Glencore Plc · LSE:GLEN

Glencore — H1 2020 Earnings Presentation

33 slides from Glencore's earnings presentation, Aug 6, 2020

  1. Slide 1: 2020 Half-Year Results

    2020 Half-Year Results 6 August 2020

  2. Slide 2: Important notice concerning this document including forward looking statements

    1 Important notice concerning this document including forward looking statements This document contains statements that are, or may be deemed to be, “forward looking statements” which are prospective in nature. These forward looking statements may be identified by the use of forward looking terminol

  3. Slide 3: Highlights

    2 Highlights Ivan Glasenberg – Chief Executive Officer 2020 Half-Year Results

  4. Slide 4: 2020 Half-Year Scorecard

    2020 Half-Year Scorecard 3 Strong performance in challenging conditions Resilient cash generation … • Group Adjusted EBITDA(1) of $4.8bn, down 13% in line with lower prices and some Covid-19 production/cost impacts, offset by a strong marketing performance • Cash generated by operating activities be

  5. Slide 5: Safety performance

    Safety performance 4 • We are progressing with an enhanced group- wide fatality reduction program seeking to deliver a step-change in safety performance • Identifying and targeting areas of underperformance with clear plans and structures to deliver safe work places • Ensuring SafeWork is fully impl

  6. Slide 6: Our commitment to the transition to a low-carbon economy

    Our commitment to the transition to a low-carbon economy 5 Aligning our business with a Paris compliant pathway(1) Our diversified portfolio of metals and minerals is 2019 Peer Scope 3 emissions (Million tonnes CO2-e)(2) well positioned to support the transition to a low- 600 carbon economy • We are

  7. Slide 7: 2020 Half-Year financial performance

    2020 Half-Year financial performance Steven Kalmin – Chief Financial Officer 2020 Half-Year Results

  8. Slide 8: 2020 First-half financial scorecard

    2020 First-half financial scorecard 7 Resilient financial performance Adjusted EBITDA ($)(1) Industrial Adj. EBITDA ($) Marketing Adj. EBIT ($) 4.8bn -13% y/y, reflecting lower commodity prices 2.6bn -42%, primarily driven by lower y/y 2.0bn +108% y/y, in line with volatile and and some Covid-19 pro

  9. Slide 9: Industrial 2020 Half-Year Adjusted EBITDA: $2.6bn

    Industrial 8 2020 Half-Year Adjusted EBITDA: $2.6bn Weaker pricing environment Industrial Adjusted EBITDA • Adjusted EBITDA down 42% to $2.6bn • Industrial assets primarily impacted by lower commodity $4.5bn EBITDA mining margins prices and some Covid-19 related volume and cost 2.1 impacts, partiall

  10. Slide 10: Industrial Adjusted EBITDA bridge

    Industrial 9 Adjusted EBITDA bridge Variance 2020 Half-Year vs 2019 Half-Year ($ million) 2,069 Volume: 4,499 Reflects Covid-19 Metals: 832 impacts at Antamina, Colombian coal and Ferroalloys, FX: Energy: 1237 plus expected lower Mainly: grades at AUD +c.$160M Antapaccay 136 ZAR +c.$160M 423 2,618 P

  11. Slide 11: Industrial Copper scorecard

    Industrial 10 Copper scorecard Resilient copper performance, H1 y/y H1 2020 aided by turnaround at Operating 2020 Chg 2019 Guidance Katanga Production (kt) 588 -11.3% 663 1255 ± 35 Production 11% lower y/y, mainly Mine costs (c/lb)(1) 109 -27.3% 150 106 reflecting C+M of Mutanda (H2 19), Realised pr

  12. Slide 12: Industrial Zinc scorecard

    Industrial 11 Zinc scorecard Lower zinc results in line with H1 y/y H1 2020 weaker prices and Covid-19 Operating 2020 Chg 2019 Guidance operational impacts Production (kt) 550.1 2.6% 535.9 1160 ± 30 Production up y/y, but below initial Mine costs (c/lb) 28 n.m. 2.3 5 guidance mainly due to Covid-19

  13. Slide 13: Industrial Nickel scorecard

    Industrial 12 Nickel scorecard Lower unit costs drive H1 y/y H1 2020 stronger nickel earnings Operating 2020 Chg 2019 Guidance Production (kt) 55.2 -0.4% 55.4 114 ± 4 Steady y/y production, but Koniambo ramp-up impacted by Covid-19 Mine costs (c/lb) 395 -13.9% 459 413 delays to mobility of maintenan

  14. Slide 14: Industrial Coal scorecard

    Industrial 13 Coal scorecard Coal significantly impacted by H1 y/y H1 2020 Covid-19 effects on economic Operating 2020 Chg 2019 Guidance activity and energy demand Production (Mt) 58.1 -15% 68.2 114 ± 3 Production 10.1Mt lower y/y, with Thermal FOB cost ($/t) 46.2 0.4% 46.0 46.4 Covid-19 particularl

  15. Slide 15: Marketing 2020 Half-Year Adjusted EBIT: $2.0bn

    Marketing 14 2020 Half-Year Adjusted EBIT: $2.0bn Record first-half Adjusted EBIT of $2.0bn, up 108% y/y, Marketing Adjusted EBIT ($bn) as oil, in particular, benefitted from the volatile and structurally supportive market conditions $2.0bn 3.5 118(1) 3.2 Metals and Minerals Adjusted EBIT +127% 1266

  16. Slide 16: Capex

    Capex 15 H1 2020 net cash PP&E: $1.7bn H1 2020 Net cash capex ($M) H1 2020 Industrial sustaining capex • $1.3bn 2020 Half Year Marketing capex (mostly H1 2020 Industrial expansionary capex leases) • $0.5bn H1 2020 Net purchase and sale of property, plant and Sale of PP&E equipment • $1.7bn net capex

