Silver Bull Resources, Inc. · TSX:SVB
Silver Bull Resources — Investor Presentation (2013)
39 slides from Silver Bull Resources's investor presentation, Oct 8, 2013
Slide 1: Silver Bull Resources
SVBL: AMEX | SVBL: TSX | Web: www.silverbullresources.com
Slide 2: Forward Looking Statements
Forward Looking Statements Cautionary Note to U.S. Investors concerning estimates of Measured, Indicated and Inferred Resources: This presentation uses the terms "measured resources", "indicated resources", and "inferred resources" which are defined in, and required to be disclosed by, NI 43-101. We
Slide 3: Capital Structure
Capital Structure CAPITALIZATION SHAREHOLDERS Shares Outstanding 159,072,657 Directors and Officers: 5.4% Warrants 12,643,500 Coeur D’Alene Mines Corporation: 10.9% Options 7,830,002 Lazarus Investment Partners: 9.0% Sprott, RBC Precious Metals: 3.5% Fully Diluted 179,546,159 Goodman, US Global: 1.5
Slide 4: Who We Are
Who We Are MANAGEMENT BOARD OF DIRECTORS TIM BARRY BRIAN EDGAR President, CEO & Director Chairman * Full management bios in Appendix SEAN FALLIS TIM BARRY Chief Financial Officer President, CEO & Director MARK PFAU DANIEL KUNZ VP Exploration Director BILL PENNSTROM DR. MURRAY HITZMAN Consulting Meta
Slide 5: Sierra Mojada
SIERRA MOJADA NORTHERN MEXICAN CARBONATE REPLACEMENT TYPE DEPOSIT (CRD) 5
Slide 6: Sierra Mojada: Resource Overview
Sierra Mojada: Resource Overview • Sierra Mojada: scratching the surface on a northern Mexico Carbonate Replacement Deposit (“CRD”): Silver Resource: 163.6Moz Indicated @ 71.4g/t Ag (25g/t cutoff) Zinc Resource: 2.2Blbs Zn Indicated Lead Resource: 547Mlbs Pb Inferred Copper Resource: 129Mlbs
Slide 7: Regional CRD Occurrences
Regional CRD Occurrences silver Bull RESOURCES, INC. eo he:
Slide 8: CRD System – Idealized Geologic Model
CRD System – Idealized Geologic Model 8
Slide 9: Project Attributes
Project Attributes • Excellent infrastructure Railway to site Paved road Grid power 5 company owned water wells • Open pittable project with favorable ground conditions • Mining district with skilled labour force 9
Slide 10: Sierra Mojada PEA Highlights
Sierra Mojada PEA Highlights Sierra Mojada Project PEA Silver/Zinc Price Assumptions $23.50/oz Ag, $0.95/pound Zn Initial Capital Expenditures $297.2 million Estimated Life of Mine 18 years Avg Plant Throughput 8,500 tonnes per day Avg Silver Head Grade 73.39g/t Ag Avg Annual Silver Production 5.5 m
Slide 11: CAPEX/OPEX Breakdown
CAPEX/OPEX Breakdown Pre-Production Capital Costs$M Operating Cost $/tonne milled Pre-Stripping 10.9 Mining 11.03 Mining Equipment 10.5 Processing 11.55 Site Development 4.8 G&A 1.39 Crushing & Coarse Ore Stockpile 14.2 Processing Plant 69.2 Leasing 2.57 Tailings 9.4 Total Operating Cost 26.54 On-Si
Slide 12: Economic Sensitivity (after tax)
Economic Sensitivity (after tax) 800 $745.2 60.0% 700 $658.7 50.0% 600 $528.8 After-tax NPV (millions) 40.0% 500 $399.0 NPV (5%) 400 33.0% 30.0% $312.4 30.1% IRR 300 25.5% $225.7 20.0% 20.7% 200 $135.3 17.5% 14.1% 10.0% 100 10.4% 0 0.0% $16 $18 $20 $22 $25 $28 $30 Silver Price 12
Slide 13: Project Strengths
Project Strengths NSR Zinc Cash Cost per ounce of Silver (Net of 28% Byproducts): Silver 72% $6.58/oz Avg Annual Operating Cashflow: Production Profile: • Years 1-5: 7 million ounces/year $93,500,000 • Year 2: 9 million ounces • Life of Mine – 5.5 million ounces/year 13
