KP Green Engineering Limited · BSE:KPGEL

KP Green Engineering — H1 FY27 Earnings Presentation

27 slides from KP Green Engineering's earnings presentation, Nov 13, 2026

  1. Slide 1: BSE filing cover letter for Investor Presentation

    KPGE/INV/PPT/H1FY27/164 Date: November 13, 2026 BSE Limited Phiroze Jeejeebhoy Towers, Dalal Street, Mumbai – 400 001 Scrip Code: 544150 Sub.: Investor Presentation / Key Highlights for the Half Year ended September 30, 2026 Dear Sir/Madam, Apropos the captioned subject, please find attached herewit

  2. Slide 2: KP Green Engineering Limited Investor Presentation H1 FY27

    KP GREEN ENGINEERING LIMITED Investor Presentation H1 FY27

  3. Slide 3: Agenda

    02 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Agenda Industries Served & Products Company Overview Financials About KP Group

  4. Slide 4: Industries Served & Products

    Manufacturing facility at Matar, Bharuch Industries Served & Products

  5. Slide 5: Product Range One: Solar Structures & Wind Towers

    INDUSTRIES SERVED & PRODUCTS 04 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Product Range One: Solar Structures & Wind Towers Mounting structures, torque tubes and lattice towers for India's 500 GW non-fossil target 01 RENEWABLES 02 TRANSMISSION & TELECOM 03 MOBILITY: RAIL & ROAD 04 BUILDINGS

  6. Slide 6: Product Range Two: Transmission, Telecom & Ancillary Infra

    INDUSTRIES SERVED & PRODUCTS 05 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Product Range Two: Transmission, Telecom & Ancillary Infra India plans ₹9.15 lakh Cr of transmission investment by 2032 and 12 lakh towers for its 5G roll-out 01 RENEWABLES 02 TRANSMISSION & TELECOM 03 MOBILITY: RAIL &

  7. Slide 7: Product Range Three: Railway & Roadway Structures

    INDUSTRIES SERVED & PRODUCTS 06 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Product Range Three: Railway & Roadway Structures Bridges, Kavach towers and crash barriers for India's rail and road build-out 01 RENEWABLES 02 TRANSMISSION & TELECOM 03 MOBILITY: RAIL & ROAD 04 BUILDINGS MARKET OPPOR

  8. Slide 8: Product Range Four: PEB & Data Centre Buildings

    INDUSTRIES SERVED & PRODUCTS 07 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Product Range Four: PEB & Data Centre Buildings Steel buildings designed in-house for factories, warehouses and India's data-centre build-out 01 RENEWABLES 02 TRANSMISSION & TELECOM 03 MOBILITY: RAIL & ROAD 04 BUILDING

  9. Slide 9: Future Product Range

    I NDUS T R I E S S E R V E D & P R O DUC T S 08 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Future Product Range​ Planned expansion into adjacent steel and metal products Container Manufacturing Onshore Tubular Tower Offshore Tubular Tower Hot Rolling Mill Fasteners – Magni Coating Aluminium E

  10. Slide 10: End-to-End Expertise

    INDUSTRIES SERVED & PRODUCTS 09 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 End-to-End Expertise Design, precision engineering, galvanising and on-site delivery – all under one roof Engineering & Design Precision Engineering Hot-Dip Galvanising Manufacturing & Execution IDEAS THAT BUILD TOMORR

  11. Slide 11: Engineering Today for a Brighter Tomorrow

    I NDUS T R I E S S E R V E D & P R O DUC T S 10 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Engineering Today for a Brighter Tomorrow One integrated platform engineering the backbone of energy, transport, telecom and urban infrastructure

  12. Slide 12: Company Overview

    Inside the Matar factory Company Overview

  13. Slide 13: Company Snapshot

    COMPANY OVERVIEW 12 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Company Snapshot ₹679 Cr 4,00,500 MTPA Total M anufactur ing Capaci t y H1F Y27 Revenue fro m O peratio ns ₹119 Cr 23 Products H1F Y27 EB ITDA Catering to Different Sector s ₹34 Cr ~55 Acres H1F Y27 Profit A fter Tax M anufacturi

  14. Slide 14: Sustainable Galvanising at Matar

    COMPANY OVERVIEW 13 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Sustainable Galvanising at Matar ESG-aligned engineering: encapsulated process, green energy and zero liquid discharge Galvanising Kettle 01 02 03 The 100% encapsulated galvanising process at Matar is built to meet global ESG stan

