Elia Group Sa/nv — Technical Presentation (November 2016)

13 slides from Elia Group Sa/nv's technical presentation, Nov 21, 2016

  1. Slide 1: Transposition of European Network Codes

    Transposition of European Network Codes Asset protection and system robustness Protection and Control requirements Task Force Implementation of Network Codes meeting 1 Felicia Lazar, Elia, Asset Management, Sec. Sys 21/11/2016

  2. Slide 2: Protection and Control requirements in RfG Network code

    Protection and Control requirements in RfG Network code

  3. Slide 3: Protection and control starting from type A PGMs

    Protection and control starting from type A PGMs Connection conditions Active power ramping after connection Protection and control starting from type B PGMs • Protection for internal faults should be selective in relation with FRT capabilities: example under-voltage protection settings. • The prote

  4. Slide 4: Protection and control starting from type C PGMs

    Protection and control starting from type C PGMs • Robustness requirement: PGM shall be capable of remaining connected to the network during single phase or three-phase auto-reclosure on meshed network lines. The details will be subject of agreement. • System restauration related requirement: in cas

  5. Slide 5: Protection and Control requirements in DCC Network code

    Protection and Control requirements in DCC Network code

  6. Slide 6: NC DCC: Protection & Control

    NC DCC: Protection & Control For the transmission connected demand facilities, transmission connected distribution systems and distribution system connections • Control for system stability or for emergency actions schemes and settings; • Disconnection demand for system defence and reconnection dema

  7. Slide 7: Protection and Control requirements in HVDC Network code

    Protection and Control requirements in HVDC Network code

  8. Slide 8: NC HVDC systems and DC connected power park modules

    NC HVDC systems and DC connected power park modules • Fault ride through capabilities and performances of the protections dedicated to internal faults • Coordination and agreement of schemes and settings necessary to protect the network • Coordination of protection schemes relevant for the HVDC syst

  9. Slide 9: Protection and Control requirements in Guideline on electricity transmission system operation

    Protection and Control requirements in Guideline on electricity transmission system operation Network code Part 1. Operational Security NC OS Part 2. Operational Planning and Scheduling NC OPS Part 3. Load Frequency control and reserves LFC&R

  10. Slide 10: Protection

    Protection Part 2 Title1 Chapter 6 Article 36 • Each TSO shall operate its transmission system with the protection and backup protection equipment • At least once every five years, each TSO shall review its protection strategy and concepts and update them where necessary to ensure the correct functi

  11. Slide 11: Special Protection Schemes

    Special Protection Schemes Part 2 Title1 Chapter 6 Article 37 Requirements for TSOs when applying SPS - operational performances: selectivity, reliability, effectivity - evaluate in the design stage the impact of the SPS incorrect operation - verify that the special protection scheme has a comparabl

  12. Slide 12: Protection and Control requirements in Network code on Emergency and Restoration

    Protection and Control requirements in Network code on Emergency and Restoration

  13. Slide 13: System Defence Plan/Special Protection Schemes

    System Defence Plan/Special Protection Schemes Design of the System Defence Plan The system Defence Plan shall include at least the following technical and organisational measures : System Protection Schemes including at least: i. automatic under-Frequency control scheme; ii. automatic over-Frequenc