Equus Mining — Investor Presentation (May 2019)
10 slides from Equus Mining's investor presentation, May 2019
Slide 1: Driving Exploration Success at Precious Metal Discovery, Southern Chile
Driving Exploration Success at Precious Metal Discovery, Southern Chile ASX Code: EQE May 2019
Slide 2: Disclaimer and Compliance
Disclaimer and Compliance This presentation has been prepared by Equus Mining Limited ABN 44 065 212 679 (“Equus”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived from third parties, th
Slide 3: Why Invest in Equus Mining?
Why Invest in Equus Mining? THESIS: Control newly discovered Los Domos & Cerro Diablo epithermal Gold-Silver projects both optimally located in Chile near underutilised mine infrastructure in the north-east extension of the world-class, Deseado Massif Gold-Silver mineral province Projects host
Slide 4: Corporate Profile
Corporate Profile ASX code EQE Top 5 shareholders Shares on Issue 897.3M GT Management/Ringwood 10.7% Market Cap (@ $0.01) $8.97M Permgold/Altinova 7.4% HSBC/Rigi Investments (Mark Lochtenberg) 4.1% Augusta Enterprises 3.7% Terrane Minerals SpA (Assoc with Damien Koerber) 3.2% Board/Key Management O
Slide 5: Experienced Board and Management
Experienced Board and Management Mark Lochtenberg • Bachelor of Law (Hons) degree from Liverpool University, U.K. 30 years in the resources industry Glencore International, Baralaba Coal Company, Deutsche bank, Hansen Neuerburg, Peko Wallsend Chairman • Previously Director of Cumnock Coal, United Co
Slide 6: Los Domos Project- building on recent discovery
Los Domos Project- building on recent discovery • Large 3km x 6km, high-grade gold-silver ± base metal epithermal district 20km along trend of Cerro Bayo Mine • Targeting +1 Moz Au eq resource potential along 10 principal vein trends extending +12km • Low-Intermediate Sulphidation style mineraliza
Slide 7: Cerro Diablo Project- primed for maiden drill testing
Cerro Diablo Project- primed for maiden drill testing • Recently discovered, located 25km along trend from Cerro Bayo Mine never previously drilled nor systematically explored Priority • Large scale 1.2km x 2.1km precious-base metal Drill epithermal system hosted in Jurassic aged volcano- sediment
Slide 8: Projects Located Within Prolific Deseado Massif
Projects Located Within Prolific Deseado Massif • Los Domos and Cerro Diablo projects located in northwest extension of world class Deseado Massif mineral province in southern Chile province currently hosts 7 operating gold-silver mines • Includes the Santa Cruz Province mining district in Argenti
Slide 9: Projects located close to Mill Infrastructure
Projects located close to Mill Infrastructure • Both projects potentially within trucking distance to Mandalay Resource´s Cerro Bayo mine infrastructure • Cerro Bayo nominal flotation /mill capacity 500ktpa on care and maintenance since mine flooding event in June 2017 • Cerro Bayo historic product
Slide 10: Appendix 1
Appendix 1 Los Domos and Cerro Diablo Project Competent Person Statement The information in this report that relates to Exploration Results for the Los Domos Gold-Silver project is based on information compiled by Damien Koerber. Mr Koerber is a fulltime employee to the Company. Mr Koerber is a Memb