  15. Slide 15: A Safe & Respectful Workplace

    COMPANY OVERVIEW 14 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 A Safe & Respectful Workplace Committed to 'Zero Accidents' through employee safety, health and dignity OH&S Management Personal Protective System Equipment Standard Operating Mandatory adoption Procedures defined for of PPE for a

  16. Slide 16: Board of Directors

    COMPANY OVERVIEW 15 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Board of Directors Dr. Faruk G. Patel Prof. Sunil Maheshwari Mr. Muinulhaque Kadva Mr. Hassan Faruk Patel CHAIRMAN AND VICE-CHAIRMAN AND NON- WHOLE-TIME WHOLE-TIME NON-EXECUTIVE DIRECTOR EXECUTIVE DIRECTOR DIRECTOR DIRECTOR CA Ekt

  17. Slide 17: Financials

    Road Over Bridge project being executed for Chennai Metro Financials

  18. Slide 18: Financial Highlights – H1 FY27

    FINANCIALS 17 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Financial Highlights – H1 FY27 Total Income EBITDA PAT Cash Profit TOTAL INCOME TOTAL INCOME TOTAL INCOME TOTAL INCOME (₹ IN CR) (₹ IN CR) (₹ IN CR) (₹ IN CR) CAGR CAGR CAGR CAGR +100% 27% +100% 17% +100% −41% +100% 11% YoY YoY YoY YoY

  19. Slide 19: Balance Sheet Highlights – H1 FY27

    FINANCIALS 18 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Balance Sheet Highlights – H1 FY27 Debt INCOME TOTAL EquityINCOME TOTAL Debt to TOTAL Equity INCOME (₹ IN CR) CAGR (₹ IN CR) CAGR (x) CAGR +100% +100% +100% 447 0.91 491 382 0.51 196 H1 FY26 H1 FY27 H1 FY26 H1 FY27 H1 FY26 H1 FY27 Note:

  20. Slide 20: Income Statement Summary (Consolidated)

    FINANCIALS 19 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Income Statement Summary (Consolidated) (₹ IN Cr) 28% Particulars H1 FY27 H1 FY26 YoY% change FY26 Revenue from Operations 679 532 28% 1,246 H1 FY27 Revenue from Operations ₹679 Crore as compared to ₹532 Total Income 682 536 27% 1,250 C

  21. Slide 21: Balance Sheet Summary (Consolidated)

    FINANCIALS 20 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Balance Sheet Summary (Consolidated) (₹ IN Cr) Particulars H1 FY27 H1 FY26 Shareholders' Funds Non-Current Liabilities: A + B 491 245 382 51 109% Sep-26 – Fixed Assets at ₹695 Crore as compared to ₹332 Crore in Sep-25 (A) Long Term Loan

  22. Slide 22: Cash Flow Statement Summary (Consolidated)

    FINANCIALS 21 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Cash Flow Statement Summary (Consolidated) (₹ IN Cr) Particulars H1 FY27 H1 FY26 Cash Flow from Operating Activities (110) 57 Cash Flow from Investing Activities (11) (149) Cash Flow from Financing Activities 127 88 Net Increase / (Decr

  23. Slide 23: About KP Group

    About KP Group»

  24. Slide 24: KP Group

    ABOUT KP GROUP 23 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 KP Group Three listed platforms. One defining ambition – an integrated renewable energy & infrastructure ecosystem KPI GREEN ENERGY LIMITED BSE & NSE LISTED Flagship IPP platform, also delivering large-scale solar and solar- led hyb

  25. Slide 25: Humanitarian Services Driven by Passion, Not Obligation

    ABOUT KP GROUP 24 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Humanitarian Services Driven by Passion, Not Obligation • KP Human HEALTH EDUCATION Development Foundation also supports aspiring civil services candidates in their exam preparation, benefiting 15 • KP Human Development • KP Human h

  26. Slide 26: Contact Us

    25 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Contact Us KP Green Engineering Limited Investor Relations Investor Enquiries [email protected]

  27. Slide 27: Disclaimer

    26 K P G R E E N E NG IN EERIN G L T D . | H1 F Y 27 Disclaimer No representation or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of the information or opinions contained in this presentation. Such information a

KP Green Engineering — H1 FY27 Earnings Presentation on 6ix