Tellurian — Investor Presentation (September 2017)
45 slides from Tellurian's investor presentation, Sep 6, 2017
Slide 1: Corporate presentation September 2017
Corporate presentation September 2017 Exhibit 99.1
Slide 2: Cautionary statement
Cautionary statement Forward looking statements Non-GAAP financial measures Telurian, EBITDA within the Imaning of Sesion 274 te Secu At 21099, a8 amended, an Secon 216 of tho Secures Exchange Act of 18%, as amended a statements other than Statements of historca ooking a mac 88 a ce and er Togulory
Slide 3: Tellurian introduction
Feb 2016:Charif Souki and Martin Houston established Tellurian as a private company Aug 2016:Meg Gentle joined to lead the company as President & CEO Dec 2016:GE invested $25 MM in Tellurian equity Jan 2017:Total invested $207 MM in Tellurian equity Feb 2017:Merged with Magellan Petroleum to gain ac
Slide 4: Pursuing accretive business along value chain
Pursuing accretive business along value chain Strategy Purchase low-cost gas at liquidity points, in field or as reserves Maximize margins & optionality Diversify gas supply Develop pipeline solutions for LNG plants in Louisiana Develop low-cost liquefaction Deliver LNG to end use markets worldwide
Slide 5: LNG oversupply is over – price signals work
LNG oversupply is over – price signals work Low prices have stimulated LNG demand growth . . . but effective capacity utilization is over 98% . . . 2018 expected to be very tight . . . and price surges expected to signal the call for additional supply. CME expected to launch futures trading for Gulf
Slide 6: Cornerstone project: Driftwood asset
Cornerstone project: Driftwood asset Driftwood terminal Land ~1,000 acres near Lake Charles, LA Nameplate = ~26 mtpa(’) capacity Trains = Up to 20 trains of 1.3 mtpa each © Le cnaies i = Chart heat exchangers eee pr Ms "New Orleans, Lousiana @ = GE LM6000-PF+ compressors Storage = 3 storage tanks =
Slide 7: Driftwood LNG cost competitive
Driftwood LNG cost competitive Source:Wood Mackenzie (Q4 2016), Tellurian estimates Note:(1) Includes owners’ costs and contingencies and excludes financing and pipeline related costs (2) Excludes development costs related to berths and storage tanks (3) Increase in costs tied to EPC as per 2Q17 CBI
Slide 8: History of moving quickly through regulatory process
History of moving quickly through regulatory process We employ many of the same members that executed Sabine Pass Source: FERC regulatory filings Note:(1) Duration of FERC review for Driftwood Project filing based on Tellurian estimates
Slide 9: Tellurian underpinned by simple capital structure
Tellurian underpinned by simple capital structure Ownership structure Financing assumptions Construction & pipeline capex 20 Trains: ~$13 - 16 Bn(5) 96-mile pipeline: ~ $1.6 - 2.0 Bn(6) Capital structure Debt-to-total capital Liquefaction plant: ~70% Pipeline: ~80% Plan to raise capital at OpCo leve
Slide 10: Tellurian competitive advantages
Tellurian competitive advantages Unmatched experience, proven results Total headcount of ~100 professionals with decades of industry experience at Cheniere, BG Group and others Collectively, our team has constructed ~55 mtpa (20%) of liquefaction capacity worldwide, all delivered on schedule Founder
Slide 11: Tellurian Timeline
Tellurian Timeline Significant value creation expected in the next 12 months Note:(1) LSTK represents lump sum turnkey Engineering Bechtel engaged to complete robust FEED Feb/16 LSTK(1) EPC contract expected mid-2017 Notice to Proceed with construction expected mid-2018 Driftwood LNG first LNG cargo
Slide 12: Conclusions
Conclusions Global market needs environmentally beneficial and reliable natural gas U.S. is best positioned to meet supply needs with abundant low-cost gas, and the resources to build low-cost liquefaction LNG prices > $5.50 per MMBtu at the Gulf Coast Marker give the signal that additional liquefac
Slide 13: Expected to produce first LNG in 2022
Expected to produce first LNG in 2022 Driftwood LNG Artist Rendition
Slide 14: Contact us
Contact us = Amit Marwaha = Joi Lecznar Director, Investor Relations & Finance SVP, Public Affairs & Communication +1 832 485 2004 +1 832 962 4044 amit.marwat ianinc.com [email protected] W @TellurianLNG
Slide 15: Appendix: Leadership team, partners and capital structure
