Parth Electricals & Engineering Limited · NSE:PARTH

Parth Electricals & Engineering — H1 FY27 Earnings Presentation

27 slides from Parth Electricals & Engineering's earnings presentation, Nov 2, 2026

  1. Slide 1: Submission letter to NSE under Regulation 30

    Date: 02nd November, 2026 To, National Stock Exchange of India Limited, Exchange Plaza, C-1, Block G, Bandra Kurla Complex, Bandra (E) Mumbai – 400051 NSE Symbol: PARTH Subject: Submission of Investor Presentation Under Regulation 30 of SEBI (Listing Obligations and Disclosure Requirements), Regulat

  2. Slide 2: H1 FY27 Earnings Presentation

    Parth Electricals & Engineering Ltd. H1 FY27 Earnings Presentation November 2026 A renowned manufacturer and service provider in the electrical power transmission & distribution space, with in-house R&D and design capabilities. OUR PRODUCTS Watch the corporate video Watch corporate video RMU CSS / P

  3. Slide 3: Safe Harbour Statement

    DISCLAIMER Safe Harbour Statement This presentation and the accompanying slides (the “Presentation”), which have Certain matters discussed in this Presentation may contain statements regarding been prepared by Parth Electricals & Engineering Limited (the “Company”), have the Company’s market opportu

  4. Slide 4: Contents

    AGENDA Contents 01 02 03 Industry Growth Drivers Business Overview & Management Products & Manufacturing Policy push, rising power demand, clean Business overview, order book, Executive Products, Marquee projects, Clients & Facility energy and data centres Leadership and team 04 05 Update on CapEx F

  5. Slide 5: Data Centres: The New Grid-Scale Customer

    INDUSTRY GROWTH DRIVERS · DATA CENTRES Data Centres: The New Grid-Scale Customer Each AI campus is a mini-utility: HV intake, MV distribution and full redundancy INDIA DATA -CENTR E CAPACITY B Y 2030 40–45% ₹60–70 Cr 3.4–6.5 GW Share of data-centre capex spent on electrical systems: the largest cost

  6. Slide 6: Renewables, Storage & the Grid Build-Out

    INDUSTRY GROWTH DRIVERS · ENERGY TRANSITION Renewables, Storage & the Grid Build-Out Every GW of solar, wind, storage or hydrogen needs switchgear to connect, protect and evacuate it RENEWAB L E S B ATTERY STORAGE TRANSM ISSI O N 300 GW ~11× ₹9.15 lakh Cr Non-fossil capacity (Jul 2026), 54% of total

  7. Slide 7: Business Overview

    BUSINESS OVERVIEW Business Overview Manufacturing & Supply Services & EPC • Ring Main Units (11kV–33kV) under technology transfer with Schneider Electric • Installation, testing & commissioning of substations and power cables (specialised SAS, France services from 415V to 220kV) • Compact / Package

  8. Slide 8: Order Book Visibility

    ORDER BOOK Order Book Visibility STRONG ORDER BOOK ORDER BOOK MIX ₹470 Cr Manufacturing Order 48.7% 25.7% Service Order EPC Order 25.6% Manufacturing, service and EPC orders on hand ₹228.67 Cr ₹120.79 Cr ₹120.14 Cr Manufacturing & Supply ₹228.67 Cr Services & EPC ₹240.93 Cr • 2000+ RMU orders under

  9. Slide 9: Executive Directors

    LEADERSHIP Executive Directors Mr. Jignesh Patel Mrs. Jemini Patel Managing Director Whole Time Director • Graduated from BVM Engineering College, SP University, with a • Science graduate who has worked in Parth Electricals since inception Bachelor of Engineering (B.E.) in electrical engineering tec

  10. Slide 10: Our Core Team

    MANAGEMENT Our Core Team Led by Mr. Jignesh Patel, Managing Director, and Mrs. Jemini Patel, Whole Time Director Mr. Darshan Shukla 33 Mr. Sanjay Patel 22 Mr. Pankaj Nayak 23 Mr. Dipesh Kamothi 18 Technical Director yrs exp. Works Manager yrs exp. Head, Projects yrs exp. Head, Services yrs exp. Ms.

  11. Slide 11: Our Manufactured Products

    PRODUCT PORTFOLIO Our Manufactured Products RMU MV Panels LT Panels Control & Relay Panels Smart RMU PSS CSS Earth Link Boxes Parth Electricals & Engineering Ltd. | H1 FY27 Earnings Presentation 10

  12. Slide 12: Our New Products: 33kV RMU and Gas Insulated Switchgear

    NEW PRODUCT DEVELOPMENT Our New Products: 33kV RMU and Gas Insulated Switchgear 33kV Ring Main Unit (RMU) Gas Insulated Switchgear (GIS) Parth Electricals & Engineering Ltd. | H1 FY27 Earnings Presentation 11

  13. Slide 13: 33kV GIS and RMU: From Development to Market

    NEW PRODUCT DEVELOPMENT 33kV GIS and RMU: From Development to Market Infrastructure & Product Portfolio 1 Completed Development 2 Final type testing 50% complete 33kV Gas Insulated Switchgear & Ring After Nov 2026 Main Unit 3 Roll-out from Vadodara plant inauguration Premium, technology-driven produ

  14. Slide 14: Marquee Projects in the USA and India

    EXPORTS & PRESTIGIOUS PROJECTS Marquee Projects in the USA and India USA · EXPORT • All payments fully realised Intelligent Motor Control • Additional scope order under Center (iMCC) finalization • Raised profile in the US market; high-value inquiries in pipeline 100% executed USA · NEW ORDER INDIA

