Tellurian — Investor Presentation (January 2020)
41 slides from Tellurian's investor presentation, Jan 6, 2020
Slide 1: Corporate presentation January 2020
Corporate presentation January 2020
Slide 2: Cautionary statements
Cautionary statements Forward-looking statements The information in this presentation includes “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. All statements other than state
Slide 3: 2020: the year of Tellurian
2020: the year of Tellurian Strongest LNG market fundamentals in history ◼ Global LNG demand continues to grow, four-year average of ~9.3% annually ◼ Despite record global LNG supply additions from 2016-2019, capacity utilization remains at ~90% ◼ Significant slowdown in global LNG supply additions
Slide 4: Demand has absorbed all new LNG capacity
Demand has absorbed all new LNG capacity Monthly global LNG demand and capacity(1)2019E LNG demand and capacity(1) million tonnes/month 38 36 34 32 2019E capacity 2019E LNG demand mtpa 2019E utilization = 89% 416 372 30 28 2018 LNG demand 26 24 JanFebMarAprMayJunJulAugSepOctNovDec DemandCapacity Sou
Slide 5: Global liquefaction capacity additions (mtpa)
Global liquefaction capacity additions (mtpa) ~120 mtpa capacity additionsLimited capacity additions, favorable pricing(1) 43~64 mtpa capacity additions 34 272928 25 1616 11 8 3 (2) (5) (3) (5) 201620172018201920202021202220232024202520262027202820292030 Sources: Wood Mackenzie, Tellurian analysis.
Slide 6: Capacity required vs. LNG demand growth
mtpa 800 700 9.3% p.a. growth rate Capacity required(1) 9.3%(2) 600 500 6.6%(3) ~200 mtpa ~100 mtpa 400 300 200 100 - 20152016201720182019202020212022202320242025 Under construction(4) In operation Sources: Wood Mackenzie, Bernstein, Morgan Stanley and Tellurian Research. Notes:(1) Assumes 86.5% uti
Slide 7: Driftwood site attributes
Access to pipeline infrastructure Access to power and water Support from local communities Site size over 1,000 acres Insulation from surge, wind and local populations Berth over 45’ depth with access to high seas ✓ Fully permitted ✓ 28% engineering complete ✓ EPC contract signed ✓ Shovel ready
Slide 8: Driftwood pipeline route map
Driftwood pipeline route map T E X A S Trunkline CS 01 Gillis Tennessee Gas CS 03 Mamou Transco Texas Gas TETCO 2 ANR CGT ◼ 96 mile, up to 48” diameter pipeline ◼ Three compressor stations totaling 274,000 hp Driftwood LNG facility KMLP TETCO 1 Cameron Pipeline Creole Trail DWLNG CS 02 Basile Egan F
Slide 9: Driftwood expects to deliver LNG FOB at $3-$4/mmBtu
Driftwood expects to deliver LNG FOB at $3-$4/mmBtu Gas sourcing LNG plant + pipeline(1) Debt Service(2) $2.00/mmBtu + $0.75/mmBtu + $0.75/mmBtu $3.50/mmBtu Average cost on the water Notes:(1) Includes operating expenses for Driftwood LNG plant and Driftwood pipeline, G&A and management fee. (2) ~$1
Slide 10: Driftwood LNG and pipeline capital at 5-plant FID
Driftwood LNG and pipeline capital at 5-plant FID $ in billions, unless otherwise noted Cost/tonne ($/tonne)$796 ◼ Financing costs and interest3.1 Total Uses$25.1 Total Sources$25.1 At <$800/tonne, Driftwood is among the lowest-cost global LNG projects Note:(1) Includes ~$2.9 bn in owner’s costs (in
Slide 11: Driftwood capacity, by partner share
Driftwood capacity, by partner share mtpa retainedpurchased(1) (2) Notes:(1) Represents required equity contribution at $500/tonne. (2) Based on Memorandum of Understanding (MOU) announced on September 21, 2019 with volume of up to 5 mtpa.
