Australian Pacific Coal Limited · ASX:AQC

Australian Pacific Coal — Corporate Update (April 2018)

29 slides from Australian Pacific Coal's corporate update, Apr 18, 2018

  1. Slide 1: Dartbrook Community Consultative Committee Meeting

    Dartbrook Community Consultative Committee Meeting 18th April 2018

  2. Slide 2: Agenda

    AGENDA 1. Apologies 2. Declaration of Pecuniary Interest 3. Correspondence 4. Confirmation of previous minutes 5. Actions from previous minutes 6. Business Arising – MOP, Annual Review, Hunter River Monitoring, Planning Applications 7. General Business: – Complaints & Incidents Summary – Regulatory

  3. Slide 3: Actions from previous minutes

    Actions from previous minutes Action Item Action Outcome 1. To report re Dartbrook’s independent Chairperson. SB to update 2. That relevant information continues to go to the CCC DW sent out members prior to the CCC meeting. available pre‐ meeting info 3. To report on the proposed additional backgro

  4. Slide 4: Business Arising

    BUSINESS ARISING 1. Mining Operations Plan  DRG approved the MOP on 18 December 2017  Approved MOP document is available on the AQC website 2. Annual Review 2017  Finalised and lodged with regulators before end of March 2018 as required  The Annual Review has been provided electronically to CCC

  5. Slide 5: Business Arising continued

    BUSINESS ARISING continued 3. Hunter River Monitoring Program  Program developed with expert input from Cumberland Ecology & WRM Water & Environment in consultation with DoI‐Water  Monitoring is proposed to be undertaken at 12 sites:  Four existing surface water quality monitoring locations; and

  6. Slide 6: Proposed River Health Monitoring Locations

    BUSINESS ARISING – continued Proposed River Health Monitoring Locations 6

  7. Slide 7: Business Arising continued

    BUSINESS ARISING continued 4. Underground Modification  An Environmental Assessment (EA) is being prepared to support the Modification application for the re‐ commencement of underground mining on site  The EA is planned to be submitted by mid‐June 2018 for public exhibition  Consultation with DP

  8. Slide 8: Complaints and Incidents

    GENERAL BUSINESS – Complaints and Incidents  No environmental complaints or incidents have been recorded since the previous CCC meeting 8

  9. Slide 9: Regulatory Consultation

    GENERAL BUSINESS – Regulatory Consultation  Applications to DoI‐Water in March for the development of 13 additional groundwater monitoring bores  Meeting with DoI‐Water held in April to discuss the Hunter River monitoring and exploration programs 9

  10. Slide 10: Proposed Groundwater Monitoring Bores

    GENERAL BUSINESS – Regulatory Consultation continued Proposed Groundwater Monitoring Bores 10

  11. Slide 11: Exploration Program

    GENERAL BUSINESS – Exploration Program  Exploration applications submitted to DRG in March for:  Proposed development of 10 exploration drill holes; and  Rehabilitation of 26 drill hole sites which were installed in the early 1980s  Program scheduled to commence in late April  DRG visited site

  12. Slide 12: Proposed Exploration Program

    GENERAL BUSINESS – Exploration Program continued Proposed Exploration Program 12

  13. Slide 13: Environmental Monitoring

    GENERAL BUSINESS – Environmental Monitoring  Rainfall  High Volume Air Sampling  Dust Deposition  Dust Isopleth  Surface Water – Hunter River Salinity  Surface Water – Dart Brook Salinity  Greenhouse gas 13

  14. Slide 14: Environmental Monitoring continued

    GENERAL BUSINESS – Environmental Monitoring continued 2017 yearly rainfall = 406.2 mm Dartbrook average yearly rainfall 1995‐2017= 586 mm 14

  15. Slide 15: Environmental Monitoring continued

    GENERAL BUSINESS – Environmental Monitoring continued PM10 (Particulate Matter <10µm) NEPC guideline limit is 50ug/m3 15

  16. Slide 16: Environmental Monitoring continued

    GENERAL BUSINESS – Environmental Monitoring continued PM10 (Particulate Matter <10µm) NEPC guideline limit is 50ug/m3 16

  17. Slide 17: Environmental Monitoring continued

    GENERAL BUSINESS – Environmental Monitoring continued Insoluble Matter is Ash + Combustible Matter Ash is more representative of dust component, remainder is typically organic matter (e.g. insects) Annual average below limit of 4g/m2/month at all sites 17

  18. Slide 18: Environmental Monitoring continued

    GENERAL BUSINESS – Environmental Monitoring continued 18

  19. Slide 19: Environmental Monitoring continued

    GENERAL BUSINESS – Environmental Monitoring continued 19

  20. Slide 20: Environmental Monitoring continued

    GENERAL BUSINESS – Environmental Monitoring continued 20

  21. Slide 21: Environmental Monitoring continued

    GENERAL BUSINESS – Environmental Monitoring continued 21

  22. Slide 22: Environmental Monitoring continued

    GENERAL BUSINESS – Environmental Monitoring continued Scope 2 Scope 1 Emissions Emissions Total Emissions Date Carbon Nitrous Methane Carbon Dioxide (t CO2-e) Dioxide Oxide (t CO2-e) (t CO2-e) (t CO2-e) (t CO2-e) Jan-17 4,420 811 0.01 395 5,627 Feb-17 425* 531 0.02 379 1,335 Mar-17 2,047 630 0.01 42

  23. Slide 23: Dartbrook Care & Maintenance – Land management

    DARTBROOK CARE & MAINTENANCE – Land management 23

  24. Slide 24: Land management continued

    DARTBROOK CARE & MAINTENANCE – Land management continued  Dairy upgrade complete  Weed treatment, including for:  Broadleaf weeds and liverseed grass on paddocks sown to oats  Green cestrum control on river bank  Prickly pear on the East Site 24

  25. Slide 25: Land management continued

    DARTBROOK CARE & MAINTENANCE – Land management continued  Grazing stock on the REA (61 cows with calves)  Pig & Roo control program continued:  2017 program culled 91 Roos (site had NPWS licence for 200)  No pig sightings during 2017  Dog baiting in conjunction with LLS

  26. Slide 26: Community Consultation

    DARTBROOK CARE & MAINTENANCE – Community Consultation  Ongoing consultation:  Newsletter No 6 will be out next week  Dartbrook Sponsorship & Donations Initiative continues to call for Applications http://www.aqcltd.com/irm/content/sponsorships.aspx?RID=463  Consultation over recent sponsorships

  27. Slide 27: Other Business

    OTHER BUSINESS • Business for the next meeting

  28. Slide 28: Next 2018 Meeting Date

    Australian Pacific Coal AGW SEOENTOGNRE ATT CORT ant 2018 January February March April Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su 123 4 5 6 7F7 123 4 123 4 1 8 9 10 11 12 13 14 5 6 7 8 9 1011 5 6 7 8 9 10 11 23 45 67 8 15 16 17 18 19 20 21 12 13 14 15 16 17 1

  29. Slide 29: Thank You

    THANK YOU 29

Australian Pacific Coal — Corporate Update (April 2018) on 6ix