UK Oil & Gas PLC · LSE:UKOG

UK Oil & Gas — Investor Presentation (July 2022)

34 slides from UK Oil & Gas's investor presentation, July 2022

  1. Slide 1: Corporate Presentation June/July 2022

    Slide 1: Corporate Presentation June/July 2022

    Corporate Presentation June/July 2022 Isle of Portland, Dorset, site of UKOG’s new Energy Hub

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer The information contained in this confidential document (the “Presentation”) has been prepared by UK Oil & Gas Plc (the “Company” or “UKOG”)) solely for informational purposes. It has not been fully verified and is subject to material updating, completion, revision, verification and furth

  3. Slide 3: Disclaimer (cont.)

    Slide 3: Disclaimer (cont.)

    Disclaimer (cont.) deal, or attempt to deal, in financial instruments (as defined in MAR) relating to that information, or encourage another person to deal or disclose the information before the inside information is made public; (ii) or cancel or amend an order which has already been placed concern

  4. Slide 4: UKOG: Expanding UK & international energy company

    Slide 4: UKOG: Expanding UK & international energy company

    UKOG: Expanding UK & international energy company United Kingdom: • Oil & gas, established portfolio: 2 producing fields, 5 licences, largest licence holder in SE England 488.5 km2 • NEW: Consent granted for 100% owned Loxley gas appraisal project, 44 bcf mean gross recoverable (UKOG net 34 bcf) • A

  5. Slide 5: Portland: Future material UK energy storage

    Slide 5: Portland: Future material UK energy storage

    Portland: Future material UK energy storage 5

  6. Slide 6: Portland: Future hydrogen-ready energy storage project

    Slide 6: Portland: Future hydrogen-ready energy storage project

    Portland: Future hydrogen-ready energy storage project “UKOG is delighted to announce the intention to develop an infrastructure project in Dorset, fully in keeping with the government’s new British Energy Security and Hydrogen Strategies, that could both materially strengthen the UK energy system’s

  7. Slide 7: Portland H2: Support from Rt Hon Kwasi Kwarteng MP, SoS BEIS

    Slide 7: Portland H2: Support from Rt Hon Kwasi Kwarteng MP, SoS BEIS

    Portland H2: Support from Rt Hon Kwasi Kwarteng MP, SoS BEIS “… hydrogen’s ability to store energy for long periods of time and in large quantities is central to its strategic value to a fully decarbonised energy system and we envisage hydrogen storage being a key part of future network infrastructu

  8. Slide 8: Portland LNG: Support from Rt Hon Kwasi Kwarteng MP, SoS BEIS

    Slide 8: Portland LNG: Support from Rt Hon Kwasi Kwarteng MP, SoS BEIS

    Portland LNG: Support from Rt Hon Kwasi Kwarteng MP, SoS BEIS “It is also good to hear about the future inclusion of green hydrogen production and the Liquefied Natural Gas (LNG) import facility as part of the integrated Energy Hub. Meeting our world leading Net Zero targets will mean major shifts i

  9. Slide 9: Portland: The planned new £1+ billion Energy-Hub for Britain

    Slide 9: Portland: The planned new £1+ billion Energy-Hub for Britain

    Portland: The planned new £1+ billion Energy-Hub³ for Britain • Construction of 43 bcf (1.2 bcm) of hydrogen-ready salt cavern storage¹ • Material 70% increase in UK's reported 61 bcf (1.7 bcm) working underground gas storage capacity² • Storage could be doubled via additional salt caverns located u

  10. Slide 10: Portland: Underground energy storage in salt caverns

    Slide 10: Portland: Underground energy storage in salt caverns

    Portland: Underground energy storage in salt caverns • Salt caverns are artificial cavities which are created in geological salt deposits. Salt is an impermeable rock unit capable of safely containing hydrogen and natural gas. Caverns are created by first drilling into the salt before injecting wate

  11. Slide 11: Portland: Storage is a key component of UK hydrogen strategy

    Slide 11: Portland: Storage is a key component of UK hydrogen strategy

    Portland: Storage is a key component of UK hydrogen strategy National Grid’s 2021 Future Energy Consumer Transformation Scenario; green hydrogen made with renewable electricity via electrolysis, is stored until needed at times of peak demand, to generate power to keep the lights on and for heating v

  12. Slide 12: Portland's envisaged key role in UK Southern Pathway Hydrogen/Energy Hub

    Slide 12: Portland's envisaged key role in UK Southern Pathway Hydrogen/Energy Hub

    Portland’s envisaged key role in UK Southern Pathway Hydrogen/Energy Hub S. Pathway + Dorset green H₂ could supply approx. 6.5% of UK Hydrogen need in 20501 Import/export to UK Electric Power grid Renewable Electric Power Energy Consumers Electricity Floating Wind Farm 3.9GW Potential Capacity Portl

