Centrica Plc · LSE:CNA

Centrica — UBS Electricity and Gas Seminar (June 2006)

13 slides from Centrica's conference presentation, Jun 22, 2006

  1. Slide 1: UBS Electricity and Gas Seminar

    UBS Electricity and Gas Seminar Ian Wood Commercial Director Centrica Energy

  2. Slide 2: Contents

    CONTENTS • Oil price uncertainty • Delivery of new gas import infrastructure • Impact of carbon on generation investment • Outlook for new nuclear and clean coal • Need for new build CCGT • Commodity price convergence and the value of diversity • Concluding comments 1

  3. Slide 3: Uncertainty on medium term on oil prices

    Uncertainty on medium term on oil prices 70 Barcalys Cap Broker Credit 65 CAIC Citigroup Citigroup - WTI 60 Commodity Standards Chartered CSFB Daiw a 55 Deutsche Bank Economist Intelligence Unit $/bbl 50 EIA High EIA Low EIA Reference 45 Goldman Sachs JP Morgan 40 Merill Lynch Global Energy (US ligh

  4. Slide 4: New UK Import Infrastructure will help to ease supply/demand balance

    New UK Import Infrastructure will help to ease supply/demand balance Tampen link to FLAGS: 4 BCM capacity by Oct-2007 Contract awarded Langeled: 27 BCM capacity by end-2006 Connection to Ormen Lange gas field end-2007 Onshore link built at Easington Anglesey Up to 20 BCM BBL: from 2008 16 BCM capaci

  5. Slide 5: Q1 UK Supply Availability vs Demand

    Q1 UK Supply Availability vs Dem and (storage excluded from supply and dem and - circa 2.5 BCM ) 60 50 40 BCM 30 20 10 0 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 /0 /0 /0 /0 /0 /1 /1 /1 /1 /1 /1 /1 /1 /1 /1 /2 /2 /2 /2 /2 /2 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Indigenous

  6. Slide 6: Carbon market oversupply will reinforce need for tight Phase II allocations

    Carbon market oversupply will reinforce need for tight Phase II allocations PHASE I Price History of phase I and phase II EUA trading • Recent price volatility due to oversupply of carbon 35 • Not certain that Phase I recovery will last 30 25 PHASE II 20 • Phase I is a learning phase €/t • Now bette

  7. Slide 7: Long-Term Carbon market is a key driver of future choices

    Long-Term Carbon market is a key driver of future choices • Need for a long-term carbon price signal: – Governments and EC recognise long-term investments in carbon reductions can only happen if long term carbon mechanism – UK Gov’t 60% reduction target by 2050 – Potential for multilateral signals o

  8. Slide 8: Nuclear New Build?

    Nuclear New Build? • New nuclear capacity could play an important role in the generation sector given its low carbon nature • There are some fundamental issues that need to be addressed for new build nuclear to be a viable option: – Long term solution for waste disposal – Funding of decommissioning

  9. Slide 9: Power reserve margins moving to historic lows

    Power reserve margins moving to historic lows Declining Reserve Margins: Potential Nuclear, England and Wales Coal and Oil Plant Closures 25.0% 25 Closures without Nuclear life extension 20.0% 20 Industry view on Plant closure (GW) required Margin 15.0% 15 No new build 10.0% 10 Plant Closures 5.0% 5

  10. Slide 10: Will new coal replace the capacity shortfall?

    Will new coal replace the capacity shortfall? • All significant new entry, since 1990 has been gas-fired CCGTs • New drive for renewable generation, but deployment will be limited to levels determined by Renewables Obligation • Sustained high, volatile gas prices have challenged dominance of gas • N

  11. Slide 11: Gas-fired generation: UK NBP Spark Spreads

    Gas-fired generation UK NBP Spark Spreads • Available and proven 16 technology Clean 14 Standard • Lower risk with respect to carbon 12 New Build Spark Spread £/MWh Mid Market price 10 • Clean spark spreads 8 widening in the 6 forward market • Combined with benefit 4 of free allowances in 2 Phase 2,

  12. Slide 12: Carbon makes energy commodities increasingly interrelated over long-term

    Carbon makes energy commodities increasingly interrelated over long-term, but with significant short-term dislocations likely +/- 10p/therm +/- $15/bbl Gas ~£7/MWh ~ 10p/therm Oil +/- €10/tonne Electricity ~£3/MWh Carbon +/- $10/tonne ~£2/MWh Coal Portfolio diversity protects against short-term disl

  13. Slide 13: Conclusions

    CONCLUSIONS • Significant oil price uncertainty and gas security concerns – but massive increases in UK import infrastructure suggests premium over oil/continent unsupported • Overallocation has created short-term carbon price uncertainty – but we fundamentally believe that carbon will have an incre

Centrica — UBS Electricity and Gas Seminar (June 2006) on 6ix