UNS Energy Corp

UNS Energy — UniSource Energy — AGA Financial Forum 2012

40 slides from UNS Energy's conference presentation, May 7, 2012

  1. Slide 1: AGA Financial Forum May 7-8, 2012

    AGA Financial Forum May 7-8, 2012

  2. Slide 2: Contact Information & Safe Harbor

    Contact Information & Safe Harbor Investor Relations Contact Information Chris Norman, Manager Daniel Mark, Senior Analyst (520) 884.3649 (520) 884.3621 [email protected] [email protected] Investor Information http://ir.uns.com Safe Harbor and Non-GAAP Measures This document contains forward-looking infor

  3. Slide 3: Long-Term Value Proposition

    Long-Term Value Proposition Fully Regulated Utility With Long-Term Growth Drivers Fully Regulated Utility With Long-Term Growth Drivers Fully Regulated Utility With Long-Term Growth Drivers 2

  4. Slide 4: Attractive dividend yield

    Attractive dividend yield Payout target provides flexibility 13 consecutive years of dividend increases 2000 2012 *Yield and payout for regulated utilities from EEI Q4 2011 Financial Update Note: UNS payout ratio based on net income associated with mid-point of 2012 earnings guidance and indicated a

  5. Slide 5: Internal Cash Funds Majority of Capital Investments

    Note: Capital expenditure estimate for 2012 2011 10-K Generating Strong, Stable Cash Flow Internal Cash Funds Majority of Capital Investments 4 *Pro forma for the conversion of $39.3 million of convertible bonds to equity and $0.7 million of convertible bonds redeemed at par.

  6. Slide 6: Investing in Our Utility Businesses

    Note: Capital expenditure estimates for 2012-2016 are from the 2011 Form 10-K. Excludes optional purchase of leased assets in 2015. Investing in Our Utility Businesses Nearly $2 Billion of Utility Investments Through 2015 5

  7. Slide 7: TEP Rate Base Growth of $400 - $500 Million

    Investing in Our Utility Businesses TEP Rate Base Growth of $400 - $500 Million TEP Rate Base Growth Generation and distribution investments from 2007-2011 Environmental upgrades Sundt Unit 4 Renewable energy investments $1.02B 6 $1.4B - $1.5B

  8. Slide 8: Strengthening Our Regulatory Foundation

    Strengthening Our Regulatory Foundation Constructive Outcomes and Progress in Recent Cases 7

  9. Slide 9: Positioning for TEP 2012 Rate Filing

    Positioning for TEP 2012 Rate Filing Building Blocks for 2013 Rate Increase Building Blocks for 2013 Rate Increase Building Blocks for 2013 Rate Increase Notice filed in April 2012 July 2, 2012 anticipated filing date Request that new rates in effect no later than Aug. 1, 2013 Parties to 2008 Settle

  10. Slide 10: TEP 2012 Integrated Resource Plan

    TEP 2012 Integrated Resource Plan Filed in April 2012 Filed in April 2012 Filed in April 2012 9

  11. Slide 11: TEP 2012 Integrated Resource Plan Decision Timeline

    TEP 2012 Integrated Resource Plan Decision Timeline 10

  12. Slide 12: Arizona's Economy In Recovery Phase

    Arizona's Economy In Recovery Phase Long-Term Growth, Diverse Customers and Competitive Retail Rates 11 *Source: University of Arizona Business and Economic Research Center

  13. Slide 13: Financial Update and Outlook

    FINANCIAL UPDATE AND OUTLOOK 12

  14. Slide 14: 2012 Earnings Guidance and Sensitivities

    2012 Earnings Guidance and Sensitivities 13 * Base O&M is a non-GAAP measures. Please refer to the end of this presentation for a reconciliation of non-GAAP measures. Apr. - Dec. 2012 Earnings Sensitivities Pre-Tax (millions) After-Tax (millions) Per Diluted Share 1% Change in Total Retail Sales (ba

  15. Slide 15: 2012-2014 Financial Outlook

    2012- 2014 Financial Outlook Continued O&M cost containment UNS Gas rate order TEP rate case filed in July 2012 with new rates effective 13 months from filing date 2014 first full year of new TEP rates UNS Convertible Bond redemptions Refinancing opportunities Potential increase in TEP's mining load