  13. Slide 13: Portland Energy-Hub: Indicative timeline

    Slide 13: Portland Energy-Hub: Indicative timeline

    Portland Energy-Hub: Indicative timeline YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 YEAR 10 YEAR 11 NSIP planning application Development Consent Order (DCO) by SoS Discharge DCO conditions Engineering design and procurement Drilling pad construction Drill 14 cavern wells: 2 rigs

  14. Slide 14: Portland: Next steps

    Slide 14: Portland: Next steps

    Portland: Next steps • Review and update commercial and economic models for hydrogen storage • Select supporting third party companies • Carry out engineering studies, surface and subsurface, to update the previous 2008 gas storage development for green hydrogen production & storage plus LNG import

  15. Slide 15: Loxley gas field appraisal project

    Slide 15: Loxley gas field appraisal project

    Loxley gas field appraisal project 15 Drone footage of Loxley site & access track looking westwards

  16. Slide 16: Loxley gas discovery overview

    Slide 16: Loxley gas discovery overview

    Loxley gas discovery overview • Significant mean case gross gas initially in place 63 billion cubic feet (bcf)1 • 44 bcf (UKOG net 34 bcf) estimated to be recoverable to surface via future production • Ranks in top 3 of UK onshore gas field discoveries² • Planned to align with the government's state

  17. Slide 17: Loxley: Location

    Slide 17: Loxley: Location

    Loxley: Location Loxley gas discovery CF-1 HH Oil field Loxley-1 GB-1 Gas field GB-2 &2z A-1 NSTA licensed block GB = Godley Bridge A = Alfold BB-1 HH = Horse Hill CF = Collendean Farm BB = Broadford Bridge Source: 1. https://ukogl.org.uk/, UKOG internal 2020 17

  18. Slide 18: Loxley: Significant discovered gas volumes

    Slide 18: Loxley: Significant discovered gas volumes

    Loxley: Significant discovered gas volumes GIIP (bcf) Low Mid Mean High Gross Portland Sandstone 33 59 63 98 PEDL234 27 46 49 76 Recoverable resources (bcf) Low Mid Mean High Gross Portland Sandstone 23 41 44 70 PEDL234 18 32 34 54 Having confirmed that the inputs used for the assessment of GIIP are

  19. Slide 19: Loxley gas accumulation: gross thickness of gas bearing zone

    Slide 19: Loxley gas accumulation: gross thickness of gas bearing zone

    Loxley gas accumulation: gross thickness of gas bearing zone Loxley-1 target zone: gas column thickness >100 ft PEDL235 PEDL234 (orange & red area) A281 Dunsfold Aerodrome Loxley-1 0.7 km to GB-1 target (19’ gas) GB-2 GB-2z (0’ gas) (0’ gas) Gas water contact = 0’ gas B2130 A-1 i.e. defines limit of

  20. Slide 20: N-S cross section along Loxley-1 & 1z trajectory

    Slide 20: N-S cross section along Loxley-1 & 1z trajectory

    N-S cross section along Loxley-1 &1z trajectory North A Loxley-1&1z A-1 B South Loxley -1 target A-1 Minimum 100 ft gas 26’ gas Loxley-1z horizontal sidetrack dashed line Gas (red) depth (ft) Portland Sandstone Secondary objective A 1 km Loxley-1 3 km GB-1 GB-2 GB-2z A-1 10,000 ft B 20 Source: UKOG

  21. Slide 21: Loxley site production wells could drain main gas accumulation

    Slide 21: Loxley site production wells could drain main gas accumulation

    Loxley site production wells could drain main gas accumulation Loxley-1 target zone: gas column thickness >100 ft (orange & red area) A281 1-1.5 km horizontal drain within gas target zone PEDL235 PEDL234 Loxley-1 0.7 -1 km to target 2-2.5 km with horizontal Legacy wells Loxley-1 surface location 2 k

  22. Slide 22: Loxley: Next steps

    Slide 22: Loxley: Next steps

    Loxley: Next steps • Discharge pre-commencement planning conditions • Tender site construction, drilling and related services • Construct well site and access track • Procurement of drilling long lead items • Drill and test Loxley-1 and 1z sidetrack appraisal wells 22

