September 2, 2008 LEHMAN BROTHERS CEO ENERGY / POWER CONFERENCE David Hauser Group Executive and Chief Financial Officer
Slide 2: Safe Harbor Statement
SAFE HARBOR STATEMENT Some of the statements in this document concerning future company performance will be forward-looking within the meanings of the securities laws. Actual results may materially differ from those discussed in these forward-looking statements, and you should refer to the additiona
Slide 3: Low-Risk Business Profile
LOW-RISK BUSINESS PROFILE U.S. Franchised Commercial Duke Energy Crescent Electric and Gas Power International Resources 28,000 MW of regulated ~7,600 MW of unregulated ~4,000 MW of primarily ~$125 MM equity generation; electric T&D generation; wind & Latin American generation investment in real est
Slide 4: Adjusted Earnings and Dividends – Steady and Growing
ADJUSTED EARNINGS AND DIVIDENDS – STEADY AND GROWING Adjusted Diluted Earnings Per Share $1.27* $1.25 $1.23 2007 Year-to-date adjusted earnings per share have $1.00 2008 been favorable compared to the same period in 2007 $0.75 Increased from $0.54 in 2007 to $0.61 in 2008 $0.50 $0.61** $0.30 $0.
Slide 5: Modernization Projects
MODERNIZATION PROJECTS Construction underway for 800MW coal-fired facility Cliffside $1.8 billion expected cost ($2.4 billion including AFUDC) On target for 2012 completion Received approval from NCUC to build two 620 MW gas-fired CC plants Initial installation as CT N.C. gas-fired plants
Slide 6: Modernization Projects Cont'd
MODERNIZATION PROJECTS CONT’D Construction is underway on 630 MW IGCC facility Updated cost estimate of $2.35 billion Fleet Edwardsport IGCC 18% increase over prior estimate Modernization Awaiting IURC approval based on revised cost estimate 2012 in-service date Indiana Filed proposal wi
Slide 7: Transmission Joint Venture
TRANSMISSION JOINT VENTURE 50-50 joint venture with AEP Construct, own and operate 240 mile 765-kV transmission line in Indiana ~$1 billion project Will provide a link between: North central Indiana including ~3,000 MW of potential wind development and Baseload generation in southwestern
Slide 8: Regulatory Update
REGULATORY UPDATE Places energy efficiency on par with new generation Retains characteristics of regulatory model based on a percentage Key Attributes of the Company’s avoided cost of new generation Pay for performance – the Company only receives payment for verified results Reached settleme
Slide 9: Regulatory Update Cont'd
REGULATORY UPDATE CONT’D Filed ESP on July 31, 2008 Term of plan: 2009-2011 PUCO Procedural Schedule For Duke’s ESP Rates effective 1/1/2009 9/4/08 Motions to intervene to be filed 10/3/08 Intervenor testimony is due ~6% initial increase in total annual electric revenues 10/7/08 Discovery re
Slide 10: Environmental Projects
ENVIRONMENTAL PROJECTS Duke less impact by vacated Clean Air Interstate Rule (CAIR) ~$5 billion environmental compliance program largely completed Potential for new rule to be more stringent Net % Complete Est. Completion Cost Recovery MW (Const.) SCR FGD Mechanism Allen 1-5 1,145 73% (FGD) N/
Slide 11: Commercial Business Update
COMMERCIAL BUSINESS UPDATE Wind generation Over 500 MW in operation by end of 2009 240 MW currently under construction Happy Jack 283 net MW acquired with Catamount Energy transaction Expect to close 4Q08 Over 5,000 MW development Ocotillo pipeline (including Catamount) Sweetwater Notree
Slide 12: Value Proposition
VALUE PROPOSITION Proactive regulatory strategy Annual Total Return Profile 15% Forecast 5% to 7% CAGR in adjusted diluted EPS through 2012 10% Annual dividend growth 5% Strong balance sheet provides flexibility 0% EPS Growth Dividend TSR Yield * * Based on current dividend yield of approxim
Slide 13: Duke Energy – September 2008
~ Mh yA « Wig te, 2 ka pale ATER nn" [ss >. Ly, fa £7 i DUKE ENERGY - SEPTEMBER 2008