  16. Slide 16: TEP Long-Term Wholesale Sales

    TEP Long-Term Wholesale Sales Margin on long-term wholesale sales benefits shareholders Gross margin on total long-term wholesale sales was $13 million in 2011 Expect gross margin on 2012 long-term wholesale sales of $6 million Salt River Project (SRP) Contract modified in Dec. 2011 SRP required to

  17. Slide 17: Credit Ratings

    Credit Ratings Sufficient lines of credit TEP - $200 million; UES - $100 million; UNS - $ 125 million; mature in Nov. 2016 Credit ratings Fitch placed TEP on positive outlook in October 2011 TEP Fitch Secured BBB Unsecured BBB- Issuer BB+ Outlook S&P BBB+ BBB- BB+ Stable Moody's Baa1 Baa3 Baa3 Stabl

  18. Slide 18: Long-Term Debt Summary

    Long-Term Debt Summary Balances as of 4/30/12 Rates as of 4/25/12 Interest Curr. Balance Issue Maturity Current Facilities Debt Issue Rate (in millions) Date Date Call Price Security Financed TEP Unsec. Ind. Dev. Bonds (Tax-Exempt) 2009 Pima A 4.950% 80 Oct-09 Oct-20 N/C Unsecured San Juan PC 2010 C

  19. Slide 19: Supplemental Information

    SUPPLEMENTAL INFORMATION 18

  20. Slide 20: Regulated Electric and Gas Utility Businesses

    Regulated Electric and Gas Utility Businesses Largest Subsidiary of UNS Approx. 80% of Revenues and Assets Vertically Integrated Electric Utility 405,000 Electric Customers Gas Distribution Business Vertically Integrated Electric Utility 148,000 Gas Customers 91,000 Electric Customers NYSE: UNS 2011

  21. Slide 21: Utility Service Areas

    Utility Service Areas Navajo Sundt Moenkopi Peacock Marketplace Kayenta Tucson Generating Station Coal Mine Interconnection With Other Utility Substation Solar Station TEP 405,000 customers UNS Gas 148,000 customers UNS Gas & Electric UNS Electric 91,000 customers High Voltage Transmission Lines San

  22. Slide 22: TEP - Retail Customers

    TEP - Retail Customers TEP customer base continues to grow at a modest pace Long-term outlook positive with a customer growth rate of approx. 1% in 2013 Retail Customer Growth Possible addition of Rosemont Copper mine in 2014 with usage of ~ 100MW Support from local business organizations; oppositio

  23. Slide 23: TEP's Energy Resources Provide Optionality

    TEP's Energy Resources Provide Optionality Leased and dual fuel plants provide optionality Springerville Unit 1 lease (expires Jan. 2015) has fair market value purchase and lease renewal options No near-term new base load generation requirements Substation and transmission line additions are expandi

  24. Slide 24: Springerville Leases

    Springerville Leases Springerville Facility Expiration Purchase / Renewal Option TEP Equity Interest Unit 1 January 2015 Fair market value purchase or renewal Fair market value appraisal of $159 million for 86% of the equity interest TEP must provide notice of intent to purchase by Sept. 2013 14% Co

  25. Slide 25: Strong Coal Plant Operating Performance

    Strong Coal Plant Operating Performance Average Equivalent Availability Factor Baghouse - Low NOx Existing Environmental Equipment Operator TEP's Share (MW) Coal Delivery In Service Dates TEP's Share (%) TEP 156 MW rail 1967 100% TEP 770 MW rail Unit 1 - 1985 Unit 2 - 1990 100% Arizona Public Servic

  26. Slide 26: TEP Environmental Overview

    TEP Environmental Overview Coal Plant TEP's Anticipated Environmental Capital Costs for 2011 - 2018 Pending Regulations Upgrades Springerville Units 1 & 2 $5M MATs (2015) Mercury controls San Juan Units 1 & 2 $180M-$200M Regional Haze / BART (2016) SCR Navajo Units 1 - 3 $86M MATs (2015), Regional H

  27. Slide 27: TEP Generation Portfolio

    TEP Generation Portfolio Fuel/ Plant Fuel/ Plant Unit No. Location Date In Service Operator TEP's Share % TEP Share Net Capacity MW Coal Coal Springerville Station 1 Springerville, AZ 1985 TEP 100 401 Springerville Station 2 Springerville, AZ 1990 TEP 100 403 San Juan Station 1 Farmington, NM 1976 P