Slide 14: Sierra Mojada: Silver-Zinc Resource
Sierra Mojada: Silver-Zinc Resource N 14
Slide 15: Resource Profile
Resource Profile Silver Indicated Resource W E Cross section profile Zinc Indicated Resource Cross section profile 15
Slide 16: Open Pit Cross Section
Open Pit Cross Section Silver ore Zinc ore body body The economics of mining the Zinc Zone dramatically improve after mining out the silver resource 16
Slide 17: NI43-101 Indicated Resource
NI43-101 Indicated Resource Cut-Off Silver Grade Silver Ounces Zinc Grade Pounds Zinc Tonnage (Ag g/t) (g/t) (Moz) (%) (lbs) >100 g/t 13,553,000 170.1 74.1 1.59 476,081,000 INDICATED RESOURCE > 80 g/t 19,205,000 146.2 90.3 1.57 662,915,000 > 65 g/t 25,318,000 128.3 104.5 1.54 860,189,000 > 55 g/t 31
Slide 18: Silver Resource Expansion
Silver Resource Expansion *Moz Ag 2013 Silver Resource Grade 180 160 140 3.5x Resource Growth 163.6 71.4g/t Silver (M&I) >25gpt cutoff grade 120 2012 Silver Resource Grade 50g/t Silver 100 80 10.4 60 72.1 >25gpt cutoff grade 13.9 40 47.3 2013 Resource Cutoff & Grade 20 Cutoff Silver Grade Silver Moz
Slide 19: Drill Results Across Resource
Drill Results Across Resource 19
Slide 20: High Grade Starter Pit
ws High Grade Starter Pit sive: su RESOURCES, INC LEGEND BI > 10001 Ag Ex >25g/t Ag
Slide 21: Mining Flow Sheet
Mining Flow Sheet Mining Crush & Grind VAT Leach SART Cyanide Silver Recovery Merrill Crowe (75%+) Regeneration (98%+) Pb rich tailings Zn Sulfide Recovery SART (40-50%) Flotation of Pb (Recovery Test work Underway) Tailings
Slide 22: 2013 Drill Program
Extension of High Grade Silver Zone 2013 DRILL PROGRAM 22
Slide 23: 2012 Drill Program Results
2012 Drill Program Results (Underground Phase 1) March 1, 2013: Silver Bull Intersects 19.52% Zinc Over 22.85 Meters Including 47.59% Over 4.4 Meters January 31, 2013: Silver Bull Intersects 15.65% Zinc Over 43.55 Meters Including 20.26% Over 14.5 Meters November 15, 2012: Silver Bull Intersects 463
Slide 24: Planned Drill Program
Planned Drill Program (Underground Phase 2) Phase 1 - High Grade Silver Zone (1.5km strike): completed Dec/12 Phase 2 – Centenario West extension (+1.5km strike): 24
Slide 25: Near Resource Extension Zones
Near Resource Extension Zones 25
Slide 26: Exploration Upside
EXPLORATION UPSIDE 26
Slide 27: Exploration Upside
Exploration Upside 2 MAIN TARGETS OUTSIDE THE MAIN ZONE OF MINERALIZATION: DORMIDOS PALMOS NEGROS DORMIDOS & PALAMOS NEGROS SHALLOW SILVER ZONE HISTORICAL MINING AREAS WITH EXTENSIVE UNDERGROUND AND SURFACE WORKINGS: NEVER EXPLORED WITH MODERN TECHNIQUES NEXT STEPS BEYOND 2012 RESULTS FROM INITIAL S
Slide 28: Palamos Negros
a Palamos Negros Silver Bull RESOURCES, INC. Approximate trace of Sierra 565g/t Ag, 1.6% Zn, — 2.64% Pb 33g/t Ag, 11.25% Pb,| = 0.7% Mo 434g/t Ag, 1.57% Zn, 1.69% Pb Se ~ | 35¢/tAg, Ag, 15.8% ~~ Z 0.07% Mo 67g/t Ag, 0.3% Zn, 1.82% Pb 91g/t Ag, Se N\y 21.3% Pb SS =, a Se : = 149g/t Ag, 2.02% Zn, 0.6%
Slide 29: Dormidos
‘a — —— 307g/t Ag, 0.37% Zn, - a N | 89g/t Ag, 2.55% Zn, * Dormidos Approximate trace of the Sierra Mojada Fault (black line) 111g/t Ag, 5.91% Zn, 10.3% Pb =) 81g/t Ag, 11.25% Zn, 4.6% Pb Ta Sak — en 63g/t Ag, 7.4% Zn, “| PALOMOS NEGI ROS
Slide 30: Why Silver Bull?
