  1. Slide 1: Company Presentation

    Company Presentation February 2026 www.sundaenergy.com

  2. Slide 2: Important Notice & Disclaimer

    Important Notice & Disclaimer The information contained in this document (“Presentation”) has been prepared by Sunda Energy plc (the depend on circumstances that may or may not occur in the future. These forward-looking statements “Company”). The Company is a UK company quoted on AIM, a market opera

  3. Slide 3: Introducing Sunda Energy Plc (SNDA.L) and its gas strategy

    Introducing Sunda Energy Plc (SNDA.L) and its gas strategy Sunda Energy is an independent Vietnam E&P with a focus on gas in SE Asia Thailand Sunda Energy and SE Asia Cambodia ✓ Robust energy demand growth Philippines ✓ Strong government alignment ✓ Material anchor asset in Chuditch Brunei SC 80 ✓ H

  4. Slide 4: Introductions: Sunda Energy Board

    Introductions: Sunda Energy Board Dr Andy Butler Gerry Aherne CHIEF EXECUTIVE OFFICER / DIRECTOR INDEPENDENT NON-EXECUTIVE CHAIRMAN >30 years’ experience as petroleum geologist and Extensive experience in insurance and financial markets. company founder/director. Lived in SE Asia since 2010. Formerl

  5. Slide 5: Sunda Energy Investment Highlights

    Sunda Energy Investment Highlights Focus on value creation by developing a diversified asset portfolio strategically located for Asian energy markets ➢ Timor-Leste: Pursuing rig to drill Chuditch appraisal well ➢ Philippines: Low-cost maturation of high impact exploration assets, with significant fa

  6. Slide 6: Sunda's Current and Targeted E&P Portfolio

    Sunda’s Current and Targeted E&P Portfolio Building a sustainable portfolio to underpin valuation and as a platform for growth Exploration and Development Production Appraisal Philippines Sulu Sea Chuditch New Business ▪ >10 Tcf prospective gas ▪ 1.2 Tcf Pmean gas ▪ Several acquisitions under Pmean

  7. Slide 7: SE Asia Energy Demand and the Role of Gas

    SE Asia Energy Demand and the Role of Gas New and existing coal-fired power plants SE Asia fuel for electricity generation PJ SE Asia expectations: ✓ GDP of major SE Asia economies to grow >3x by 2050 ✓ 186% increase expected in gas demand by 2050 ✓ By 2050, 40% of SE Asia’s power generation from ga

  8. Slide 8: Timor-Leste: Alignment based on need for development

    Timor-Leste: Alignment based on need for development Briefing with ▪ Young, democratic republic, with H.E. President José Ramos- major development challenges Horta, London, April 2025 ▪ Economy has been dependent on gas revenues and Petroleum Fund >80% GDP since independence from Bayu Undan 83% of 2

  9. Slide 9: Timor Sea gas fields, key players and infrastructure

    Timor Sea gas fields, key players and infrastructure Timor-Leste Gas Assets Appraisal: Chuditch (Sunda): ✓ Now Timor-Leste’s 2 largest field, appraisal planned nd Late-Life Production: Bayu Undan (Santos): ✓ Ceased production, some resources remain TL-SO-22-23 PSC Pre-Development: Sunrise (Woodside)

  10. Slide 10: Chuditch: A Material National Gas Asset

    Chuditch: A Material National Gas Asset PSC TL-SO-19-16 Working Interests: ✓ Sunda 60% (operator), TIMOR GAP 40% Highlights ✓ Chuditch gas field discovered by Shell in 1998 ✓ 64m water depth, gas encountered at 2,890m subsea ✓ Reprocessed 3D seismic images field for first time ✓ Significant Discover

  11. Slide 11: Plan to drill and test the Chuditch-2 well

    Plan to drill and test the Chuditch-2 well ✓ Appraisal well to be drilled 5.1 km East Northeast from discovery, in 68m water ✓ 149m gas column expected (versus 30m gas column encountered at Chuditch-1) ✓ Flow test to determine potential gas production rates for development plan Depth to Top Plover R

  12. Slide 12: Export Concept: Pipeline via Bayu Undan to Timor-Leste LNG

    Export Concept: Pipeline via Bayu Undan to Timor-Leste LNG ✓ MOU signed with Ministry and TIMOR GAP, Dec 2024 ✓ Facilities Feasibility Study completed June 2025 Timor-Leste LNG ✓ Simple phased development ✓ Gas export via pipeline to Bayu Undan, then to LNG facility on Timor-Leste ✓ Long term produc

  13. Slide 13: Philippines: New Country Entry, Robust Energy Demand

    Philippines: New Country Entry, Robust Energy Demand ✓ Two blocks awarded in Philippines, October 2025 ✓ Philippines has a growing population and economy and significant energy demand growth ✓ Government implementing various incentives to encourage development of indigenous gas resources Gas SC-80 a

  14. Slide 14: Circum-Borneo: Regional Gas Playground for Majors and NOCs

    Circum-Borneo: Regional Gas Playground for Majors and NOCs Borneo island and adjacent basins1 USGS (2020) estimate up to 173 Tcf gas and 6 Bn bbls oil of PHILIPPINES undiscovered resources in the Borneo and Philippine provinces2 Layang-Layang Basin The gas exploration & development trend around Born

  15. Slide 15: Philippines Sulu Sea: High Impact Exploration Fairway

    Philippines Sulu Sea: High Impact Exploration Fairway ✓ SC-80 and SC-81 cover >13,000 km2 of prospective area ✓ SC-80 area previously operated by Sunda team, discovered Dabakan and Palendag with ExxonMobil ✓ Considerable upside gas potential identified with scale attractive to major E&P players Afte

  16. Slide 16: Sunda Energy Summary

    Sunda Energy Summary Sunda Energy is applying its experience and expertise to maturing gas resources for delivery to Asia-Pacific energy markets ✓ Experienced leadership team and board ✓ Quality pre-development asset in Timor-Leste ✓ High impact exploration fairway in Philippines ✓ Meaningful produc

  17. Slide 17: Thank You

    Thank You Contact Information UK Executive Office: Registered Office: Strategic Communications PO Box 404 201 Temple Chambers Advisor: Hastings, TN34 9LF 3-7 Temple Avenue Celicourt Communications United Kingdom London, EC4Y 0DT Email: [email protected] United Kingdom T: +44 (0) 20 7770 6424 16

  18. Slide 18: Glossary

    Glossary Term Definition Denotes the low estimate qualifying as Contingent Resources. Reflects a volume estimate that there is a 90% probability that the quantities actually recovered will equal 1C or exceed the estimate Denotes the low estimate qualifying as Prospective Resources. Reflects a volume