Northern Minerals Limited · ASX:NTU

Northern Minerals — Non-Deal Roadshow (June 2022)

24 slides from Northern Minerals's roadshow presentation, Jun 9, 2022

  1. Slide 1: Browns Range Heavy Rare Earths Project

    Browns Range Heavy Rare Earths Project For personal use only New York / Toronto Roadshow Presented by: Mark Tory CEO June 2022

  2. Slide 2: Disclaimer

    Disclaimer This document has been prepared by Northern Minerals Limited (“Northern Minerals” or the “Company”). For personal use only This document is of a summary form only and therefore contains general background information which may not be complete. It should be read in conjunction with and ful

  3. Slide 3: Rare earth applications

    Browns Range East Kimberley, WA For personal use only Rare earth applications  NdFeB Permanent magnets require dysprosium (Dy) and terbium (Tb)  Electric drivetrains in passenger cars are forecast to account for the majority of increased demand through to 2040  Dy and Tb also have a range of mili

  4. Slide 4: Tier one resources jurisdiction

    Tier 1 resources jurisdiction For personal use only  Australia is one of the world’s most proven, safe and reliable jurisdictions for mining and mineral processing  Northern Minerals is actively engaging with Critical Minerals Facilitation Office established in Canberra in January 2020  Secure te

  5. Slide 5: Australian HREE production is ethical

    Australian HREE Southern China in situ leach mining operation For personal use only production is ethical  Browns Range produces HREE from hard rock xenotime ore at a grade of 600 – 800 ppm Dy  Mining and processing methods in China, due to low grade ore, operate at just 20 – 40 ppm Dy  98% of wo

  6. Slide 6: Our Aspiration

    Our Aspiration Principal supplier of ethically produced rare For personal use only earth separated products with a world class heavy rare earth element inventory A twelve year $300m+ journey DISCOVERY EXPLORATION EVALUATION AND APPROVALS DFS NEW PLAN DEVELOPMENT TESTWORK 2010 2011 2012 2013 2014 201

  7. Slide 7: Rare earth magnet supply chain

    Rare earth magnet supply chain CHINA DOMINATES Upstream Midstream Downstream For personal use only Refining/recycling Extraction Beneficiation Hydrometallurgy Separation Oxide Alloy and Component End-use to metal magnet manufacture manufacture manufacture Mixed Dy Oxide DyFe Metal Carbonate Tb Oxide

  8. Slide 8: Demand for EVs continues to grow

    Demand for EV’s continues to grow which means increase in Dy and Tb For personal use only  Electric vehicle (EV) and renewables demand is increasing, (UK announced no sales of petrol and diesel vehicles by 2030)  EV sales and growth will be limited by access to raw and finished commodities – parti

  9. Slide 9: Dysprosium Pricing

    Dysprosium Pricing 550 Dysprosium Oxide 99.5% min China US$/kg For personal use only 500 450 Dy price currently up 44% from start of June 2020 to US$384/kg 400 350 300 250 200 01-Jun-20 01-Aug-20 01-Oct-20 01-Dec-20 01-Feb-21 01-Apr-21 01-Jun-21 01-Aug-21 01-Oct-21 01-Dec-21 01-Feb-22 01-Apr-22 Sour

  10. Slide 10: Terbium Pricing

    Terbium Pricing Terbium Oxide 99.9% min China US$/kg For personal use only 3,000 2,500 2,000 1,500 1,000 Terbium currently $2,150/kg, Up 270% from start of June 2020 500 0 01-Jun-20 01-Aug-20 01-Oct-20 01-Dec-20 01-Feb-21 01-Apr-21 01-Jun-21 01-Aug-21 01-Oct-21 01-Dec-21 01-Feb-22 01-Apr-22 Source:

  11. Slide 11: Yttrium Pricing

    Yttrium Pricing 16.00 Yttrium Oxide 99.99% min China US$/kg For personal use only 14.00 12.00 10.00 8.00 Y price currently up over 377% from start of June 2020 to US$12.75/kg 6.00 4.00 2.00 01-Jun-20 01-Aug-20 01-Oct-20 01-Dec-20 01-Feb-21 01-Apr-21 01-Jun-21 01-Aug-21 01-Oct-21 01-Dec-21 01-Feb-22

