MGX Resources Limited · ASX:MGX

MGX Resources — Shareholder Meeting (November 2026)

19 slides from MGX Resources's shareholder meeting presentation, Nov 18, 2026

  1. Slide 1: 2026 Annual General Meeting CEO Presentation

    Slide 1: 2026 Annual General Meeting CEO Presentation

    MGX Resources Limited MGX rsonal use only 2026 Annual General Meeting CEO Presentation 18 November 2026

  2. Slide 2: Disclaimer and Forward-Looking Statements

    Slide 2: Disclaimer and Forward-Looking Statements

    Disclaimer and Forward-Looking Statements rsonal use only This Document may not be reproduced, redistributed or passed on, directly or indirectly, to any other person, or published, in whole or in part, for any purpose without prior written approval from MGX Resources Limited (ASX:MGX). This Documen

  3. Slide 3: Business Overview: Transitioning to build a new presence in Australian Gold

    Slide 3: Business Overview: Transitioning to build a new presence in Australian Gold

    Business Overview Transitioning to build a new presence in Australian Gold rsonal use only Koolan Island ⚫ Established mining company seeking to become a ⚫ Central Tanami new Australian gold producer inside 3 years. Project JV Well funded - strong balance sheet with substantial cash and investment r

  4. Slide 4: Corporate Overview

    Slide 4: Corporate Overview

    Corporate Overview ASX:MGX last 12 months rsonal use only Issued shares 1,180 million shares US$5,415/oz Au US$3,860/oz Au Market capitalisation A$354 million ($0.30/share) Cash/investments A$409 million (30 September 2026) Bank Borrowings Nil Shareholder Distribution (% issued shares) Board and Man

  5. Slide 5: Central Tanami Project JV (CTPJV)

    Slide 5: Central Tanami Project JV (CTPJV)

    Central Tanami Project JV (CTPJV) One of Australia’s higher grade gold development projects rsonal use only 5

  6. Slide 6: Central Tanami Project JV: A major gold development opportunity

    Slide 6: Central Tanami Project JV: A major gold development opportunity

    Central Tanami Project JV (CTPJV) A major gold development opportunity rsonal use only 50/50 joint venture between MGX and Tanami Gold NL (ASX:TAM). Mineral Resources (JORC 2012) of 2.8 Moz gold (31 Mt at 2.8 g/t Au), including 1.2 Moz (11 Mt at 3.3 g/t Au) in the high grade Groundrush deposit.* Mos

  7. Slide 7: Prospective mine corridor from Groundrush to Jims

    Slide 7: Prospective mine corridor from Groundrush to Jims

    Central Tanami Project JV Prospective mine corridor from Groundrush to Jims rsonal use only ML168 ML167 ML33760 ML22934 Produced 122,000oz Produced 541,000oz Produced 725,000oz Produced 611,000oz 65km ML167 ML33760 Central Tanami Jims Dogbolter ProducedLegs 541,000oz Funnelweb Carbine ProducedMiracl

  8. Slide 8: Groundrush Gold Deposit: Underground exploration decline under construction

    Slide 8: Groundrush Gold Deposit: Underground exploration decline under construction

    Groundrush Gold Deposit Underground exploration decline under construction rsonal use only • Located on a granted mining lease, 41km north of the existing CTPJV plant site via a sealed haul road. • Previous open pit gold production (Newmont) of +0.6 Moz at an average grade of 4 g/t Au in 2001-2005.

  9. Slide 9: Groundrush Gold Deposit: Exploration decline design

    Slide 9: Groundrush Gold Deposit: Exploration decline design

    Groundrush Gold Deposit Exploration decline design NW SE rsonal use only Portal locations Existing open pit (1.4km long) Proposed underground Proposed mine design underground mine design 0 100m Proposed underground mine design • The underground decline comprises 3.5km of lateral development to 350m

  10. Slide 10: Groundrush Gold Deposit: Underground exploration decline underway

    Slide 10: Groundrush Gold Deposit: Underground exploration decline underway

    Groundrush Gold Deposit Underground exploration decline underway rsonal use only Drilling the first cut into the Groundrush Central portal 10

  11. Slide 11: Groundrush Gold Deposit: Central and ventilation portals established

    Slide 11: Groundrush Gold Deposit: Central and ventilation portals established

    Groundrush Gold Deposit Central and ventilation portals established rsonal use only Central Portal after initial blast Ventilation Portal 11

  12. Slide 12: Jims Gold Deposit: Potential to build existing Resources

    Slide 12: Jims Gold Deposit: Potential to build existing Resources

    Jims Gold Deposit Potential to build existing Resources • Located on a granted mining lease, 23km south of the existing CTPJV • Metallurgically free-milling with further testwork underway to rsonal use only plant site. confirm ~90% carbon-in-leach recoveries. • Current Mineral Resource estimate of 2

  13. Slide 13: Key development activities for FY27

    Slide 13: Key development activities for FY27

    Central Tanami Project JV Key development activities for FY27 rsonal use only • Groundrush decline construction for subsequent infill drilling to convert Inferred to Indicated Resources. • Resource definition drilling at the Jims Gold Deposit. • Updates to Mineral Resource Estimates. • Mining optimi

  14. Slide 14: Koolan Island: A clean exit from iron ore

    Slide 14: Koolan Island: A clean exit from iron ore

    Koolan Island A clean exit from iron ore after two decades of production rsonal use only 14

  15. Slide 15: Koolan Island divestment

    Slide 15: Koolan Island divestment

    Koolan Island divestment Facilitating a focus on creating a new precious metals business rsonal use only • Agreement signed to divest Koolan Island to logistics group Crestlink to repurpose key infrastructure for a future logistics hub (refer ASX release dated 11 June 2026). • MGX to receive at leas

  16. Slide 16: Koolan Island: Main Pit rehabilitation works

    Slide 16: Koolan Island: Main Pit rehabilitation works

    Koolan Island Main Pit rehabilitation works Preparations to blast cut in pit wall to flood Main Pit, rsonal use only October 2026 16

  17. Slide 17: Koolan Island: Main Pit Rehabilitation Flooding Completed

    Slide 17: Koolan Island: Main Pit Rehabilitation Flooding Completed

    Koolan Island Main Pit Rehabilitation Flooding Completed rsonal use only Main Pit after flooding, 28 October 2026. 17

  18. Slide 18: 2026 Annual General Meeting

    Slide 18: 2026 Annual General Meeting

    2026 Annual General Meeting MGX rsonal use only Courage Integrity Safety Agility Respect Presentation authorised by Peter Kerr, Chief Executive Officer MGX Resources Limited CTPJV Airstrip, August 2026 +61 (0)8 9426 7500 www.mgx.com.au 18

  19. Slide 19: Appendix: CTPJV Mineral Resource Estimate (JORC 2012)

    Slide 19: Appendix: CTPJV Mineral Resource Estimate (JORC 2012)

    Appendix 1 CTPJV Mineral Resource Estimate (JORC 2012) - 100% basis (MGX 50%, TAM 50%) Measured Indicated Inferred Total Notes rsonal use only OP & UG COG Tonnes Grade Ounce s Tonnes Grade Ounces Tonnes Grade Ounce s Tonnes Grade Ounces Deposits (000's) (g/t) (000's) (000's) (g/t) (000's) (000's) (g

Source: ASX announcement, Nov 18, 2026