Tellurian — Magellan Petroleum — Investor Presentation (May 2010)
21 slides from Tellurian's investor presentation, May 7, 2010
Slide 1: Financing Review
Financing Review Exhibit 99.1 May, 2010 New York William H. Hastings Portland, Maine
Slide 2: Forward-Looking Statements
Forward-Looking Statements Forward-Looking Statements Except for historical information, this presentation contains forward looking statements and information with respect to net reserve valuations and sums, gas sales in Australia and its valuation, oil and gas development projects, expense reductio
Slide 3: Overview and Key Points
Magellan; publicly listed E&P company No Sell-Side Research Coverage $38mm of Cash and no debt Owns onshore gas fields in Australia New management installed in 2008 New Strategic investor acquired 27% stake in 2009 Acquired two growth projects, • $112mm market Cap trading under the symbol : MPET • N
Slide 4: Company history timeline
1954 1960’s 1980’s and 90’s 2003 December 2008 July 2009 October 2009 October 2009 April 2010 1954 • • MPET listed as exploration-oriented oil company MPET listed as exploration - oriented oil company - oriented oil company oriented oil company 1960’s • • Amadeus Basin Gas Fields in Central Aust
Slide 5: Management Team
100 years + of oil industry experience (added last year) Advisory Roles Offices in Portland, Maine; Denver, Colorado; Brisbane, Australia Management Team Management Team • William Hastings Joined in 2008, retired in 2007 from Marathon Oil Corporation after 27 years there. Last 8 years (off/on) invol
Slide 6: Growth Opportunity: Poplar Dome CO2 Flood / Bakken
Growth Opportunity 1. Poplar Dome CO2 Flood/ Bakken play in Montana e Acquired an 93.8% interest in the Poplar Dome fields containing up to 800 million barrels gross OOIP ospsounence + Dome has produced 36 million barrels or 7% of QOIP since 1956 Currently producing 260 hepa * Field inchades 23,000
Slide 7: eRe
Aa eRe
Slide 8: Poplar Dome Plans - Infill Bakken CO2 Flood
Infill Bakken CO2 Flood Poplar Dome Plans - Poplar Dome Plans - 2011 2011 • Drill Infill wells, Evaluate Bakken JV, Test CO2 factors • Drill up to eight infill wells out of thirty-six infill locations • Probable reserves at 600k to 1.2 million barrels per well • Capital cost for eight wells will be
Slide 9: Growth Opportunity: Gas to Methanol development, offshore Australia
Signed Agreement to acquire a 40% operating interest in the Evans Shoal field, offshore Australia with estimated gross contingent resources of 6.5 to 8 TCF (analysis dependent) and 50 mmbbls condensate. Development plan addresses less than 25% of reserves Global Methanol demand expected to grow at 8
Slide 10: Regional gas resources map
Abadi 10-14.5 TCF Evans Shoal 8 TCF Heron /Blackwood 1.5 TCF Petrel & Tern 2 TCF Caldita - Barossa 6 TCF Turtle/Barnett (Undeveloped Oil) Chuditch 700 BCF Kelp 700 BCF Montara 2 TCF Saratoga & Prometheus 1.5 TCF Crux, Padthaway Complex 2 TCF Brewster 800 BCF Lynedoch 1 TCF Vienta, Waggon Creek, Weab
Slide 11: Methanol demand and prices
« Methanol demand into energy applications has continued to » Demand into energy applications expected to drive grow at high rates despite the recent economic slowdown higher industry growth 2009 - 2014 CAGR: 8% a = [4 {6952008 CAGR 45% I I lal Fuel Blencing (inel Biadiesel) om DME £6 ff : FF IIIS S
Slide 12: Australia Gas to Methanol Overview
Australia Gas to Methanol Overview Australia Gas to Methanol Overview • Development using excess CO2 in process
Slide 13: Evans Shoal Plans
Fiscal 2011 Plan Fiscal 2012 to 2014 Plan Production startup, 360 mmcfd minimum, 2015 Evans Shoal Plans Evans Shoal Plans • Size and Gas quality testing, followed by development • Receive Co-owner vote to become Operator • $80 million gross capital expenditure • $32 million net • Two delineation wel
Slide 14: Legacy Projects
Mereenie Oil Field, onshore Australia Palm Valley Gas Field, onshore Australia United Kingdom drilling development Legacy Projects Legacy Projects • Existing onshore licenses and production • $175 million PV-10 gross, Magellan is 35% • Additional 70mmboe of contingent resource on the western end (no
Slide 15: Capital Plan
Capital Plan Capital Plan • Financing Requirements Fiscal 2011 (30th June, 2010 to 30th June, 2011) Preliminary Budget Growth Projects Poplar Dome area, Montana Drill up to eight infill oil wells 12.0 $ Complete Single Well Tracer program on up to four wells 2.0 $ Evans Shoal Area, Australia Remaini
Slide 16: Comparison; Magellan (MPET) with Interoil (IOC)
Comparison; Magellan (MPET) with Interoil (IOC) MPET is significantly undervalued Comparison of Interoil and Magellan Company Variables Interoil - IOC Magellan - MPET Shares Outstanding 44.85 51.90 Share Price 68.00 $ 2.16 $ Market Capitalization 3,049.8 $ 112.1 $ Cash 75.80 38.00 Debt 52.60 0.50 Va
Slide 17: Additional Documents / Data
Additional Documents / Data
Slide 18: Slide 18
Slide 19: Magellan Business Model
Magellan Business Model Pacific Entry costs from US$ .05/mcf and up (proven undeveloped) LNG and Methanol technologies usable US$12 per mmbtu equivalent delivered Correlated to oil Closest Supply Develop “discovered” resource for Asia Redevelop underdrilled, existing assets Reserves Available Methan
Slide 20: Browse / Bonaparte Basins map
Browse / Bonaparte Basins Contingent Resource 6-8 TCF+ Carnarvon Basin 3C 115 TCF ** Darwin Alice Springs Amadeus Basin 40mmcfd production level, two field, oil ring also in production Contingent Resource 300BCF and up to 70mmbbl gross after significant, successful development drilling Acquired 40%
Slide 21: Darwin area infrastructure
Central Darwin (pop 120,000) Darwin Airport Bayu Undan LNG (complete) East Jetty (offtake connections) NT Power Plants Methanol Plant Sites