  12. Slide 12: Strategy for Downstream Processing

    Strategy for Downstream Processing For personal use only  Review completed in relation to strategy for downstream processing  Only full-scale beneficiation plant would be built at site  Selling concentrate from beneficiation plant to be reviewed with view of long term contract  Long term strateg

  13. Slide 13: 2021 / 22 Exploration Results

    2021 / 22 Exploration Results For personal use only  Since 30 June 2021 spent nearly A$7m on exploration  Total of 17,500 metres RC drilling and over 2,000 metres of diamond drilling since end of June 2021  Continued to get good results from Dazzler resource  Encouraging results Banshee drilling

  14. Slide 14: Dazzler – Grade is King

    Dazzler – Grade is King For personal use only  Exploration results from Dazzler show grades up to 10x the average Browns Range resource grade  Dazzler ‘lookalikes’ to be a focus of the exploration program  Dazzler Inferred Mineral Resource of 0.21Mt @ 2.33% TREO  Dazzler intercepts to date inclu

  15. Slide 15: Banshee Prospect

    Banshee Prospect For personal use only  Combining Banshee, Banshee West and Banshee South  2021 / 22 drilling indicates mineralization continuous over a 400m by 400m area (compared to exiting resource 175m by 150m)  Bulk samples tested through ore sorter at pilot plant ASX:NTU 15

  16. Slide 16: Cyclops Prospect

    Cyclops Prospect For personal use only  Wolverine style hematite-xenotime breccia  Diamond drilling grades have seen 15.65m @1.83% TREO from 24m  Strong potential to extend high grade intercepts at depth  Shallow intercepts improve economic viability  Follow up drilling in 2022 / 23 ASX:NTU 16

  17. Slide 17: Rockslider Prospect

    Rockslider Prospect For personal use only  Strong pXRF and radiometric anomalism with hematite breccia  RC drilling results returned 103m @ 0.32% TREO from 15 metres  100 metre + strike in length and open to the N-NW  Follow up in 2022 / 23 ASX:NTU 17

  18. Slide 18: Wolverine Resource

    Wolverine Resource For personal use only  High grade intercepts trending NW have not been closed off at depth  Strong potential for continuation along primary mineralized structure  Last hole hit 28.6m @ 4.06% TREO from 480 metres and open to the West  Priority holes for follow up in 2022 / 23 A

  19. Slide 19: Exploration – "Own the Dome" strategy

    Exploration – “Own the Dome” For personal use only strategy  100% owned tenure and/or 100% rare earth rights over the Browns Range Dome  More than 2,300 square kilometres of tenure to evaluate  Strategy to increase Mineral Resource and the life of mine potential at Browns Range to 20+ years ASX:N

  20. Slide 20: Boulder Ridge NT Project

    Boulder Ridge NT Project For personal use only  Boulder Ridge previous rock chip results exceeding 12% TREO including up to 1.15% Dy  Work plan completed of mapping and collecting rock chips  Future RC scout drilling in 2022 / 23 HREE targets plotted onto Radiometrics anomaly and DEM. ASX:NTU 20

  21. Slide 21: John Galt WA Project

    John Galt WA Project For personal use only  John Galt previous rock chip results up to 42% TREO with approximately 95% Heavy REO  Copper anomalies identified to be followed up  Work program of detailed mapping, geochemical sampling and RC scout drilling to be undertaken Cu-in-stream anomaly map a

  22. Slide 22: Corporate Details

    Corporate Details Ordinary Shares as at 31 May 2022 Options and Performance Rights as at 31 May 2022 4,864M 258.8M Market Capitalisation as at 31 May 2022 $218.9M For personal use only Cash (as at 31 March 2022) $4.2M Debt (as at 31 March 2021): Nil 12 month low – high $0.03 - $0.071 Average daily v

  23. Slide 23: Why Northern Minerals has potential

    Why Northern Minerals has potential For personal use only  Has been only significant producer of HREE outside of China over the last 4 years  Working on feasibility study for full scale beneficiation plant at site with view to enter into long term concentrate sale contract The Company’s IP on pro

  24. Slide 24: Contact details

    Contact details For personal use only Mark Tory Chief Executive Officer [email protected] northernminerals.com.au ASX:NTU 24

Northern Minerals — Non-Deal Roadshow (June 2022) on 6ix