Slide 12: Driftwood LNG and pipeline are shovel ready, all permits secured
✓Driftwood LNG and pipeline are shovel ready, all permits secured ✓Engineering 28% complete, >$150 mm invested ✓Implied replacement enterprise value of $5.8 billion, or >$20/share(1) ✓At full operations, projected $8/share in cash flow(2) Note:(1) Value of Tellurian’s carried interest of 11.6 mtpa a
Slide 13: Investor relations contacts
▪Kian Granmayeh Director, Investor Relations +1 832 320 9293 [email protected] ▪Joi Lecznar SVP, Public Affairs & Communication +1 832 962 4044 [email protected] Social media @TellurianLNG
Slide 14: Driftwood project overview
Driftwood project overview
Slide 15: Tellurian ownership structure and illustrative cash flow
Tellurian ownership structure(2) Illustrative cash flow calculation to Tellurian ~49% LP ownership 100% GP ownership Driftwood Holdings ~13.6 mtpa x52 conversion x $3.50 margin Production Company Pipeline Network LNG Terminal billion annual =$2.5 ~15 Tcf of resources~1,000 miles of pipe~27.6 mtpa No
Slide 16: Driftwood EPC contract costs ($ per tonne)
Driftwood EPC contract costs ($ per tonne) $710 $700 Increase from price refresh $500$510 $390 $490$500 $380 ~$560 ~$550 ◼ Leading LNG EPC contractor ― 44 LNG trains delivered to 18 customers in 9 countries ― ~30% of global LNG liquefaction capacity (>125 mtpa) ◼ Tellurian and Bechtel relationship ―
Slide 17: Bringing low-cost gas to SW Louisiana
Bringing low-cost gas to SW Louisiana 2 4 3 1 1Driftwood Pipeline(1) ▪Capacity (Bcf/d)4.0 ▪Cost ($ billions)$2.3 ▪Length (miles)96 ▪Diameter (inches)48 ▪Compression (HP)274,000 ▪StatusFERC approval complete 2Haynesville Global Access Pipeline(1) ▪Capacity (Bcf/d)2.0 ▪Cost ($ billions)$1.4 ▪Length (m
Slide 18: Every $1.00 change adds $2.65/share in cash flow
Every $1.00 reduction in gas costs or increase in LNG price adds $2.65/share in cash flow in 5-plant case Base case Cost of LNG(1) ($/mmBtu) $3.50 $3.50 $3.50 $3.50 Notes:(1) $3.50/mmBtu cost of LNG FOB Gulf Coast assumes $2.00/mmBtu cost of gas at Driftwood LNG terminal. (2) Annual cash flow equals
Slide 19: Driftwood partner returns by margin
Driftwood LNG, FOB U.S. Gulf Coast ($/mmBtu)$(3.50)$(3.50)$(3.50)$(3.50) Margin ($/mmBtu)$1.50$3.50$5.50$7.50 Annual partner cash flow(1) ($ millions per tonne)$80$180$285$390 Cash on cash return(2)16%36%57%78% Payback(3) (years)6321 Notes:(1) Annual partner cash flow equals the margin multiplied by
Slide 20: Driftwood sources and uses by capacity
Capacity (mtpa)16.616.627.627.6 $10.6 $10.6 1.8 1.8 1.5 1.5 ---- --4.2 --1.8 1.1 1.4 2.2 3.5 $15.5 $15.5 2.9 2.9 2.3 1.6 --1.4 --4.2 --1.8 1.3 1.5 3.1 4.7 $(9.5) $(16.7) (1.7) (2.1) $(13.7) $(20.5) (3.4) (5.2) ― Debt financing(5) Net equity $6.0 $6.0 $8.0 $8.0 Transaction price ($ per tonne) $500 $5
Slide 21: Milestones and target dates
MilestoneTarget date ◼Fully-wrapped EPC contract ◼Draft FERC EIS ◼Final FERC EIS ◼Final FERC Order ◼DOE license to export to non-FTA countries ◼Complete open seasons on pipelines ◼Executed definitive agreements with Total ◼Finalize capital raise process –Partner & equity funding –Launch debt process
Slide 22: Company history and investments timeline
September Management, friends and family invest $60 million in Tellurian February Merge with Magellan Petroleum, gaining access to public markets December Raise approximately $100 million in public equity Feb/March Announce open seasons for Haynesville Global Access Pipeline and Permian Global Acces
Slide 23: Commercial momentum
Commercial momentum
Slide 24: Growing list of expected partners and customers
Growing list of expected partners and customers Driftwood project Marketing Equity investor(1)Up to 5.0 mtpaBaa2 (Moody’s) Equity investor2.0 mtpa--Tellurian Marketing JKM linked1.5 mtpaA+/Aa3/AA-JKM linked(2) (Equity investment under review) 1.5 mtpaUnrated Notes:(1) Per Memorandum of Understanding
Slide 25: Driftwood equity investment and SPA
Driftwood equity investment and SPA ▪ On July 10, 2019, Total agreed to make a $500 million equity investment in Driftwood project and to purchase 1 mtpa of LNG ▪ Total also agreed to purchase 1.5 mtpa of LNG from Tellurian Marketing’s LNG offtake volumes from the Driftwood LNG export terminal ― FOB
Slide 26: Petronet LNG MOU
◼ On September 21, 2019, Tellurian and Petronet LNG Limited INDIA (“Petronet LNG”) signed a memorandum of understanding (“MOU”) for up to five million tonnes per annum (“mtpa”) of liquefied natural gas (“LNG”) through an equity investment in Driftwood - MOU coincided with the visit of Prime Minister
