Antipa Minerals Limited · ASX:AZY

Antipa Minerals — Precious Metals Summit Zurich (November 2026)

40 slides from Antipa Minerals's conference presentation, Nov 9, 2026

  1. Slide 1: Dominant 100% Owned Paterson Province Landholding

    rsonal use only WITH A DOMINANT 100% OWNED PATERSON PROVINCE LANDHOLDING FEATURING THE STAND-ALONE MINYARI DOME GOLD-COPPER DEVELOPMENT PROJECT ASX: AZY | November 2026

  2. Slide 2: Disclaimer

    DISCLAIMER Nature of this document: The purpose of this document is to provide general information about Antipa Minerals Disclaimer: No representation or warranty, express or implied, is made by the Company that the material Limited (the Company). Unless otherwise stated herein, the information in t

  3. Slide 3: Acknowledgement of Traditional Custodians

    rsonal use only ANTIPA MINERALS ACKNOWLEDGES THE TRADITIONAL CUSTODIANS OF COUNTRY THROUGHOUT AUSTRALIA AND THEIR CONNECTIONS TO LAND, SEA AND COMMUNITY WE PAY OUR RESPECTS TO THEIR ELDERS PAST AND PRESENT, EXTENDING THAT RESPECT TO ALL ABORIGINAL AND TORRES STRAIT ISLANDER PEOPLES TODAY INVESTOR PR

  4. Slide 4: Consolidated Land Package, Resource and Cash Position

    rsonal use only CONSOLIDATED CURRENT MA JOR ONGOING 3,840 KM2 2.9MOZ GROWTH-FOCUS LAND PACKAGE GOLD RESOURCE DRILLING District Scale Large growth potential Minyari Dome and more Proximal to the Telfer mine 2.7 Moz of gold, Unlocking new mineral and Havieron and Winu 91,000 t of copper, and systems a

  5. Slide 5: Total Resource Growth Over Time

    rsonal use only TOTAL RESOURCE GROWTH OVER TIME DECEMBER 2025 2,700 koz Au 3,336 koz AuEq Gold-only Resource AuEq Resource MAY 2025 2,520 koz Au 3,083 koz AuEq SEPTEMBER 2024 2,424 koz Au 3,040 koz AuEq CURRENT RESOURCE MAY 2022 1,853 koz Au 2,298 koz AuEq 2.9 MOZ GOLD NOVEMBER 2017 MAY 2019 3.6 MOZ

  6. Slide 6: Stand-alone Minyari Dome Gold-Copper Development Project

    > nN (STAND-ALONE MINYARI ME GOLD-COPPER VELOPMENT PROJECT ersonal u

  7. Slide 7: Minyari Dome Gold Project Resource Base

    STAND-ALONE MINYARI DOME GOLD-COPPER DEVELOPMENT PROJECT RESOURCE BASE rsonal use only GOLD-ONLY CONTAINED RESOURCE (Moz GOLD) RESOURCE GRADE (g/t GOLD) 6.2 ONE OF THE MOST COMPELLING Youanmi 5.5 GOLD PROJECT DEVELOPMENT OPPORTUNITIES Ravensthorpe 3.4 NOT IN THE HANDS OF A MAJOR Gum Creek 1.9 2.9 PR

  8. Slide 8: Technical Studies Complete, Development Pathway Defined

    STAND-ALONE MINYARI DOME GOLD DEVELOPMENT PROJECT TECHNICAL STUDIES COMPLETE, DEVELOPMENT PATHWAY DEFINED rsonal use only TECHNICAL WORKSTREAMS PROCESSING CONFIGURATION COMPLETED SELECTED PRINCIPAL PFS TECHNICAL STUDIES COMPLETED, SETTING THE FIVE PROCESSING OPTIONS EVALUATED, WITH THE PREFERRED GOL

  9. Slide 9: Development Schedule

    rsonal use only CY26 CY27 CY28 CY29 CY30 Technical Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Deliverables1 Pre-Feasibility Study     Definitive Feasibility Study        FID (incl. Supporting Works) FEED/Long Lead Items   Construction/ Commissioning        Key Approval Q1

