Ramelius Resources Limited · ASX:RMS
Ramelius Resources — Investor Presentation (November 2004)
23 slides from Ramelius Resources's investor presentation, Nov 25, 2004
Slide 1: Ramelius Resources Limited Broker Presentation 2004
Slide 2: Capital Structure
CAPITAL STRUCTURE (As at 31°' August 2004) RAMELIUS ISSUED CAPITAL 59,016,275 fully paid ordinary shares 23,185,750 options (18.687c) Expire 31°' Dec 07 QUOTED SECURITIES 44,739,123 fully paid ordinary shares 12,897,175 options (18.687c) Expire 31°t Dec 07 TOP TEN SHAREHOLDERS % Beach Petroleum Ltd
Slide 3: Company Overview
COMPANY OVERVIEW suff Wy © DIRECTORS BOB KENNEDY (CHAIRMAN) JOE HOULDSWORTH (MANAGING DIREC TOR) REG NELSON (NON EXECUTIVE DIRECTOR) © COMPANY MANAGEMENT & CONTRACTORS DOM FRANCESE (COMPANY SECRETARY) GORDON DUNBAR (CONSULTING GEOLOGIST) ALAN RUDD (GOLDFIELDS EXPLORATION MANAGER) YVONNE WEISSGERBER
Slide 4: Current Projects
CURRENT PROJECTS RAMELIUS D Porter Mange Wi-Aar a Fant Kalgoorte . AL coonevsie AY Logme Ve au GOLD RESOURCES - DRILL TARGETS - BLAGK GAT WATTLE DAM {7800PROSPECT) WATTLE DAM (x3) NORTH WIDGIE (x4) HILDITGH ADVANCED EXPLN.- WATTLE DAM NORTH WIDGIE PARKER RANGE GREENFIELDS - LOGANS FIND IDA FAULT NIC
Slide 5: Spargoville Regional Project Area
RAMELIUS " SPARGOVILLE REGIONAL PROJECT AREA ~ WATTLE | 280 km? in area ~ *o Fh Premier | 30 kms strike lenath of the gold belt a A Reward % ‘3 HILDITGH _ PROJECT e A > WATTLE DAM GOLD PROJECT ee" | NorTH Resource Delineated at 7800N Prospect. WIDGIE BLoek | “dvanced and Routine Exploration programm
Slide 6: Geochemistry Image and Tenure
GEOCHEMISTRY IMAGE and TENURE 4 SPARGOVILLE if REGIONAL GOLD IN SOIL GEOCHEMISTRY ¢ ANOMALOUS GOLD HIGHLIGHTS THE SPARGOS REWARD SHEAR NOTE: CHANGES IN THE STRIKE DIRECTION e KUNANULLING SHEAR LIES ADJACENT TO ANOMALOUS GOLD
Slide 7: Wattle Dam: Gold
WATTLE DAM: Gold " RAMELIUS >» GOLD RESOURCE DEFINITION PROJECT e 7800 PROSPECT Indicated/Inferred Resource 155,000 tonnes @ 3.3 g/t gold E718 P15/4479 [ >» ADVANCED EXPLORATION e /000N PROSPECT Previous Drilling, 3m @ 4.7 g/t gold, 5m @ 1.9 g/t gold 7,800 PROSPECT ¢ 8500N PROSPECT 155,000t @ 3.3g/t
Slide 8: Wattle Dam Gold Project Air Magnetics
° Drillhole © Drillhole ‘With significant gold value fi.2=1 metre @ 1.29 Gold -—— 7 - WATTLE DAM I}| 155,c00t @3.3g¢ Gold | MO WATTLE DAM GOLD PROJECT AIR MAGNETICS
Slide 9: Wattle Dam 7,800 Prospect
WATTLE DAM 7,800 PROSPECT RAMELIUS MINERILISED ZONE e A Resource Estimate of 155,000 tonnes @ 3.3 gift gold {cut} for 16,500 ounces gold to a depth of approximately 70 metres. e Mining and metallurgical studies have commenced. WATTLE DAM 7,800N PROSPECT MINERALISED ZONE
Slide 10: Wattle Dam 7800N Development Studies
WATTLE DAM 7800N DEVELOPMENT STUDIES RESOURCE ESTIMATE @2 gram/metre cut off. INDICATED INFERRED TOTAL Zone |Tonnes| Grade }Tonnes| Grade | Tonnes | Grade git gold gt gold g/t gold Eastern |44,000| 4.3 9,000 3.9 53,000 43 Central | 5,000 | 59 [24000] 36 | 29,000] 40 Other |31,000| 21 |42000| 24 | 73
Slide 11: Spargoville Regional Project Area: Hilditch
* 4 % 2 3 Yo HILDITGH PROJECT [& LOGAN LARKINVILLE PROJECT SPARGOVILLE REGIONAL PROJECT AREA WATTLE DAM PROJECT 280 km? in area 30 kms strike length of the gold belt: >» WATTLE DAM GOLD PROJECT NORTH WIDGIE BLOCK Resource Delineated at 7800N Prospect. Advanced and Routine Exploration programmes a ig
Slide 12: Hilditch Nickel Project
2m @ 0.70% Ni, 0.18% Cu Ultramafic rocks 2m @ 1.20% Ni, 0.53% Cu (magnetic) 2m @ 0.67% Ni, 0.08% Cu Ultramafic rocks 2m @ 0.41% Ni, 0.07% Cu Mafic rocks Ww 4 ‘| Sediments es | % - Felsic rocks @ joa} Dyke e Tenement Outline eo e Ni gossan EM Conductor S> (odeled) Me: EM Anomaly — RAB rill line we RC