Slide 27: Key player in major LNG demand center
Key player in major LNG demand center Petronet LNG ownership structure ◼ Petronet LNG formed as a joint venture in 1998 by the government of India to import LNG and set up regasification terminals in the country ◼ Publicly traded; 50% owned by India’s four major state-owned oil and gas enterprises ◼
Slide 28: LNG macro updates
LNG macro updates
Slide 29: U.S. natural gas export requirements
U.S. natural gas export requirements LNG export capacity(2) ~17 bcf/d additional U.S. natural gas export capacity required(1) 115 mtpa of additional LNG capacity required(2) 8 bcf/d 2019A2025E Sources: RBN, Tellurian analysis. Notes:(1) Assumes U.S. domestic gas demand grows at 0.6% p.a. and liquefa
Slide 30: Permian gas to drive U.S. LNG export growth
Permian gas to drive U.S. LNG export growth Permian oil drilling activity expected to double Permian gas production from 2018 to 2025 Permian oil and gas production forecast mmboe/d 12 Dry gas 8 ~19 bcf/d 2025E Permian dry gas production 4Crude oil - 20132025E Sources: EIA, BP Energy Outlook and Blo
Slide 31: The shifting landscape of energy consumption
The shifting landscape of energy consumptionDrivers of shifting landscape Tonnes oil equivalent/capita 31% 7.0 23% 19% 2030 target for gas’ share in both India and China’s energy mix 15%15% 24% ▪Non-OECD energy consumption growth rate was ~13x that of OECD’s over the past decade ▪Despite massive ene
Slide 32: LNG demand growth (2019-2025)
LNG demand growth (2019-2025)Key growth drivers 45.5 15.3 India 43.3 21.0 ▪Infrastructure: ― ~2x growth in India’s pipeline grid by 2025 ― ~2x growth in India’s regas capacity by 2025 ― ~1.5x growth in China’s pipeline grid by 2025 ― ~2x growth in China’s regas capacity by 2025 ▪Policy: ― India and
Slide 33: India natural gas demand – primary sources
India natural gas demand – primary sources mtpa Incremental supply required for 15% target(1) Uncontracted LNG Contracted LNG Indigenous Production 70 153 75 India’s gas demand drivers ▪Prime Minister Modi has set a target of 15% for natural gas’ share of India’s energy mix by 2030 ▪~$100 billion in
Slide 34: India is rapidly building out gas infrastructure
India is rapidly building out gas infrastructure Sharp increase in LNG and gas-related infrastructure will tap into significant latent gas demand India’s emerging regas & gas transport infrastructureIndia’s regasification capacity buildout mtpa Existing Under construction Likely in-service78 69 21 5
Slide 35: India's demand: not just a power gen story
India’s demand: not just a power gen story India’s gas demand growth breakout (2018-2025) India’s gas demand drivers Transport (3%) ResCom (16%) Other (4%) Power (22%) ▪India’s gas infrastructure build out will unlock significant latent natural gas demand ▪Opportunity to improve air quality through
Slide 36: New Asian markets grow ~41 mtpa by 2025
New Asian markets grow ~41 mtpa by 2025 Emerging markets could add the equivalent of another South Korean market by 2025 ▪Bangladesh, Malaysia, Pakistan, Thailand: ― > 32% gas market penetration, declining indigenous gas production and strong economic growth increase the call for imports ▪Philippine
Slide 37: Latent LNG demand of 1,359 mtpa
1,359 mtpa LNG equivalent latent LNG demand There is substantial latent demand for LNG, which is competitive with oil prices and cleaner than coal 2018 fuel consumption (mtpa LNG equivalent) 885 170 97 208 Liquid maritime fuels (HFO)Oil burned for power generation (ex-North America) Coal burned for
Slide 38: JKM growing as price reference for Asia
JKM growing as price reference for Asia Spot and short-term LNG trade Total trade (mtpa) Share of total trade (%) JKM swaps cleared mtpa equivalent 99 87 32% 7068 65 59 75 28% 78 27% 35 25% 28% 29% 28% 10 00013 2012201320142015201620172018 20122013201420152016201720182019E Source:Platts, GIIGNL.
Slide 39: ESG
ESG
Slide 40: Environmental and social leadership
Environmental and social leadership Driftwood LNG project expected to reduce lifecycle carbon emissions and support local communities Lifecycle emission reductionSustainable development Social engagement ▪Provide an outlet for currently flared natural gas in the U.S. ▪Replace coal and oil in emergin
Slide 41: LNG's role in the energy transition
LNG’s role in the energy transition Today: Reduce carbon intensity, improve air qualityFuture: Net zero carbon emissions •Increasingly cost-competitive with coal •Reduces carbon emissions by up to 50% •Reduces SOx, NOx and particulate matter Facilitates coal-to-gas switching Carbon capture, utilizat