Nautilus Minerals — Investor Presentation (September 2016)
18 slides from Nautilus Minerals's investor presentation, Sep 16, 2016
Slide 1: Nautilus Minerals Investor Update
Nautilus Minerals Investor Update September 16th, 2016 © Nautilus Minerals 2016
Slide 2: Disclaimer and Legal Notice
Disclaimer and Legal Notice All information of a scientific or technical nature contained in this Presentation has been reviewed and approved by Mike Johnston, President and CEO of Nautilus Minerals Inc. (the “Company” or “Nautilus”), who is a qualified person under National Instrument 43-101. T
Slide 3: Agenda
Agenda Nautilus Minerals - snap shot Recap - The Seafloor Mining system Current Status Remaining Plan To Completion Finances Growth © Nautilus Minerals 2016 September 2016 3
Slide 4: Who is Nautilus Minerals?
Who is Nautilus Minerals? TSX listed and trading on OTCQX Major Industry Shareholders and Nasdaq Intl Designation ~27% Market capitalisation ~C$91 million ~15% as at Sept 12, 2016 Cash on hand ~US$51.4 million as each on a non-diluted basis, excluding loan shares outstanding under the Company’
Slide 5: Recap - Seafloor Mining System at Solwara 1
Recap - Seafloor Mining System at Solwara 1 Using existing technology from the offshore oil and gas sector, combined with rock cutting and materials handling technologies used in land- based operations Production Support Vessel – Operational base. Power supply and dewatering plant, material storag
Slide 6: Current status - overall summary
Current status - overall summary All key “below waterline” equipment completed; • Seafloor Production Tools – delivered and in storage • Pump – FAT completed - delivery Nov 2016 • Riser – in storage Vessel Build continues, but under revised schedule Key minor contracts continuing (see slide 7)
Slide 7: Project contract status
Project contract status Major equipment contracts complete Progressing work on control systems and environmental scope Pending contracts will be largely Chinese based Contract Status Completed Progressing Pending award SPTs SPE storage/wet testing Derrick Riser pipe Simulator/ control systems
Slide 8: Revised work program
Revised work program* *Based on the Company obtaining the necessary additional funding by June 2017 (refer to the Company’s news release dated August 22, 2016 © Nautilus Minerals 2016 September 2016 8
Slide 9: Current status of the Seafloor Production Tools
Current status of the Seafloor Production Tools Seafloor Production Tools (SPTs) – Delivered – in Oman – Reviewing wet testing options Umbilical winches for the 3 SPTs – FAT completed – Currently being stored at SMD SMD – Soil Machine Dynamics SPTs on vessel to Oman Umbilical Winch BC CM AC © Na
Slide 10: Current status of the Riser and Lifting System
Current status of the Riser and Lifting System Riser – Complete – Being stored in the US Subsea Slurry and Lift Pump (SSLP) SSLP 3 pipe riser – FAT completed (meets performance criteria of functional specification) – Delivery date November 2016 – Will be stored in the US SSLP Main riser welding
Slide 11: Current status of the Production Support Vessel
Current status of the Production Support Vessel Current Status of the PSV Marine Assets Sept 2015 Corporation – – Keel laying - June 10, 2016 Vessel Owner Item Completed % Fujian Mawei Production drawings 90 Shipbuilding Ltd. – Steel cut - 20,068 tonnes 99 Building the Production Support Block
Slide 12: Licence to operate
Licence to operate Maintain ML154 in good standing – MRA (regular meetings, etc.) – ML / EL reporting and maintenance Maintain Political and Social Licence to Operate – Honouring commitments – Health Public Private Partnership Environment – CEPA (regular meetings, etc.) – EMMPs on track (Q1 20
Slide 13: Ongoing data collection – for EMMP's
Ongoing data collection – for EMMP’s Sedimentation rates (capturing events) Noise (quantifying background noise and capturing events) Stakeholder engagement © Nautilus Minerals 2016 September 2016 13
Slide 14: Funding status - summary
Funding status - summary US$51.4million cash (as of June 30, 2016) Subscription Agreement Signed – Mawarid Offshore Mining Ltd. and Metalloinvest Holding (Cyprus) Limited – EGM of its shareholders October 26, 2016 in order to seek approval of the bridge financing – To raise gross proceeds of up
Slide 15: Funding status - going forward
Funding status - going forward We do require more funding: – for the Solwara 1 Project build and delivery – to maintain and grow the business – to commence deployment and operations at the Solwara 1 Project by the end of Q1 2019* Revised Plan splits requirement into 3 or 4 manageable, more evenl
Slide 16: Growing the business
Growing the business Drill rig – modifications underway Self potential sensor – building Targeting initial programs on water by end of year © Nautilus Minerals 2016 September 2016 16
Slide 17: Major milestones to end of 2017
Major milestones to end of 2017 Item Date due Complete EMMPs Q1 2017 Vessel launched for first time end Q2 2017 Additional finance in place mid 2017 Second dry docking of vessel Q3 2017 Dewatering plant and derrick committed Q4 2017 © Nautilus Minerals 2016 September 2016 17
Slide 18: Building Momentum
Building Momentum Mike Johnston President & CEO [email protected] www.nautilusminerals.com www.cares.nautilusminerals.com Month 2013 18