  1. Slide 1: Exploring the Yerecoin Project in the Jimperding Metamorphic Belt

    Exploring the Yerecoin Project in the Jimperding Metamorphic Belt Western Australia ASX: BUR June 2021 1

  2. Slide 2: Disclaimer and Important Information

    Disclaimer and Important Information The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue, securities or other financial products. The information contained in this presentation is not investment or financial

  3. Slide 3: Burley Kicking Goals for IPO

    BURLEY KICKING GOALS FOR IPO Burley Minerals Ltd incorporated 29 Oct 2020 Option secured to acquire 70% of Novarange Pty Ltd (owner of the Yerecoin Project, located 2 hours drive NE from Perth, WA IRON ORE RESOURCES • JORC 2012 compliant magnetite resources • 247 Mt @ 29.9% Fe (68.1% Fe conc grade,

  4. Slide 4: Board and Management

    BOARD AND MANAGEMENT BRYAN DIXON BCom CAANZ AGIA ACG Non-Executive Chairman Mr Dixon has over 20 years’ experience in the mining and exploration sector. Mr Dixon is a Chartered Accountant and Chartered Secretary and has extensive experience in the management of public and listed companies. Mr Dixon

  5. Slide 5: Capital Structure & Key Information

    CAPITAL STRUCTURE & KEY INFORMATION Pro forma capital structure Offer price per Share $0.20 Shares offered for subscription 30,000,000 Total Shares on issue as at the date of Prospectus 11,000,001 Maximum Number of Shares to be issued to Vendors under Acquisition Agreement at 20,500,000 Completion T

  6. Slide 6: Location & Infrastructure

    LOCATION & INFRASTRUCTURE LOCATION • 120km NNE of Perth via Great Northern Highway • Excellent road access throughout Project area POWER • High Voltage power transmission lines • 132kV and 330kV • Dampier – Bunbury Natural Gas Pipeline (DBNGP) TRANSPORT • Tier 2 railway (Toodyay-Miling line) • Conne

  7. Slide 7: Project History

    PROJECT HISTORY Magnetite resources 2009: Maiden drilling program completed by Giralia Resources NL • RC, diamond drilling: Yerecoin Main, Yerecoin South • Maiden Resource estimate 2010-2011: Giralia continues RC and diamond drilling 2011: Atlas Iron Ltd takeover of Giralia. 2012: Gunnel JV formed (

  8. Slide 8: Yerecoin Magnetite Resources

    YERECOIN MAGNETITE RESOURCES Resource Resource Tonnes DTR In-situ Fe Conc Fe Al2O3 SiO2 P S Area Category Mt % % % % % % % MAIN 1 Indicated 31.0 37.4 31.4 67.7 0.15 6.01 0.01 0.03 Inferred 99.8 35.1 29.6 68.4 0.2 5.40 0.01 0.04 Sub-Total 130.8 35.7 29.7 68.0 0.18 5.95 0.01 0.03 SOUTH 2 Inferred 115.

  9. Slide 9: Exploration Targets

    EXPLORATION TARGETS Iron Ore GROSSKOPF EXPLORATION TARGET Current drilling of western limb of Yerecoin Main resource ends at northern boundary of ‘Grosskopf’ property OTHER MAGNETITE EXPLORATION TARGETS Linear Magnetic high between Grosskopf Target and Yerecoin South has not been drill tested – pote

  10. Slide 10: Exploration Targets

    EXPLORATION TARGETS Summary IRON ORE • Immediate potential to extend and upgrade magnetite resources at Yerecoin Main & Yerecoin South • Potential for discovery of additional magnetite resources Ni-Cu-Co-PGE • Historical drilling at Yerecoin South magnetite deposit intercepted abundant serpentinised

  11. Slide 11: Ni-Cu-Co-PGE Target

    Ni-Cu-Co-PGE TARGET • Potential for Ni-Cu-Co-PGE mineralisation in ultramafic host rocks • ~60km north of Chalice Mining’s Gonneville PGE-Ni-Cu-Co-Au discovery – currently increasing in size and extent. • This Region has had limited exploration in recent times for this style of mineralisation, even

  12. Slide 12: Yerecoin South

    YERECOIN SOUTH Ni-Cu-Co-PGE Potential • airborne VTEMTM MAX survey completed in March 2021. • Data with geophysics consultants for processing and interpretation • Results and potential EM drill targets anticipated post IPO Cross-section 6566625mN – ultramafic units intercepted adjacent to, & beneath

  13. Slide 13: Burley Minerals First Steps

    MAGNETITE IRON ORE → FEASIBILITY STUDIES BURLEY • Resource Drilling – infill & extension drilling to increase & upgrade Magnetite Iron Resources to +Indicated status MINERALS • Exploration Drilling – first pass drilling of Grosskopf target • Testwork – metallurgy, geotechnical • Process – define opt

  14. Slide 14: Burley Investment Summary

    BURLEY INVESTMENT MAGNETITE IRON ORE SUMMARY Fast track FEASIBILITY → DEVELOPMENT → PRODUCTION ✓ Indicated & Inferred Mineral Resource 247Mt @ 30% Fe (32% DTR – 68% Fe concentrate grade) ✓ Coarse-grained, low impurity content, favourable processing characteristics ✓ Near term readiness for Prelimina

  15. Slide 15: Airborne VTEM survey at Yerecoin Project

    Airborne VTEM survey at Yerecoin Project

  16. Slide 16: Appendix - Excellent Location & Infrastructure

    APPENDIX EXCELLENT LOCATION & INFRASTRUCTURE Core yard Gt Northern Hwy Calingiri rail crossing 16 Tier 2 rail network Kwinana Bulk Terminal

  17. Slide 17: Appendix - Yerecoin Project Acquisition Agreement

    APPENDIX - Yerecoin Project Acquisition Agreement see Prospectus Section 14.3 and 14.4 for summary of key terms • Agreement dated 27 April 2021, Burley has secured a binding option to acquire 70% of the issued capital of Novarange (Sale Interest) which owns 100% of the Yerecoin Project near New Norc

  18. Slide 18: Appendix - Yerecoin Project Acquisition Agreement

    APPENDIX - Yerecoin Project Acquisition Agreement see Prospectus Section 14.3 and 14.4 for summary of key terms Vendor Deferred Payments and Potential Performance Shares • Following Novarange Acquisition Completion, Burley is liable to the Vendors for the following deferred consideration (up to $4,5