Appendix Leadership team, partners and capital structure
Slide 16: Board of Directors
Board of Directors Dillon J. Ferguson, Director, Chairman of Governance Committee Dillon J. Ferguson is a partner at Pillsbury Winthrop Shaw Pittman LLP in its energy and litigation practices, focusing his practice on oil and gas law, with an emphasis on both transaction and litigation matters. His
Slide 17: Leadership team
Leadership team ‘Meg Gentle, CEO and President mer England Keith Teague, Chief Operating Officer + Former EVP, Texas Daniel Belhumeur, General Counsel = Former VP, Tax and General Tax Counsel of Cheniere Energy Antoine Lafargue, Chief Financial Officer . 9 = Prior roles in M&d Tarek Souki, SVP LNG M
Slide 18: Leadership team
Leadership team Howard Candelet, SVP Projects Joined Telluri Mark Evans, SVP Gas Supply = Spent gy i tit 10 year Margie Harris, SVP Chief Human Resources Officer John Howie, President Tellurian Production Company 7 it it it , deploying . founder of Sachs E&P Capital Joi Lecznar, SVP Public Affairs a
Slide 19: Leadership team
Leadership team Joey Mahmoud, President ood Pipeline LLC + Over NG, fractionation Graham McArthur, Treasurer /enture Global LNG, Inc. r . Kurth LLP, Fil general corporate and securities matters é i Pat Outtrim, SVP Government and Regulatory Affairs . permitting, = Assisted it TUS LI . rd Khaled Shar
Slide 20: Key project partners
Key project partners Liquefaction technology World-class cold box manufacturer for all technologies – supplied more than 10,000 brazed aluminum heat exchanger (BAHX) cores – more than 500 for LNG service Driftwood LNG to use the Integrated Pre-cooled Single Mixed Refrigerant (IPSMR®) liquefaction pr
Slide 21: Potential Future Funding Sources
Potential Future Funding Sources Tellurian Inc. (NASDAQ:TELL) Public equity issuance Driftwood Pipeline Project finance debt Project equity Project finance debt Driftwood LNG Tellurian Production Company RBL facility Bonds Equity partners Equity partners Private equity partners Corporate bonds
Slide 22: Appendix: LNG market
Ss Appendix LNG market TELLURIAN
Slide 23: U.S. remains the most flexible and competitive LNG supply solution
U.S. remains the most flexible and competitive LNG supply solution U.S. advantaged as a global energy center Continued expansion of integrated infrastructure defines the most flexible and cost effective energy system in the world Can react quickly to market changes regardless of price direction Cont
Slide 24: LNG market: from surplus to shortfall
LNG market: from surplus to shortfall Source:Wood Mackenzie (Q3 2016) Note:(1) Assumes liquefaction capacity utilization rate of 95%, 90% and 85% in 2021, 2022 and 2023, respectively, and 85% thereafter (2) Driftwood LNG assumed to have liquefaction capacity of ~26 mtpa (3) FID shortfall grossed up
Slide 25: ~100 mtpa of additional liquefaction needed by 2025
~100 mtpa of additional liquefaction needed to meet LNG demand by 2025 Source:Wood Mackenzie (Q1 2017) Note:(1) Actual LNG consumption in 2016 (2) Actual LNG global liquefaction capacity in 2016 (3) Estimate of liquefaction capacity of projects under construction (4) Estimated reduction of liquefact
Slide 26: 12% Growth in Asia / Middle East LNG demand in 2016
12% Growth in Asia / Middle East LNG demand in 2016(1) Source:IHS Markit Waterborne Note:(1) 2016 year-on-year change (2) AME represents Asia and Middle East (2) (2)
Slide 27: Low prices incentivize faster demand growth
Low prices incentivize faster demand growth Asian LNG demand grew significantly over the same period in 2016; lower LNG prices are stimulating demand in Asia YoY demand is up ~12%. If current level of growth continues, markets will be short capacity by 2020, resulting in call on new capacity and hig
Slide 28: The U.S. offers the right product to customers
The U.S. offers the right product to customers Source: IHS Energy. Note: (1) Break-even price estimated based on FOB costs at $50/Bbl.
Slide 29: Fast-growing FSRU market
Fast-growing FSRU market Source: Wood Mackenzie April/2017 Floating Storage Regasification Unit capacity increasing
Slide 30: Spot market under development
Spot market under development Source: GIIGNL 2017 publication, Wood Mackenzie Q1 2017 . Note: (1) Assuming 3 Bcf per cargo and 51 Bcf of gas per mtpa of LNG.
