Pantoro Gold Limited · ASX:PNR

Pantoro Gold — Pantoro — Investor Presentation (February 2017)

24 slides from Pantoro Gold's investor presentation, February 2017

  1. Slide 1: Company Update February 2017

    Click to edit Master title style Company Update February 2017 ASX:PNR

  2. Slide 2: Disclaimer & Competent Person's Statement

    Disclaimer & Competent Click Person’s Statement to edit Master title style General Disclaimer • This presentation has been prepared by Pantoro Limited (“Pantoro” or the “Company”). It should not be considered as an offer or invitation or inducement to subscribe for or the purchase of any securities

  3. Slide 3: Rapidly Growing Gold Production Company

    Rapidly Growing Gold Production Click Company to edit Master title style • Pantoro is a gold production company which owns 100% of the Nicolsons Gold Project in Western Australia. • New producer consistently achieving targets within specified timelines. • Region is exceptionally under-explored. Pant

  4. Slide 4: Corporate Overview of Pantoro

    Corporate ClickOverview of Pantoro to edit Master title style Share Price Capital Structure Share Price (13/1/17) 23 cps Volume Share Price Ordinary Shares 743.5 million 25 40 Listed Options 34 million 35 Employee and unlisted options and Trading Volume (millions) 20 32 million 30 Closing Share Prec

  5. Slide 5: Nicolsons Gold Mine

    Click to edit Master title style Nicolsons Gold Mine 5

  6. Slide 6: Halls Creek Project – 100%

    Halls Creek Project – 100% Click to edit MasterPantoro title style • 100% owner of the Halls Creek Project, which includes the Nicolsons Gold Mine. • December 16 Quarter – 9,599 Oz produced. Record production of 4,627 Oz in month of December with ramp up in plant throughput continuing. AISC A$1179/O

  7. Slide 7: Where we started, and where we are heading

    Where we started, and Click to edit Master title style where we are heading ~50-60kozpa, AISC < $1,000/oz Next Target 80–100kozpa through further expansion 7

  8. Slide 8: High grade and Open in All Directions

    High grade and Open Click in Master to edit All Directions title style Johnston Lode (south) Hall/Anderson Lode (north) 12m @ 13.6g/t (RC) 6m @ 4.3g/t (RC) 0.6m @ 22g/t (diamond) 9m @ 3.3g/t (RC) 2m @ 5.8g/t (RC) 2m @ 6.7g/t (RC) 5m @ 7.4g/t (RC) • Ongoing drilling returning high grades at depth • H

  9. Slide 9: Mineral Resource and Ore Reserve

    Mineral Resource and Ore Reserve Click to edit Master title style Last Upgrade May 2016 • Continued to develop outside of reserve; • >100% resource-reserve conversion ratio to date; • Continuing to locate new gold bearing structures; • Expanded drilling effort both in mine and regionally; • Resource

  10. Slide 10: Development of Southern Lodes will double production sources

    Development of Southern Lodes Click to edit Master title style will double production sources First level development Johnston Lode South Decline Advancing with current resource in Ore Ore Development Development green Ongoing Ongoing • Large developed stocks inventory. • Advancing Mother Lode devel

  11. Slide 11: Typical Level Development – Hall-Anderson-Mother-Darcy Lodes

    Typical Level Development – Hall- Click to edit Master title style Anderson-Mother-Darcy Lodes Anderson Lode Anderson Lode Darcy Lode Darcy Lode Mother Lode • Pre-MiningMother Ore Reserve excluding Lode Johnston, ~500 OVM • Actual Developed Ore, Hall >1,000 OVM Lode • Johnston Lode not yet Hall Lode

  12. Slide 12: Rowdies and Wagtail: A Repeat of Nicolsons?

    Rowdies and Wagtail: Click A Repeat of Nicolsons? to edit Master title style • Only 1.5 km south of Nicolsons • Reserve 96.5kt @ 5.55g/t • Significant additional ore identified in drilling and already being extracted in early stages of mining • Outstanding infill drilling results including*:  13 m

  13. Slide 13: Wagtail pits delivering very high grade zones beyond expectation

    Wagtail pits delivering very high Click to edit Master title style grade zones beyond expectation • Zones of Very high grade ore similar to bonanza zones in Nicolsons being encountered. • Grade control drilling shows high grade continuing at depth in pits • Ore blocks found to be consistent along st

  14. Slide 14: Rowdies and Wagtail long Section

    Rowdies and ClickWagtail long Section to edit Master title style 100 m Depth Limit of Open Pits 200 m • Strong results beneath open pits • Additional diamond drilling in full swing – targeting additional underground development late 2017 14

  15. Slide 15: Wagtail Sections – Looking a lot like Nicolsons!

    Wagtail Sections – Looking Click to edit Master title style a lot like Nicolsons! 15

  16. Slide 16: Increasing Grade and Throughput

    IncreasingClick Grade and to edit Throughput Master title style • Plant is currently operating well, has 140000 achieved and exceeded feasibility expectations 120000 • Expansion well advanced – operated at rate of 185 ktpa in December with 100000 >50% shifts at rate of 200ktpa or better. Annual Prod

  17. Slide 17: Unlocking the Future

    Click to edit Master title style Unlocking the Future 17

  18. Slide 18: High grade and Open in All Directions

    High grade and Open Click in Master to edit All Directions title style Johnston Lode (south) Hall/Anderson Lode (north) 12m @ 13.6g/t (RC) 6m @ 4.3g/t (RC) 0.6m @ 22g/t (diamond) 9m @ 3.3g/t (RC) 2m @ 5.8g/t (RC) 2m @ 6.7g/t (RC) 5m @ 7.4g/t (RC) • Ongoing drilling returning high grades at depth • D

  19. Slide 19: Archer Fault Exploration

    Archer Fault Click to edit Exploration Master title style UNTESTED • Underground Archer Northern Anderson Repeats? development and Fault Lode drilling has defined the Archer Fault • Spatial control on Hall Lode UNTESTED mineralisation Hall Lode Rowdies Pit Repeat? • Strong zone mapped in Wagtail pit

  20. Slide 20: Understanding the Structure

    Understanding the Structure Click to edit Master title style Hall Lode Hall Lode High grade zones east of Forrest Johnston Lode Structure Depth Repeat 19400 19530 North 19500 North North 20

  21. Slide 21: Riedel Shear Zone

    Riedel Click to Shear edit Master titleZone style Archer Fault Mother Anderson Lode Lode Darcy Lode Hall Lode Forrest Structure 21

  22. Slide 22: Paddock Well – The Newest High Grade Discovery

    Paddock Well – The Newest Click to edit Master title style High Grade Discovery • First drilling at depth yields very high grade results including: • 5m @ 6.23 g/t from 55m including 2m @ 12.67g/t from 58m • 1m @ 28.72 g/t from 72.6 m including 0.7m @ 40.5 g/t • 1m @ 7.77 g/t from 70m • Approximatel

  23. Slide 23: Full development pipeline with numerous drill targets being advanced

    Full development pipeline with numerous Click to edit Master title style drill targets being advanced Springvale Fault - 1.5km Outcrop up to 10m Wide, historical high grade surface rock chip samples and drilling with no systematic exploration in last 12 years Archer Fault • Nicolsons North – 12m @ 1

  24. Slide 24: Click to edit Master title style

    Click to edit Master title style

Pantoro — Investor Presentation (February 2017) on 6ix