  10. Slide 10: CY2026 Resource Growth Focus

    rsonal use only  CY2025 results delivered both extensional success across multiple zones and multiple new discoveries  CY2026 targeting expansion of the existing near- surface Minyari Dome Mineral Resource to further enhance the development opportunity  Focus on extending the resources down dip a

  11. Slide 11: CY2026 Drilling Programme

    rsonal use only Drilling Programme focused on testing priority resource growth and greenfield targets and existing prospects proximate to Minyari Dome – This year to date completed 330 RC, diamond core and air core drill holes for 42,250m 1 New shallow high-grade lode discovered 65m north of Fiama:

  12. Slide 12: Tim's Dome High-Grade Gold±Copper Reef Targets

    TIM’S DOME HIGH-GRADE GOLD±COPPER REEF TARGETS LARGE-SCALE GOLD ± COPPER TARGETS1  Tim’s Dome 110koz gold resource with growth and discovery potential located just 11km from Telfer rsonal use only  Northwest strike continuation of Telfer host rocks and Telfer domal fold structure  Shallow cover b

  13. Slide 13: Tim's Dome Eastern Region Reef Targets Firming Up

    TIM’S DOME HIGH-GRADE GOLD±COPPER REEF TARGETS TIM’S DOME EASTERN REGION REEF TARGETS FIRMING UP1  Thick gold-copper-lead-silver mineralisation rsonal use only intersected in the multiple CY2026 RC holes drilled to date over approximately 1,000m of strike and remains open  Maximum 1m RC grades ret

  14. Slide 14: Minyari Deposit Area: AL01 Target

    MINYARI DEPOSIT AREA: AL01 TARGET A VERY LARGE-SCALE AIR CORE GOLD TARGET1  Located 17km north of Minyari rsonal use only  Multiple large AL01 gold-copper anomalies, with a combined strike of 4km – Anomalies remain open in most directions  Meta-sediment and dolerite hosted gold and pathfinder ano

  15. Slide 15: Minyari Dome Long Section Looking West

    MINYARI DOME RESOURCE AREA MINYARI DOME LONG SECTION LOOKING WEST rsonal use only SIGNIFICANT DEPOSITS WITH MULTIPLE RESOURCE EXTENSION TARGETS INVESTOR PRESENTATION | 15

  16. Slide 16: Multiple Resource Extension Targets Identified

    MULTIPLE RESOURCE EXTENSION TARGETS IDENTIFIED AT MINYARI DOME AND THE BROADER SATELLITE DEPOSITS TIM’S DOME – 30KM TO MINYARI CHICKEN RANCH – 25KM TO MINYARI MINYARI, WACA AND GEO-01 VIEW rsonal use only INVESTOR PRESENTATION | 16

  17. Slide 17: Minyari Deposit Area: Minyari

    300 metres MINYARI DEPOSIT AREA: MINYARI MRE: 1.9 MOZ GOLD, 69 KT COPPER, 579 KOZ SILVER AND 11 KT COBALT  Outstanding high-grade gold + copper-silver-cobalt mineralisation: rsonal use only  154 metres at 2.1 g/t gold and 0.1% copper from 9m in 16MYC0045  142 metres at 1.9 g/t gold and 0.2% coppe

  18. Slide 18: GEO-01 Deposit Area: Key Target Areas

    GEO-01 DEPOSIT AREA: KEY TARGET AREAS FEATURING DEPOSITS AT THE GEO-01 MAIN ZONE, CENTRAL, MINELLA, FIAMA, RIZZO, AND SURROUNDS  Large 1km by 800m mineralised footprint rsonal use only  Gold ± copper mineralisation remains open in several directions and at multiple deposits  CY2025 drilling in th

  19. Slide 19: GEO-01 Deposit Area: Fiama

    GEO-01 DEPOSIT AREA: FIAMA CURRENT MRE OF 130 KOZ OF GOLD WITH MA JOR UPSIDE1 Bonanza gold drill intersections up to 520 gram-metres in extremely high- rsonal use only grade zones. Mineralisation remains open in multiple directions, with significant intercepts including:  33m at 15.8 g/t gold and 0

