity 12 FINANCIAL STRENGTH NOTES: • Capex as per Investor Toolkit dated Mar. 31, 2015. • Commitments shown as net of gross interest since interest has been deducted when calculating cash flow from operations. • Cash flow fro

  13. Slide 13: Valuation attractive relative to peers before cost saving initiatives

    Valuation attractive relative to peers before benefit of cost saving initiatives 13 FINANCIAL STRENGTH NOTES: • Peer Offshore Driller Average includes ATW, DO, ESV, NE, ORIG, RDC, RIG, and SDRL Thomson Reuters consensus as of July 20, 2015 FY2015 Multiples PACD Peer Average Price/Earnings 4.38 5.42

  14. Slide 14: Ongoing initiatives to further strengthen financial position

    Ongoing initiatives to further strengthen financial position 14 Delay of Pacific Zonda delivery currently under discussion with shipyard Initiated discussions with agent banks for post‐2015 debt covenant revisions Further cost reductions to include: ‐ Rationalization of non‐critical maintenance expe

  15. Slide 15: Investor contact

    Investor contact Pacific Drilling Amy Roddy VP Corporate Services 11700 Katy Freeway Suite 175 Houston, Texas 77079 USA Phone: +1 832‐255‐0502 Email: [email protected] www.pacificdrilling.com 15

  16. Slide 16: Footnotes

    Footnotes 16 1. Revenue efficiency is defined as actual contractual dayrate revenue (excluding mobilization fees, upgrade reimbursements and other revenue sources) divided by the maximum amount of contractual dayrate revenue that could have been earned during a certain period. Post‐shakedown revenue

Pacific Drilling — Corporate Update (July 2015) on 6ix