Slide 31: Expiration of existing contracts
Expiration of existing contracts Source: IHS Energy. Note: Based on executed Sale and Purchase Agreements and Liquefaction Tolling Agreements.
Slide 32: Contracts signed in 2016
Contracts signed in 2016 Contracts by duration Contracts by type of supplier Source: GIIGNL (2017). Note: (1) Short term: 4-years or less. (2) Medium term: between 5 and 10 years. (3) Long term: longer than 10 years. (4) Represents sales from portfolio players. (5) Consists of projects that are subj
Slide 33: Points of transition in the LNG market
Three large supply centers Steady non-traditional demand growth Barriers to entry reduced Flexible contracting structures Revocation of destination restrictions Geographic fragmentation LNG index pricing Supply competition Points of transition in the LNG market
Slide 34: Appendix: Terminal
Ss Appendix Terminal TELLURIAN
Slide 35: Driftwood 1,000 acre site unique in Louisiana
Driftwood 1,000 acre site unique in Louisiana Ample construction and laydown space, distinguishes project from others in U.S. Gulf Coast Artist Rendition
Slide 36: Driftwood terminal vs. traditional LNG plant – design
Driftwood terminal vs. traditional LNG plant – design DWLNG layout: 5.2 mtpa Traditional layout: 4.5 mtpa GE LM6000 PF+ (x4): cheapest dollar per installed horsepower = more LNG production per acre Gas pre-treatment facility Chart cold boxes (x4): IPSMR technology uses single mixed refrigerant; desi
Slide 37: Driftwood Project cost competitive
Driftwood Project cost competitive Source: IHS Energy Jan/2017
Slide 38: FERC approval process
Authorization under Section 3 (terminal) and Section 7 (pipeline) of the Natural Gas Act FERC designated as lead agency Oversee siting, construction and operation of LNG facilities by Energy Policy Act 2005 Provide National Environmental Policy Act (NEPA) analysis and develop Environmental Impact St
Slide 39: Appendix: Pipeline
Ss Appendix Pipeline TELLURIAN
Slide 40: Driftwood pipeline
Driftwood pipeline Key facts Length 96 miles Size 48” – 74 miles 42” – 11 miles 36” – 11 miles Capacity(1) ~4.0 Bcf/d Access ~32 Bcf/d flowing gas Capex. ~$1.6 – $2.0 Bn(2) Regulatory FERC Timing Construction planned to begin in 2019 Location Evangeline, LA to Calcasieu, LA Pipeline map Note:Note: A
Slide 41: Driftwood LNG access to prolific resource base
Driftwood LNG access to prolific resource base Source: Platts, EIA (DPR July 2017). Note: Technical recoverable resources per EIA report, April 2015. Major basins provide liquidity, minimize price risk Permian Basin Barnett Basin Haynesville Basin Fayetteville Basin Marcellus Basin Utica Basin Eagle
Slide 42: Driftwood pipeline gas access minimizes risk
Driftwood pipeline gas access minimizes risk Source: EIA, Tellurian. Note: Data refers to resource within operating footprint of Driftwood pipeline (DWPL) &Driftwood LNG (DWLNG) Pipeline capacity refers to combined capacity of pipelines connecting to directly to DWPL Meter stations refers to maximum
Slide 43: Driftwood LNG gas access
Driftwood LNG gas access Optimal mix and resource availability and accessibility 588.3 Tcf of resources 41.3 Bcf/d of daily production 31.8 Bcf/d of pipeline capacity 12.5 Bcf/d of pipeline connections Source: EIA, Tellurian. Note: (1) EIA; Reserves = technical recoverable resources, 2015. (2) EIA D
Slide 44: Southwest Louisiana: core of U.S. exports
Southwest Louisiana: core of U.S. exports Core of U.S. natural gas exports Louisiana Texas Gulf of Mexico Inbound from Perryville 2024 4.8 Bcf/d Inbound from East 2024 3.2 Bcf/d Inbound from Perryville 2024 1.7 Bcf/d Inbound from West 2024 2.0 Bcf/d Inbound to Gillis 2024 4.0 Bcf/d Southwest Louisia
Slide 45: Southwest Louisiana: core of U.S. nat. gas exports
Southwest Louisiana: core of U.S. nat. gas exports Gas production from the Permian expected to increase to ~13 Bcf/d by 2025 with limited export capacity Source: Goldman Sachs. Note: (1) Forecast based on WTI price of $52/Bbl oil, $3.00/mmBtu natural gas; production split of 57% oil, 23% NGLs and 20