Barton Gold Holdings Limited · ASX:BGD
Barton Gold — Gold Coast Gold Conference 2026
20 slides from Barton Gold's conference presentation, Mar 25, 2026
Slide 1: South Australia's 2.25 Moz Gold Developer
For personal use only ASX:BGD FRA:BGD3 OTCQB:BGDFF South Australia’s 2.25 Moz Gold Developer 25 March 2026 | Gold Coast Gold Conference Perseverance Mine, Tarcoola Project
Slide 2: Important Notices
Important Notices Please refer to appendices for details of all references contained throughout this presentation. For personal use only Disclaimer This document has been approved by the Board of Barton Gold Holdings Limited (ACN 633 442 618) (together with its affiliates, “Barton” or the “Company”)
Slide 3: 2.25 Moz SA Developer: Strategic first mover
2.25 Moz SA Developer Strategic ‘first mover’ with permitted infrastructure in a proven gold district Leading the re-emergence of central South Australian gold For personal use only • Strategy to consolidate region and develop large-scale production • Ownership of region’s only gold mill provides st
Slide 4: Capital Structure
Capital Structure Strong funding position with register consolidating around aligned management and reliable progress ($AUD) Share Distribution (6) Shares on issue (1) 239 million Board & Management For personal use only Market Cap ($0.86 / share) (2) $204 million 21% 27% Institutional & Corporate D
Slide 5: Experienced Leadership
Experienced Leadership Strong SA and gold pedigree Board of Directors Senior Management For personal use only Ken Williams | Non-Executive Chair Alexander Scanlon | Managing Director & CEO • ~30 years in mining, aviation & financial services • ~20 years in principal investments & resources • Former
Slide 6: Australia's next district player: hub and spoke model
Australia’s next district player: hub and spoke model District Leader for long-term gold leadership in central Gawler Craton Darwin Rail Challenger Peak Iron | Peculiar Knob CGM | 313koz Au BHP | Prominent Hill Stage 1: Restart CGM operations Cu-Au-Ag For personal use only Peak Iron | Buzzard • Ex
Slide 7: CGM 'Stage 1'
CGM ‘Stage 1’ Building blocks are now in place for low-cost, low-risk transition to operations → commercialization now in focus Established infrastructure (1) For personal use only • Fully permitted mill and Mining Leases • 600ktpa design throughput (fresh ore) • Strong historical gold recoveries of
Slide 8: CGM TSF1 Reprocessing
CGM TSF1 Reprocessing Coarse, higher-grade tailings offer low- cost startup, attractive early cashflow (1) Simple metallurgy For personal use only • Clean gold / silver • Low impurities Attractive profile • 3.2Mt @ 0.54g/t Au (1) • Coarse P80 = 225μm (2) • Outer ring grading 0.7–1.0g/t Au (1,2) Mult
Slide 9: Tunkillia 'Stage 2' Platform
Tunkillia ‘Stage 2’ Platform Excellent metrics driven by scale efficiencies, high-value ‘Starter Pit’ May 2025 Optimised Scoping Study (OSS) outcomes: (1) Based upon A$5,000/oz Au and A$50/oz Ag revenue assumptions For personal use only ~5 Mtpa 121kozpa 259kozpa A$2,222 A$2,829 x 8 years payable Au
Slide 10: Tunkillia MRE Geometry
Tunkillia MRE Geometry Attractive characteristics with shallow, higher-grade central ‘Starter Pit’ zone ➢ ~80% of MRE tonnes & gold ounces within 200m of surface (1) For personal use only ➢ ~300m long higher-grade core = valuable initial ‘Starter Pit’ (1) ➢ +200koz Au in shallow (~35m deep) oxide /
Slide 11: Tunkillia Rapid Payback
Tunkillia Rapid Payback High value ‘Starter Pits’ drive early return of capital, underwrite financing profile High value ‘Starter Pits’ (1) Assuming A$5,000/oz Au and A$50/oz Ag for revenue: (1) For personal use only • ‘S1’ yields 206koz Au, 491koz Ag and A$825m cash in ~13 months, paying back capex
Slide 12: Wudinna Regional Leverage
Wudinna Regional Leverage Multiple enhancement options for BGD’s regional platforms Advanced platform, growth potential For personal use only • JORC 279koz Au (5.81Mt @ 1.5 g/t Au) (1) • Deposits open to depth / strike extensions Pt Augusta Wudinna • Multiple untested exploration targets 279koz Au I
Slide 13: Tarcoola Emerging Platform
Tarcoola Emerging Platform Hunting high-grade blending feed for CGM & Tunkillia Mill Historical high-grade goldfield Darwin Rail For personal use only • 1893 gold rush (~1893 – 1950) with over 600 historical workings across ML (1) • Perseverance open pit mine (20koz Au) sent ore → CGM during 2017
Slide 14: Tolmer Silver Discovery
Tolmer Silver Discovery ‘Western silver’ and ‘eastern gold’ zones now cover ~1.5km footprint (5) For personal use only Source 5 ▪ Significant high-grade, silver dominant mineralisation ▪ ‘Western silver zone’ discovery hole: 6m @ 4,747 g/t Ag across newly discovered ~1.5km wide mineral footprint fro
Slide 15: Key Targets
Perseverance Mine, Tarcoola Project Key Targets Accelerating ‘Stage 1’ operations and large-scale ‘Stage 2’ growth Stage 1│Central Gawler Mill CY 2025 CY 2026 For personal use only Definitive Feasibility studies FEED and procurement Start of site works Stage 2│Tunkillia development Environmental Sco
Slide 16: Summary
Summary Platform + performance = Value Strategic platform including fully-permitted infrastructure For personal use only Advancing consistently with near-term ‘Stage 1’ operations Well capitalised with fully aligned, experienced leadership Multiple catalysts and frequent news Accessible in AUD, USD
Slide 17: Contact
Contact Barton Gold Level 4, 12 Gilles Street For personal use only Adelaide SA 5000 [email protected] www.bartongold.com.au Alexander Scanlon Managing Director & CEO [email protected] +61 425 226 649 Jade Cook Company Secretary [email protected] +61 8 9322 1587 17
Slide 18: JORC (2012) Mineral Resources
JORC (2012) Mineral Resources (1) (1)Tables show the complete JORC MRE for each Project. Figures are subject to rounding, tonnages are dry-metric tonnes, and all Mineral Resources classified as ‘Inferred’ are approximate. Gold cut-off grades applied are: For personal use only Tunkillia • 0.3 g/t Au
Slide 19: Competent Persons Statements
Competent Persons Statements The information relating to Exploration Results and Mineral Resources in this presentation is extracted from the Company’s Prospectus dated 14 May 2021 (Prospectus) and Barton ASX announcements as cross-referenced in the body of this presentation. A copy of the Prospectu
Slide 20: References
References Slide 4 (Capital Structure) Slide 11 (Tunkillia Rapid Payback) 1 Refer to ASX announcement dated 28 January 2026 1 Refer to ASX announcement dated 5 May 2025 2 As at market close on 20 March 2026 2 Excluding pre-strip, net of Ag by-product credit 3 As at 31 December 2025 (refer to ASX ann
Barton Gold Holdings — Gold Coast Gold Conference 2026 on 6ix