  28. Slide 28: Investments in Renewable Energy

    Investments in Renewable Energy Arizona Renewable Energy Standard and Tariff 15% of all retail energy needs from renewable resources by 2025 Cost recovery, including ROI, through RES surcharge on owned resources 27

  29. Slide 29: Renewable Resources and Counterparties

    Resource/ Counterparty Resource/ Counterparty Technology Location Operator Completion Date Term (Years) Purchase Option Capacity MW Solar Solar Amonix Concentrating PV Tucson, AZ Amonix Mar 2011 20 On or after yr. 6 at FMV 2 Swan Solar Concentrating PV Tucson, AZ Amonix Oct 2012 20 12 NRG Solar Fixe

  30. Slide 30: UniSource Energy Services

    UniSource Energy Services UNS Gas T&D retail gas business 148,000 retail customers 2011 retail sales - 114 million therms Rate Case Activity 2012 Rate Order $2.7 million base rate increase Lost fixed cost recovery mechanism 9.75% ROE UNS Electric Vertically integrated electric utility 91,000 retail

  31. Slide 31: Regulatory Overview

    REGULATORY OVERVIEW 30

  32. Slide 32: Regulatory Oversight

    Regulatory Oversight Arizona Corporation Commission Set retail energy rates Constitutionally created branch of Arizona government Five commissioners elected state-wide Limited to serve two consecutive four year terms Commissioner Term Expires Gary Pierce (R) (Chairman) Jan. 2015* Brenda Burns (R) Ja

  33. Slide 33: Energy Efficiency Standards

    Energy Efficiency Standards ACC Energy Efficiency Standards Designed to require TEP and other affected utilities to implement cost effective demand side management programs Electric EE Standards target total retail kWh savings in 2012 of 3.0% of 2011 sales Targeted kWh savings increase annually in s

  34. Slide 34: 2008 TEP Rate Order Key Provisions

    2008 TEP Rate Order Key Provisions Methodology Cost-of-service Test year 12/31/2006 Rate base $1.02 billion 2006 Retail Sales (GWh) 9,320 Allowed ROE 10.25% Capital Structure 42.5% equity / 57.5% debt (Actual capital structure was 40% equity, excluding capital leases, and 60% debt) Non-fuel base rat

  35. Slide 35: 2008 TEP Rate Order - Key Provisions

    2008 TEP Rate Order - Key Provisions ACC Decision No. 70628 II. Rate increase 2.2 TEP's rates, including generation, will be determined using a cost-of-service methodology. ....TEP shall withdraw its proposed market and hybrid rate methodologies. Original cost rate base: $1.02B (net of $134M of adju

  36. Slide 36: 2008 TEP Rate Order - Key Provisions

    2008 TEP Rate Order - Key Provisions X. Rate case moratorium 10.1 TEP's base rates shall remain frozen through December 31, 2012. 10.2 TEP shall not submit a rate application sooner than June 30, 2012. ...test year ending no earlier than December 31, 2011. 10.2 Signatories agree to use their best ef

  37. Slide 37: Reconciliation of Non-GAAP Measures

    RECONCILIATION OF NON-GAAP MEASURES 36

  38. Slide 38: Reconciliation of Non-GAAP Measures: Base O&M

    Reconciliation of Non-GAAP Measures Base O&M 37 Base O&M, a non-GAAP financial measure, should not be considered as an alternative to Other O&M, which is determined in accordance with GAAP. We believe Base O&M provides useful information to investors because it represents the fundamental level of op

  39. Slide 39: Reconciliation of Non-GAAP Measures: TEP Retail Margin Revenues

    Reconciliation of Non-GAAP Measures TEP Retail Margin Revenues 38 Retail Margin Revenues, a non-GAAP financial measure, should not be considered as an alternative to Net Electric Retail Sales, which is determined in accordance with GAAP. Retail Margin Revenues excludes: (i) revenues collected from r

  40. Slide 40: Reconciliation of Non-GAAP Measures: TEP Long-Term Wholesale Margin Revenues

    Reconciliation of Non-GAAP Measures TEP Long-Term Wholesale Margin Revenues 39 Long-Term Wholesale Margin Revenues, a non-GAAP financial measure, should not be considered as an alternative to Electric Wholesale Sales, which is determined in accordance with GAAP. We believe the change in Long-Term Wh