  15. Slide 15: Our Valued Clients

    CLIENTS Our Valued Clients All client logos are for illustrative purposes only and remain the property of their respective owners. Parth Electricals & Engineering Ltd. | H1 FY27 Earnings Presentation 14

  16. Slide 16: Manjusar, Vadodara: Manufacturing Facility

    MANUFACTURING FACILITY · UNIT 1 Manjusar, Vadodara: Manufacturing Facility Parth Electricals & Engineering Ltd. | H1 FY27 Earnings Presentation 15

  17. Slide 17: Skill Development Centre: A Day-One Ready Workforce

    HUMAN CAPITAL & SKILL DEVELOPMENT ( CapEx completed) Skill Development Centre: A Day-One Ready Workforce Skill Development Centre fully operational for in-house and customer training; the first batch of 25 trainees will be deployed to the Odisha plant 25 30 +50 Batch 1 · Odisha plant Batch 2 · Vadod

  18. Slide 18: Karachiya, Vadodara: Construction Progress

    MANUFACTURING FACILITY · UNIT 2 ( CapEx completed) Karachiya, Vadodara: Construction Progress UNDER CONSTRUCTION IN FY26 COMPLETED FACILITY INSIDE THE NEW SHOP FLOOR Facility completed · Inauguration Nov 2026 Parth Electricals & Engineering Ltd. | H1 FY27 Earnings Presentation 17

  19. Slide 19: Khordha, Odisha: Facility Set Up

    MANUFACTURING FACILITY · UNIT 3 (Ongoing CapEx) Khordha, Odisha: Facility Set Up Shopfloor set-up Store set-up Khordha, Odisha Machinery Parth Electricals & Engineering Ltd. | H1 FY27 Earnings Presentation 18

  20. Slide 20: CapEx Update: Phase 1 Deployment Status

    CAPEX UPDATE CapEx Update: Phase 1 Deployment Status All figures in ₹ Particulars of CapEx CapEx in H1 FY27 Total CapEx till date Karachiya, Vadodara (Unit-2) 13.13 Cr 21.79 Cr Khordha, Odisha (Unit-3) 6.64 Cr 6.64 Cr Total 19.77 Cr 28.43 Cr Completed - May 2026 Inauguration Nov 2026 Operational Und

  21. Slide 21: H1 FY27 vs H1 FY26: Profit & Loss

    PROFIT & LOSS STATEMENT H1 FY27 vs H1 FY26: Profit & Loss ₹ Crore H1 FY27 (U/A) H1 FY26 (U/A) YoY Cost structure (% of total income) Revenue from operations 114.19 80.40 +42.0% H1 FY26 H1 FY27 Other income 2.21 0.71 +211% 71.2% Materials Total income 116.40 81.11 +43.5% 66.8% 8.8% Cost of materials

  22. Slide 22: H1 FY27 vs H1 FY26: Balance Sheet

    BALANCE SHEET H1 FY27 vs H1 FY26: Balance Sheet Equity & liabilities Assets Return on equity (ROE) H1 FY27 H1 FY26 H1 FY27 H1 FY26 13.8% ₹ Crore ₹ Crore 12.8% (U/A) (U/A) (U/A) (U/A) 11.2% Share capital 14.83 13.67 Net fixed assets 30.33 21.03 Reserves & surplus 116.91 95.02 Capital WIP 21.55 7.69 N

  23. Slide 23: Higher Profit; Cash Tied up in Growth

    CASH FLOW STATEMENT Higher Profit; Cash Tied up in Growth ₹ Crore H1 FY27 (U/A) H1 FY26 (U/A) Working capital cycle (days) Operating profit before WC changes 13.20 9.53 Receivable days Inventory days Payable days Cash conversion cycle Working capital changes −16.67 1.94 Taxes paid −2.97 −2.52 94 107

  24. Slide 24: Key Takeaways and Strategy

    KEY TAKEAWAYS & STRATEGY Key Takeaways and Strategy Profitable Growth; Cash Conversion Is the H2 Focus Three Engines Behind the Outlook What went well in H1 • ₹470 Cr order book; ₹300 Cr+ bid pipeline • Total income +43.5% • Vadodara GIS unit from Nov 2026 • Gross margin +444 bps to 33.25%; PAT +49%

  25. Slide 25: Proposed Acquisition of Takalkar Power Engineers & Consultants

    STRATEGIC ACQUISITION Proposed Acquisition of Takalkar Power Engineers & Consultants 100% EQUITY ACQUISITION ABOUT TAKALKAR · BUSINESS OVERVIEW Takalkar Power Engineers & Consultants Pvt. Ltd. Vadodara, Gujarat · Operations across India ₹6.00 Cr All-cash deal – Takalkar will become a wholly owned En

  26. Slide 26: Key Milestones over the Next Three Quarters

    UPCOMING MILESTONES Key Milestones over the Next Three Quarters Q3 FY27 Q4 FY27 Q1 FY28 Nov 2026 Dec 2026 Feb 2027 Mar 2027 Jun 2027 Vadodara GIS plant Data centre order for UL-certified MV Odisha 60,000 sq ft Odisha facility fully inauguration; 33kV GIS Vertiv, Jamnagar, fully switchgear delivered

  27. Slide 27: Thank you

    Parth Electricals & Engineering Ltd. Thank you H1 FY27 Earnings Presentation · November 2026 INVESTOR RELATIONS ADVISORY Karnametic Partners LLP Karan Anchalia +91 70037 44201 [email protected]

Parth Electricals & Engineering — H1 FY27 Earnings Presentation on 6ix