  20. Slide 20: Fiama North Discovery

    GEO-1 DEPOSIT AREA: FIAMA NORTH DISCOVERY MAIDEN RESOURCE OPPORTUNITY IDENTIFIED IN PFS DRILLING1  Recent new gold ± copper discovery, located just 65m north of Fiama rsonal use only  Mineralisation exists beneath shallow cover of less than 5m  Mineralisation remains open in multiple directions,

  21. Slide 21: GEO-01 Deposit Area: Minella

    GEO-01 DEPOSIT AREA: MINELLA CURRENT MRE: 29 KOZ OF GOLD WITH GROWTH EXPECTED1 CY2025 drilling extended gold-copper mineralisation from 100 to 240 rsonal use only vertical metres below the surface and 130m along strike to the west Significant near-surface gold mineralisation:  67m at 1.1 g/t gold a

  22. Slide 22: GEO-01 Deposit Area: Main Zone

    GEO-01 DEPOSIT AREA: MAIN ZONE MRE: 120 KOZ OF GOLD – GROWTH EXPECTED1  Multiple significant zones of high-grade gold mineralisation just 3 to 6m of sand cover: rsonal use only  35m at 3.0 g/t gold from 20m in 24MYC0610, including:  16m at 5.6 g/t gold from 33m  50m at 2.3 g/t gold from 72m in 2

  23. Slide 23: New Rizzo-Fiama Extension

    GEO-01 DEPOSIT AREA: NEW RIZZO-FIAMA EXTENSION NEW GOLD ± COPPER DISCOVERY SOUTH OF RIZZO AND FIAMA1  Located 1.7km south of Minyari rsonal use only  Opens a large 1km metre by 700m target area hosting three ore horizons under less than 5m of cover  To date, limited, broad spaced CY2025 drilling

  24. Slide 24: Playing a Major Role in the Region's Resurgence

    PLAYING A MA JOR ROLE IN THE REGIONS RESURGENCE OUTSTANDING GOLD MINING MULTIPLE GROWTH EXCELLENT FINANCIAL rsonal use only LOCATION TARGETS FOUNDATION TIER-ONE GROUND PACKAGE PROXIMAL EXPLORATION PRESENTING SIZEABLE ROBUST CASH POSITION FUNDING TO THE TELFER MINE AND HAVIERON POTENTIAL FOR FURTHER

  25. Slide 25: Corporate

    Ajuo GORPORATE n yeuosia

  26. Slide 26: Excellent Financial Foundation and Clean Capital Structure

    EXCELLENT FINANCIAL FOUNDATION AND CLEAN CAPITAL STRUCTURE rsonal use only CAPITAL STRUCTURE | ASX: AZY SHARE REGISTER AND RESEARCH COVERAGE4 Share price1 A$0.51 18.3% Chester Asset Management Greatland Resources Shares on issue1 669M Jupiter Asset Management 38.9% 6.5% Lion Selection Group Market c

  27. Slide 27: Highly Experienced and Motivated Executive Team

    HIGHLY EXPERIENCED AND MOTIVATED EXECUTIVE TEAM rsonal use only Mark Rodda Roger Mason Neil Warburton Peter Buck Gary Johnson Stephen Power Luke Watson Executive Managing Non-Executive Non-Executive Non-Executive Non-Executive CFO and Company Chairperson Director and CEO Director Director Director D

  28. Slide 28: Committed to Social and Environmental Responsibility

    COMMITTED TO SOCIAL AND ENVIRONMENTAL RESPONSIBILITY rsonal use only CULTURAL HERITAGE REGIONAL ECONOMIC LOCAL COMMUNITY SOCIALLY INCLUSIVE PROTECTION DEVELOPMENT PARTNERSHIPS WORKPLACE COLLABORATING EXPLORATION ENGAGING LOCAL COMMITTED TO WITH TRADITIONAL INVESTMENT FOR PEOPLE AND WORKPLACE DIVERSI

  29. Slide 29: Appendix

    x (=) a Ww a. a. <x Ajuo asn jeuosia ANTIPAMINERALS

  30. Slide 30: Shallow Young Cover Across 3,840km2 Portfolio

    SHALLOW YOUNG COVER ACROSS A LARGE 3,840km2 PORTFOLIO1 rsonal use only APPROXIMATELY 40% OF ANTIPA TENEMENTS ARE UNDER LESS THAN 20 METRES OF COVER APPROXIMATELY 75% OF ANTIPA TENEMENTS ARE UNDER LESS THAN 80 METRES OF COVER 1. Telfer, Havieron and O’Callaghans refer to Greatland Resources Ltd ASX r