  23. Slide 23: Turkiye: Basur-Resan appraisal project

    Slide 23: Turkiye: Basur-Resan appraisal project

    Turkiye: Basur- Resan appraisal project 23

  24. Slide 24: SE Turkiye: A far more prolific oil province than UK Weald Basin

    Slide 24: SE Turkiye: A far more prolific oil province than UK Weald Basin

    SE Turkiye: A far more prolific oil province than UK Weald Basin • SE Turkiye has 18 times more produced & proven oil than the entire UK Weald Basin (572 mmbbl vs. 32 mmbbl) • The area between Resan and the giant Kurdistan Region of Iraq oil fields remains largely unexplored • SE Turkiye has signifi

  25. Slide 25: SE Turkiye: Basur-Resan anticline and oil discovery

    Slide 25: SE Turkiye: Basur-Resan anticline and oil discovery

    SE Turkiye: Basur-Resan anticline and oil discovery • Basur-Resan is a significant asymmetric anticline with surface expression confirmed by seismic. Maximum extent c. East Sadak oil field 70 km². Updip from lookalike E. Sadak Basur-Resan producing field geological lookalike • Basur-1 is reported to

  26. Slide 26: Basur-3: Pre-drill interpretation on legacy seismic

    Slide 26: Basur-3: Pre-drill interpretation on legacy seismic

    Basur-3: Pre-drill interpretation on legacy seismic SW NE • Basur-3 well trajectory planned based on legacy seismic line. The data shows B3 Orig. Prognosis target Garzan/Beloka to be updip of B-1 B2 B1 oil discovery • The quality of the seismic imaging towards the NE is poor as it lies at the Top Ge

  27. Slide 27: Basur-3: Post-drill structural interpretation on new seismic

    Slide 27: Basur-3: Post-drill structural interpretation on new seismic

    Basur-3: Post-drill structural interpretation on new seismic SW NE • New seismic line revealed the presence of a major backthrust fault to the north B3 actual & of Basur-1. Imaging/processing of prior proposed B-3S (dashed ) B2 B1 legacy seismic was incorrect • Fault seen at surface is in fact a hig

  28. Slide 28: Basur: Top reservoir depth map

    Slide 28: Basur: Top reservoir depth map

    Basur: Top reservoir depth map (m below mean sea level) 41˚API Oil seep T1 31.5˚API oil& water to surface from Garzan, Mardin/Beloka not penetrated New top reservoir map generated using new phase-1 seismic and legacy data. K1 dry hole B101- shows, B3-reservoir not reached not tested B1-flowed 500 bb

  29. Slide 29: Basur oil seep found 2022, 4m below surface

    Slide 29: Basur oil seep found 2022, 4m below surface

    Basur oil seep: found 15/06-03/07 2022, 4m below surface, 41.7˚ API gravity unused shot hole location along seismic line 002. new 15.5-16.5m shot hole drilled on 17/06/22, 8m E&W of line 002 (diam.) (depth) Source: UKOG RNS 30 June 2022, AME June 2022.

  30. Slide 30: SE Turkiye: Rapid monetisation in under 1 year possible

    Slide 30: SE Turkiye: Rapid monetisation in under 1 year possible

    SE Turkiye: Rapid monetisation in under 1 year possible • Rapid monetisation, months versus years in UK • UK 4-5 year wait to long term production erodes ~40% of project net present value • AME’s E. Sadak field in production within 1 month of well finish, official production consent in 7 months • Ri

  31. Slide 31: UK: Horse Hill oil field

    Slide 31: UK: Horse Hill oil field

    UK: Horse Hill oil field Source: UKOG 31

  32. Slide 32: Horse Hill: Unlocking future value

    Slide 32: Horse Hill: Unlocking future value

    Horse Hill: Unlocking future value Convert HH-2z into a water re-injection well • This will realise water disposal cost savings ~ £20-25k/month and assist in reservoir pressure support and oil recovery • EA permit and NSTA approval is in place. • Further upgrades at site planned 3D seismic acquisiti

  33. Slide 33: Horse Hill: Harnessing geothermal heat energy under our feet

    Slide 33: Horse Hill: Harnessing geothermal heat energy under our feet

    Horse Hill: Harnessing geothermal heat energy under our feet Horse Hill site repurposed to include/deliver green geothermal heat @150-200˚C to surface via downhole heat exchangers • 6 x 5,000-7,000m new wells • Utilising heat exchangers/pumps • ~25 MW of heat baseload • Baseload over 8,760 hours/yea

  34. Slide 34: Estimated use of funds, corporate structure & management team

    Slide 34: Estimated use of funds, corporate structure & management team

    Estimated use of funds, corporate structure & management team Estimated Use of Funds £ million • Stephen Sanderson (CEO) - A highly-experienced petroleum geologist, oil industry veteran and upstream energy business leader, with over 30 years Portland (Initial planning & studies, pre-FEED) 1.0 operat

Source: Internet Archive copy of ukogplc.com

More decks from UK Oil & Gas PLC