  1. Slide 1: The Tata Power Company Ltd. Investor Presentation January 2014

    Presentation Title ( Arial, The Tata Power Company Ltd. Font size 28 ) Date, Venue, etc ..( Arial, January Font size 18 )FY2014 …Message Box ( Arial, Font size 18 Bold)

  2. Slide 2: Disclaimer

    Disclaimer •Certain statements made in this presentation may not be based on historical information or facts and may be “forward looking statements”, including those relating to The Tata Power Company Limited‟s general business plans and strategy, its future outlook and growth prospects, and future

  3. Slide 3: A Tata Group Company

    A Tata Group Company Promoter Revenue by business segments Listed Companies Mkt Cap ($ bn)2 Shareholding (%)1 Tata Consultancy Services 68.28 73.9 Chemicals, 3 Services, 4 Tata Motors 18.45 34.3 Energy, 6 Tata Steel 5.63 31.3 Engineering , 38 Titan 3.21 53.1 Tata Power 2.86 32.5 IT & Comm, Revenue 1

  4. Slide 4: Tata Power is India's largest Integrated Power Utility

    Tata Power is India‟s largest Integrated Power Utility • Founded in 1906 to supply power to Mumbai – First hydro plant commissioned in 1915 – Set up thermal power plants in Mumbai in the 1950s • Expanded in India after private sector reforms in 1990s Fuel Fuel Logistics Generation Transmission Distr

  5. Slide 5: Tata Power: Business Overview

    Tata Power: Business Overview • Trombay • Hydros • Jojobera • Belgaum • Haldia • Wind Farms Power Generation • CGPL (Mundra UMPP) 100% Business • Maithon 74% • IEL 74% • Dagachhu 26% • OTP Geothermal 50% • Cennergi 50% • Georgia Hydro 40% • Mumbai Transmission • Powerlinks 51% Investments • Mumbai D

  6. Slide 6: Existing Generation Assets and Growth Plans

    Existing Generation Assets and Growth Plans Operational Under Execution Projects in advanced Projects under stages of development scanning- 6300 MW* Trombay 1580 Dagacchu 126 Hydros 447 Kalinganagar 202 Thermal 8270 Belgaum 81 Georgia 185 Renewables 1000 30000 Wind 437 Cennergi 230 25000 MW Haldia 1

  7. Slide 7: Existing Generation Assets - Business Models

    Existing Generation Assets - Business Models Capacity % of overall Tata Power Off-take Model Returns Upside (MW) capacity projects counterparty Mumbai Operations BEST, TPTCL, Tata Fixed return Savings on Norms + (Thermal & Hydro), Regulated returns 3425 40% Power Distribution, on equity PLF incentiv

  8. Slide 8: Mundra UMPP (4000 MW)

    Mundra UMPP (4000 MW) Status Project Commissioned Capacity  4000 MW (5 X 800 MW)  Gujarat (1805 MW), Maharashtra (760 MW), Punjab (475 MW), Haryana (380 MW), Rajasthan (380 Customers MW) Fuel  Imported Coal – 10-12 MTPA Requirement  Offtake agreement with Indocoal for 10.11 ± 20% & Source  Look

  9. Slide 9: Maithon Power Limited (1050MW)

    Maithon Power Limited (1050MW) Status  Project Commissioned Capacity  1050 MW (2 X 525 MW)  DVC (300 MW), NDPL (300 MW), WBSEB (300 MW), 150 MW under negotiation Customers  Long term (30 yr) PPAs commence on CoD for DVC & 1st April 2012 for NDPL and WBSEB  Domestic Coal; 100% linkage sanctioned

  10. Slide 10: Projects Under Execution

    Projects Under Execution Capacity Project Fuel Status of Completion Power off-take COD (MW) Dagacchu 126 Hydro • NA TPTCL FY14 Gas based – All 3 units Kalinganagar 202 Gas based • Civil work in progress Tata Steel expected by FY15 Turkey (85%), Expected Georgia Hydro 185 Hydro • Civil work in progre

  11. Slide 11: Projects Under Development – Domestic

    Projects Under Development – Domestic Capacity Project Fuel Source Status Execution schedule (MW) Coal based: Application MOU finalised, Environment for linkage submitted, Clearance for the gas based plant Kalinganagar Indonesian coal being 450 obtained by Tata Steel along with Coal based – All 3 un

  12. Slide 12: Projects Under Development – International

    Projects Under Development – International Project Details  Tata Power in an agreement with Clean Energy Invest AS and IFC InfraVentures for development of hydro power projects in Georgia with 40% Georgia Phase-II stake in the venture implementing three hydro projects aggregating to 400 MW  Power

  13. Slide 13: Renewable Projects under Execution/Development

    Renewable Projects under Execution/Development  2 x 63 MW run of the river Hydro with Tata Power holding 26% and Royal Govt. of Bhutan holding 74% Dagacchu 126 MW  Project cost-USD 220 million with debt equity of 60: 40; debt tied up with ADB and others Hydro project  PPA signed with Tata Power T

  14. Slide 14: Strategic Investment in Coal

    Strategic Investment in Coal 30% stake in Indonesian coal mine – KPC & Arutmin *  Total estimated coal production to reach 80 mm tonnes by FY14  Overall rights adequately protected through the Shareholders‟ Agreement 33% stake in captive coal mine – Mandakini  7.5 MTPA (jointly allotted with Jind

  15. Slide 15: Long term fuel contracts

    Long term fuel contracts Project Fuel requirement Source of fuel Contract details Term PT Adaro: 1.00 MTPA (+/- 0.25MTPA) 5yrs c.3 MTPA of coal Purchase agreements PT Adaro: 1.00 MTPA (+/- 0.2MTPA) 10yrs Trombay Samtan: 0.65 MTPA (+/- 10%) Till FY14 From nearby refineries, Oil delivered by pipeline