  17. Slide 17: Balance sheet

    Balance sheet 16 Net debt temporarily higher Net debt temporarily $2.8bn(1) above our target $16bn cap, Net funding ($) Net debt ($) reflecting: • Oil working capital reset in a significantly lower oil price and demand environment – significant reduction in net oil 36.4bn +6% vs year end 2019; 19.7b

  18. Slide 18: Capital allocation

    Capital allocation 17 Balancing shareholder returns, capital structure and growth H1 2020 Capital allocation H1 2020 capital allocation - cash ($bn) Funds from Growth/Reinvestment operations Non-RMI Net working capital • $1.7bn – Net capex cash flow +3.7 movement Non-RMI working capital Cash • $3.1b

  19. Slide 19: 2020 Modelling guidance

    2020 Modelling guidance 2020 Half-Year Results

  20. Slide 20: 2020 unit cash costs/margins

    2020 unit cash costs/margins 19 Key commodities Copper Zinc Nickel Coal Production: 1.26Mt ± 35kt Production: 1.16Mt ± 30kt Production: 114kt ± 4kt Production: 114Mt ± 3Mt Unit costs: 106 ¢/lb(1) Unit costs: 5 ¢/lb (48 ¢/lb ex Au) Unit costs: 413 ¢/lb Unit costs: Thermal FOB cash Unit costs ex-Konia

  21. Slide 21: Production Update 2020 guidance

    Production Update 20 2020 guidance Group guidance – own source(1) Actual Current Previous Q1 Q2 ROY H1 guidance guidance 2020 2020 2020 2020 2020 2020 Copper kt 293 295 588 667 ± 35 1,255 ± 35 1,255 ± 45 Cobalt kt 6 8 14 14 ± 2 28 ± 2 28 ± 2 Zinc(2) kt 296 255 550 610 ± 30 1,160 ± 30 1,160 ± 30 Nick

  22. Slide 22: Illustrative "spot" annualised cashflows

    Illustrative “spot” annualised cashflows 21 Basis: Current 2020 production guidance and late July spot commodities/FX Group $bn Copper(5) Guidance Zinc(6) Guidance Copper EBITDA 4.1 Total copper production (kt) 1255 Total production (kt) 1160 Cu from other depts (kt) -110 Zn from Cu department (kt)

  23. Slide 23: Our priorities

    Our priorities 2020 Half-Year Results

  24. Slide 24: Our 2020 priorities

    Our 2020 priorities 23 Operating Ramp-up / Strong Health & efficiency & development balance Management Confidence safety Capital assets sheet discipline • Deliver a step- • Deliver Katanga • Deliver guided • Commitment to • Transition to • Stability and change in safety 2020 guidance of operational

  25. Slide 25: Q&A

    Q&A 2020 Half-Year Results

  26. Slide 26: Appendix

    Appendix 2020 Half-Year Results

  27. Slide 27: 2020 Half-Year Industrial mine costs/margin reconciliation

    2020 Half-Year Industrial mine costs/margin reconciliation 26 H1 2020 H1 2020 H1 2020 H1 2020 (1) (1) Copper Guidance Actual Zinc Guidance Actual Total copper production (kt) - (FY 1255*48%) 602 588 Total production (kt) - (FY 1160*50%) 580.0 550.1 Cu from other depts (kt) - (110*50%) -55 -49 Zn fro

  28. Slide 28: 2020 key EBITDA sensitivities

    2020 key EBITDA sensitivities 27 Approximate estimated impact on H2 EBITDA of a 10% change: $M Copper price 400 Australian export thermal coal price 90 Australian hard coking coal price 45 Zinc price 120 Cobalt price 50 Nickel 70 AUD vs USD 330 ZAR vs USD 60 CAD vs USD 65 CLP vs USD 30 2020 Half-Yea

  29. Slide 29: Future growth options

    Future growth options 28 Significant pipeline of internal brownfield and greenfield growth options for when markets inevitably require these commodities Cu Co Zn Coroccohuayco: Peru Mutanda sulphides: DRC Volcan projects: Peru Argent: South Africa El Pachon: Argentina Obruchevskoye: Kazakhstan Nooit

  30. Slide 30: Listed entity market valuations and selection of other entities

    Listed entity market valuations and selection of other entities 29 Listed entities % owned Market value $M Russneft 25.0% 490 EN+ 10.6% 681 Volcan 23.3%(1) 374 Rosneft 0.6% 291 Century 47.4% 330 Yancoal 6.8% 133 Other(2) Various 197 Total 2496 Selection of other entities US oil infrastructure BaseCo

  31. Slide 31: Debt maturity profile – capital market notes

    Debt maturity profile – capital market notes 30 $22.3bn as at 30 June 2020(1) 10.0 10.2 8.0 6.0 Managing annual debt 4.0 maturities to around $3bn 2.0 0.0 Liquidity @ 2020 2021 2022 2023 2024 2025 2026 2027 post 2027 30.06.2020 USD EUR GBP CHF JPY 2020 Half-Year Results Notes: (1) Note 20, Pages 76

  32. Slide 32: Glencore Technology: Technology solutions for our industry

    Technology solutions for our industry 31 Glencore has been leading industry technology for decades: Primus, CTSCo, Onaping Depth electric mine GLENCORE TECHNOLOGY • Global leader in metals and minerals processing technology for • Team of world-class more than 30 years metallurgists, engineers, • Sup

  33. Slide 33: GLENCORE =

    GLENCORE = Y OM feo > |