  31. Slide 31: Tim's Dome Eastern Region SW-NE Cross Section

    TIM’S DOME HIGH-GRADE GOLD±COPPER REEF TARGETS TIM’S DOME EASTERN REGION REEF TARGETS FIRMING UP – SW-NE CROSS SECTION LOCAL 28,315 NORTH rsonal use only AEM Conductivity Target INVESTOR PRESENTATION | 31

  32. Slide 32: Mollie Large-Scale Base Metal and Gold Target

    MOLLIE LARGE-SCALE BASE METAL AND GOLD TARGET NEW VERY LARGE-SCALE BASE METAL (INCLUDING TUNGSTEN + COPPER ) AND GOLD SKARN TARGET1  Mollie base ± tungsten and precious metal skarn target located 30km from Telfer rsonal use only  Shallow cover between 3 to 60m  Large-scale strong co-incident magn

  33. Slide 33: Minyari Project Mineral Resource Estimate

    MINYARI PROJECT MINERAL RESOURCE ESTIMATE rsonal use only 1. Rounding of numbers may cause apparent discrepancies in totals. 2. For full details of the Minyari Project Mineral Resources Estimate, please refer to ASX announcement dated 2 April 2026, “Minyari Project Resource Grows to 3.6 Moz Gold Equ

  34. Slide 34: Competent Persons Statements

    MINYARI PROJECT MINERAL RESOURCE ESTIMATE COMPETENT PERSONS STATEMENTS Competent Persons Statement – Exploration Results The information in this document that relates to Exploration Results is based on and fairly represents information and supporting documentation compiled by Mr Roger Mason, a Compe

  35. Slide 35: Competent Persons Statement Exploration Results

    COMPETENT PERSONS STATEMENT COMPETENT PERSONS STATEMENT EXPLORATION RESULTS Various information in this report which relates to Exploration Results have been extracted from the following announcements lodged on the ASX, where further details, including JORC Code reporting tables, can also be found:

  36. Slide 36: Top Australian Gold Projects: Reference Information

    TOP AUSTRALIAN GOLD PROJECTS TOP AUSTRALIAN GOLD PROJECTS: REFERENCE INFORMATION Project Company Contained Au Resource Grade Measured Indicated Inferred Stage Study Level Source (Moz) (g/t Au) Resources Resources Resources (completed) (Mt) (Mt) (Mt) rsonal use only Minyari1,2 Antipa 2.9 1.33 0.0 42.

  37. Slide 37: Scoping Study Detail

    > CSTAND-ALONE MINYARI (OME GOLD-COPPER VELOPMENT PROJECT SCOPING STUDY DETAIL ersonal u

  38. Slide 38: Project Summary: Base Case Highlights

    PROJECT SUMMARY: BASE CASE HIGHLIGHTS1 MINE SCHEDULE MINING PHYSICALS STANDARD CIL PLANT rsonal use only 30.2 Mt at 1.5 g/t Au 3 Mtpa throughput 90% gold recovery Initial open pit and underground mine For 10+ years initial processing life Simple non-refractory metallurgy INITIAL GOLD OUTPUT FORECAST

  39. Slide 39: Base Case Sensitivity Analysis

    PROJECT SUMMARY: BASE CASE SENSITIVITY ANALYSIS NPV SENSITIVITY ANALYSIS (PRE-TAX, A$3,000/oz AU)1 PROJECT PROVIDES TREMENDOUS GOLD PRICE UPSIDE1 rsonal use only NPV7% UoM Base Mid-2025 Feb-2026 A$834M Gold price assumption A$/oz 3,000 4,0002 5,0003 NPV7% (pre-tax) A$M 834 1,696 2,557 Gold Price ± 3

  40. Slide 40: Thank You

    ANTIPAMINERALS ANK YOU ersonal us¢ only

Antipa Minerals — Precious Metals Summit Zurich (November 2026) on 6ix