  2. Slide 2: Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995

    “Safe Harbor” Statement under the Private Securities Litigation Reform Act of 1995 Statements made during this presentation contain forward-looking statements which are subject to risks and uncertainties. These include legislative and regulatory initiatives regarding deregulation and restructuring o

  3. Slide 3: Geoff Chatas, Vice President – Investor Relations & Corporate Finance

    Geoff Chatas Vice President – Investor Relations & Corporate Finance 3

  4. Slide 4: Investment Highlights

    Investment Highlights ! Diversified, low cost electric generation assets and extensive transmission assets – the largest in the industry – provide a competitive advantage ! Core utility operations in 11 states generate over $1 billion in stable earnings ! Recommended dividend reduction to $1.40/shar

  5. Slide 5: Strategic Priorities

    Strategic Priorities ! Maintain safe, reliable service to customers ! Improve generation availability ! Utilize strong risk management standards ! Strengthen financial position – Ongoing reduction in operating and capital expenditures – Cut in common dividend payment – Systematic disposition of non-

  6. Slide 6: Generation: Low Cost & Highly Contracted

    Generation: Low Cost & Highly Contracted Fuel Mix ! 38,000 MW of low cost generation Natural Gas 18% – 2002 average variable cost of $14 - Nuclear 8% $15/MWh for coal facilities Wind/Hydro/ ! Highly contracted Coal/Lignite 71% Pumped Storage 3% – 90% of East Fleet – 100% of West Fleet – Remainder so

  7. Slide 7: Customer Diversity & Cost Advantage

    Customer Diversity & Cost Advantage Electric Operating Revenues by Customer Class (% kWh) Rate Comparison (cents/kWh) 10.00 8.17 NERC Average Residential 7.03 40% 6.54 5.78 4.97 5.00 Commercial 4.07 35% Industrial 25% 0.00 Residential Commercial Industrial DIVERSIFIED CUSTOMER BASE AND LOW COST DIST

  8. Slide 8: System Sales

    System Sales ! Less than 5% of gross margin from Utility Operations are derived from system sales ! “At risk” earnings and cash flow around system sales managed through hedging program ! Hedging levels are maintained below available capacity to provide adequate cushion for operational flexibility !

  9. Slide 9: Ohio Utilities

    Ohio Utilities ! 1.4 million customers Service Territory ! 11,000 MW generation capacity ! Wires rates frozen through 2007 and 2008 Conesville ! Generation rate frozen through 2005 OH Cardinal ! Low rates – only 1,000 customers Muskingum River Kammer-Mitchell have switched Picway Racine ! Generation

  10. Slide 10: Texas Utilities

    Texas Utilities ! 879,000 customers Service Territory ! 5,900 MW generation capacity ! Retail customer provider sold to Lake Pauline Centrica with two-year supply Vernon Oklaunion contract Paint Creek Fort Phantom ! Filed plan to sell generation assets Abilene with PUCT Oak Creek San Angelo Fort Dav

  11. Slide 11: Non-Core Assets

    Non-Core Assets ! Generation: ERCOT Generation Assets Fiddler’s Ferry & Ferrybridge Pushan Bajio IPPs ! Gas: Houston Pipe-Line Louisiana Intrastate Gas ! Other: AEP Coal AEP & C3 Communications DIVESTITURE PROGRAM NOT EXPECTED TO DILUTE ON-GOING EARNINGS 11

  12. Slide 12: Fiddler's Ferry & Ferrybridge

    Fiddler’s Ferry & Ferrybridge ! Continuing weak market environment ! Revenues exceed variable costs, inclusive of the connection fee Ferrybridge Fiddler’s Ferry ! Earnings drag to continue until market conditions improve ! Plan is to continue operations ! Long term options: shut down, mothball, sale

  13. Slide 13: US Gas Portfolio

    US Gas Portfolio ! Activity revolves around ownership of HPL and LIG – AEP’s earnings and cash flow are driven by its ownership of gas in storage and in pipeline ! Sources of revenue: – Pipeline transportation and related services – Full requirements contracts – Hedging activities related to storage

  14. Slide 14: Financial Fundamentals

    Financial Fundamentals ! Earnings ! Cash Flow ! Capital Structure AEP’S REFOCUS WILL REALIZE EARNINGS STRENGTH 14

  15. Slide 15: 2003 Earnings Breakdown

    2003 Earnings Breakdown GUIDANCE RANGE OF $2.20 TO $2.40 15

  16. Slide 16: Cash Flows

    Cash Flows $ MM 2003 Sources Internal: Net Income 790 Depreciation 1,400 Other - 2,190 External: Equity/Convertible 1,000 Long Term Debt Issuances 3,150 Asset Sales - Total Sources 6,340 Uses Cap Ex: Ongoing 1,200 Environmental 250 1,450 LTD Maturities 1,260 LTD Refunding 150 STD Reductions 2,740 Di

  17. Slide 17: Liquidity - Update

    Liquidity - Update $ MM Maturity 364-Day Bank Facility (committed) 750 May-04 3-Year Bank Facility (committed) 750 May-06 5-Year Bank Facility 1,000 May-05 Euro Bank Facilities (300MM Euro) 315 Oct-03 Total R/C Facilities 2,815 Plus AEP, Inc. Liquidity Reserve 300 Additional Cash on Hand 1,550 Total

  18. Slide 18: Capital Structure

    Capital Structure December 31, Pro Forma 2002 for Equity Offering Net Debt 1 $11,588 $10,588 Equity Units 2 376 376 Preferred Equity 145 145 Minority Interest 3 759 759 Shareholders’ Equity 7,064 8,064 Total Capitalization 19,932 19,932 Net Debt / Capitalization 58.5% 53.5% 1 Net of securitization b

  19. Slide 19: Investment Highlights

    Investment Highlights ! Diversified, low cost electric generation assets and extensive transmission assets – the largest in the industry – provide a competitive advantage ! Core utility operations in 11 states generate over $1 billion in stable earnings ! Recommended dividend reduction to $1.40/shar

  20. Slide 20: Appendix

    Appendix 20

  21. Slide 21: Domestic Generation

    Domestic Generation REGULATED GENERATION MW UNREGULATED GENERATION MW COMPANY COMPANY APCO 5,905 CSP 2,848 I&M 4,708 AEP Texas Central (Formerly CPL)* 2,207 KPCO 1,097 OPCO 8,805 PSO 4,145 AEP Texas North (Formerly WTU)* 786 SWEPCO 4,272 AEG Capacity Available to Unregulated 455 AEG Capacity Availab

  22. Slide 22: Long-term Debt Maturity Profile - Update

    Long-term Debt Maturity Profile* - Update Year 2003** 2004 2005 Appalachian Power $ 155,000,000 $ 121,000,000 $ 530,000,000 Central Power & Light $ 178,118,000 $ 27,400,000 $ 321,958,000 Columbus Southern Power $ 43,000,000 $ 52,500,000 $ 36,000,000 Indiana Michigan $ 30,000,000 $ 150,000,000 $ - Ke

  23. Slide 23: Regulatory Update

    Regulatory Update Ohio Texas • Retail rates frozen until 12/31/2005 • CPL & WTU Retail-sold to Centrica • OPCo wires rates frozen until 12/31/2007 • SWEPCO-capped until June 2003 • CSPCo wires rates frozen until 12/31/2008. • Wires—True-up in 2004 No fuel clause pass through • Fuel clause adj (SWEPC