  16. Slide 16: Transmission and Distribution

    Transmission and Distribution Transmission – Mumbai Powerlinks Transmissions Limited TRANSMISSION  Tata Power is amongst the 3 transmission licensees  JV between Tata Power (51%) and Power Grid Corporation of that bring power into Mumbai India Ltd. (49%)  1,100 CKm of 220KV / 110KV lines and 19 r

  17. Slide 17: Other Businesses

    Other Businesses  100% subsidiary TPTCL, holds a trading license for a period of 25 years starting from 2004 Tata Power Trading  Holds a Category 1 trading license, the highest grade of license, which permits the company to trade any amount of power  Trust Energy Resources Pte Ltd incorporated in

  18. Slide 18: Appendix: Financial Statements

    Appendix: Financial Statements …Message Box ( Arial, Font size 18 Bold)

  19. Slide 19: Snapshot Standalone Financials – Q3 FY2014

    Snapshot Standalone Financials – Q3 FY2014 Figures in ` Crores Q3 FY14 Q3 FY13 Revenue from Operations (Net) 2,008 2,549 Operating Expenditure 1,296 1,979 Operating Profit 712 570 Add: Other Income (9) 32 EBIDTA 703 602 Less: Depreciation/Amortization/Impairment 148 128 EBIT 554 474 Less: Finance Co

  20. Slide 20: Standalone Results – Q3 FY2014

    Standalone Results – Q3 FY2014 …Message Box 19 ( Arial, Font size 18 Bold)

  21. Slide 21: Snapshot Standalone Financials – FY2013

    Snapshot Standalone Financials – FY2013 Figures in ` Crores FY13 FY12 Revenue from Operations (Net) 9,567 8496 Operating Expenditure 7,515 6,711 Operating Profit 2,052 1,785 Add: Other Income 694 983 EBIDTA 2,746 2,768 Less: Depreciation/Amortization/Impairment 364 570 EBIT 2,382 2,198 Less: Finance

  22. Slide 22: Financials (Standalone)

    Financials (Standalone) All figures in INR Revenues EBIDTA and EBIDTA margin billion 103 30.0 30.4% 30.1% 27.7 27.5 35.0% 95 32.6% 30.0% 79 25.0 74 74 24.5% 21.6 20.8 28.7% 25.0% 20.0 17.7 20.0% 15.0 15.0% 10.0 10.0% 5.0 5.0% - 0.0% FY09 FY10 FY11 FY12 FY13 FY09 FY10 FY11 FY12 FY13 EBIT and EBIT mar

  23. Slide 23: Snapshot Consolidated Financials – Q3 FY2014

    Snapshot Consolidated Financials – Q3 FY2014 Figures in ` Crores Q3 FY14 Q3 FY13 Revenue from Operations (Net) 8,700 9,039 Operating Expenditure 6,914 7,183 Operating Profit 1,786 1,856 Add: Other Income (94) 11 EBIDTA 1,692 1,867 Less: Depreciation/Amortization/Impairment 666 1,187 EBIT 1,027 680 L

  24. Slide 24: Consolidated Results – Q3 FY2014

    Consolidated Results – Q3 FY2014 …Message Box 23 ( Arial, Font size 18 Bold)

  25. Slide 25: Snapshot Consolidated Financials – FY2013

    Snapshot Consolidated Financials – FY2013 Figures in ` Crores FY13 FY12 Revenue from Operations (Net) 33,025 26,001 Operating Expenditure 26,393 20,676 Operating Profit 6,632 5,325 Add: Other Income 182 (156) EBIDTA 6,814 5,169 Less: Depreciation/Amortization/Impairment 2,902 3,135 EBIT 3,912 2,034

  26. Slide 26: Financials (Consolidated)

    Financials (Consolidated) All figures in400 INR Revenues EBIDTA and EBIDTA margin billion 334.0 80 30.00% 350 25.19% 68 300 70 22.61% 263 25.00% 21.12% 60 52 250 50 199 19.66% 20.40% 20.00% 186 196 50 44 200 39 40 15.00% 150 30 100 10.00% 20 50 5.00% 10 - 0 0.00% FY09 FY10 FY11 FY12 FY13 FY09 FY10 F

  27. Slide 27: Tata Power Stock Performance

    Tata Power Stock Performance April 2012 – till date: normalized chart …Message Box 26 ( Arial, Font size 18 Bold)

  28. Slide 28: Sustainability Initiatives

    Tata Power has undertaken a number of initiatives on Sustainability as a part of „Leadership with Care‟ Sustainability initiatives Care for Environment Care for Community Care for Customers Care for People  Renewables, clean/ green  Community engagement  Energy clubs  Safety and health energy 

  29. Slide 29: Awards and Recognition

    Awards and Recognition CII ITC Sustainability Award 2012 for strong Power Line ‘Best Performing Private Discom’ commitment to environment award for TPDDL Power Line award for ‘Best Performing Winner - Infrastructure Excellence Awards 2012 for the Renewable IPP’ project – Ultra Mega Power Project, Mu

  30. Slide 30: Investor Relations Contact

    Website: www.tatapower.com Email ID: investorrelations @tatapower.com Investor Relations Team Nandakumar S Tirumalai Head – Corporate Finance & Treasury Tel : +91 22 6717 1513 Anirudh Mani Lead – Corporate Finance & Treasury Tel +91 22 6717 1312 …Message Box 29 ( Arial, Font size 18 Bold)