Slide 13: Hilditch Project Nickel
HILDITCH PROJECT NICKEL RAMELIUS 400mRL Felsic rocks Porphyry intrusives (e) Ultramafic rocks [9] Mafic rocks [HE Sediments 3 3 t 7 ay rears T T 1 EN TX | Yor/ ¢ ‘4 yi | /* \ | t Yt § f waa. / , \ J ‘ RAMELIUS RESOURCES LTD HILDITCH PROJECT INTERPRETIVE GEOLOGY C3 MODELLED Section on 6,536,000mN CON
Slide 14: Hilditch Nickel Project Drilling
2m @ 0.70% Ni, 0.18% Cu Ultramafic rocks 2m @ 1.20% Ni, 0.53% Cu (magnetic) 2m @ 0.67% Ni, 0.08% Cu Ultramafic rocks 2m @ 0.41% Ni, 0.07% Cu Mafic rocks Ww 4 ‘| Sediments es | % - Felsic rocks @ joa} Dyke e Tenement Outline eo e Ni gossan EM Conductor S> (odeled) Me: EM Anomaly — RAB rill line we RC
Slide 15: Hilditch Nickel Project Section
400mRL DH 03 , DH 01 \ 0.53Cu ‘ 2/0.67Ni ( D\, Ultramafic Ultramafic 350mMRL 2/0.41 = 2metres @ 0.41% Ni 0.07 = 2metres @ 0.07% Cu HILDITCH NICKEL PROJECT
Slide 16: Nickel Ironstone Geochemistry
NICKEL IRONSTONE GEOCHEMISTRY Ultramafic (feruginous)] [_ low | [low | Laterite on Ultramafic [high] Sediment at outcrop NICKEL GOSSAN Iron Copper Nickel Zine Platinum ] medium medium [high] HILDITCH te GOSSANS 25 to 55 PPM 2000 to 17000 | PPM 11 to 500 PPB 60 to 750
Slide 17: Current Projects
CURRENT PROJECTS ingetong CaZn a a ean Rnodes ir" we Au oomue wa verctemae Ate . Wana benzos a Bin aa Katgoorte Aw Bonen Late Seabroot Congaree Au Oneettore Seamer Aw © rence SE A Logs find GOLD RESOURCES - DRILL TARGETS - BLAGK GAT WATTLE DAM {7800PROSPECT) WATTLE DAM (x3) NORTH WIDGIE (x4) HILDITG
Slide 18: Black Cat: Gold
BLACK CAT: GOLD RAMELIUS » Black Cat South Resource 255,000 tonnes @ 2.7 g/t gold ( inferred and indicated) >» Black Cat North Resource 35,000 tonnes at 2.7 g/t gold (inferred and indicated) » Global Resource 290,000 tonnes @ 2.7 g/t gold
Slide 19: Current Projects
CURRENT PROJECTS RAMELIUS D Porter Mange Wi-Aar a Fant Kalgoorte . AL coonevsie AY Logme Ve au GOLD RESOURCES - DRILL TARGETS - BLAGK GAT WATTLE DAM {7800PROSPECT) WATTLE DAM (x3) NORTH WIDGIE (x4) HILDITGH ADVANCED EXPLN.- WATTLE DAM NORTH WIDGIE PARKER RANGE GREENFIELDS - LOGANS FIND IDA FAULT NIC
Slide 20: Ingebong Hills Project Areas
INGEBONG HILLS PROJECT AREAS ¥s [__] Sedimentary 2 8 ~~ | Metasedimentary Ww Frere Fm. |_| Bangemail Group > Ingebong Hills — In-fill soil sampling over delineated Copper/Zinc anomalies > Blue Hills—A Greenfield gold project COMPRISING THREE PROJECT AREAS IN THE RAMELIUS EARAHEEDY BASIN W.A. W2 SOOm
Slide 21: Royalty Interests
ROYALTY INTERESTS RAMELIUS SANDSTONE -Troy Resources N.L. Gold ( » SIBERIA — Siberia Mining Corporation Ltd. v / Gola a Gold & Nickel Laferife Port Hediand — i aa /eaanerie — GME Resources Ltd. ge) ie /, Nickel Laterite ; f /_»EDJUDINA - Sons of Gwalia Ltd. / /\ Gold Y 1) \ 2 / c f sae 4-4 yg / _*BU
Slide 22: Activity Statement for the Period July to October
ACTIVITY STATEMENT FOR THE PERIOD + JULY 03 TO OCTOBER 04 z e t RC DRILLING 145 HOLES FOR 9055 METRES i AIRCORE DRILLING 47 HOLES FOR 2201 METRES @ RAB DRILLING , $6 HOLES FOR 1156 METRES ° AUGER SAMPLING 1880 HOLES = ° TEM | SURVEY = 22.5 LINE KILOMETRES FOR 242 STATIONS ° ase > 000 ASSAYS - GOLD A
Slide 23: Outlook
OUTLOOK aA RAMELIUS if p eWATTLE DAM (GOLD) 7800N PROSPECT INITIAL OPTIMISATION STUDY POSITIVE FEASABILITY & TOLL TREATMENT NEGOTIATIONS CONTINUING 8500N PROSPECT , SCOPING DRILL PROGRAM ON POTENTIAL 7000N PROSPECT” RESOURCES ADJACENT TO 7800N PROSPECT eBLACK CAT (GOLD) POSSIBLE JOINT DEVELOPMENT eH
Ramelius Resources — Investor Presentation (November 2004) on 6ix