Why Silver Bull? • Developing one of North America’s largest primary silver projects • Strong cash position – $6.5m • Highly favorable project economics • 100% of silver/zinc resource M&I – no additional drilling to incorporate in Pre-Feasibility Study • Significant resource growth potential • Infra
Slide 31: Junior Silver Developers in Mexico
Junior Silver Developers in Mexico Comparables Based on Silver Resource Size & Grade 400,000,000 20 350,000,000 300,000,000 250,000,000 200,000,000 363,900,000 70 728 150,000,000 100,000,000 57 162,900,000 72 146,000,000 80 26 50,000,000 73 77,400,000 53,559,000 50,494,000 39,898,000 32,724,441 0 Le
Slide 32: Peer Valuation Analysis
Peer Valuation Analysis Comparables Enterprise Value/M&I Silver Resource $3.00 $2.50 $2.41 $2.00 $1.95 $1.50 Average: $0.99 $1.00 $0.50 $0.94 $0.33 $0.32 $0.31 $0.11 $- MAG Silver Tinka Resources Kootenay Silver Silver Bull International Wildcat Silver Soltoro *100% inferred Resources Northair Mines
Slide 33: Coverage List
Coverage List Financial Analyst Category Phone Email Institution PI Financial Phil Ker Full Coverage 647-789-2407 [email protected] Roth Capital Jeff Martin Full Coverage 949-720-7178 [email protected] Canaccord Nicholas Watch List 604-643-7027 ncampbell@canaccordge Campbell nuity.com Pope & C
Slide 34: Appendix
APPENDIX SVBL: AMEX | SVBL: TSX | Web: www.silverbullresources.com
Slide 35: Conceptual Mine Plan
Conceptual Mine Plan Tails Pond Waste Dump Waste Dump 35
Slide 36: Top 25 Silver Mines CAPEX and Production Comparison
Company Project Country LOM CAPEX Peak Output Barrick Pascua Lama Chile/Arg 16,535 45 Project Allied Nevada Hycroft USA 4,185 29 CAPEX and Goldcorp Cerro Negro Argentina 2,667 4 Production Pan American Navidad Argentina 1,665 21.4 Comparison Silver Standard Pitarrilla Mexico 1,056 18 Tahoe Escobal G
Slide 37: Management Resumes
Management Resumes Tim Barry, CEO, President and Director - Mr. Barry is the President and CEO of Silver Bull Resources, Inc. Between September 2010 to March 2011, Mr. Barry served as Vice President of Exploration for Metalline Mining (now renamed to Silver Bull Resources), before stepping into the
Slide 38: Board of Directors - Resumes
Board of Directors - Resumes Brian Edgar, Chairman of the Board - Mr. Edgar was appointed Chairman of the Board of Directors in April 2010. Mr. Edgar has broad experience working in junior and mid-size level natural resource companies. He previously served as Dome's President and Chief Executive Off
Slide 39: Silver Bull Resources
SVBL: AMEX | SVBL: TSX | Web: www.silverbullresources.com