Rome Resources Plc · LSE:RMR
Rome Resources — FY2025 Earnings Presentation
19 slides from Rome Resources's earnings presentation, June 2026
Slide 1: African Tin Explorer – 2025 Results
1 AFRICAN TIN EXPLORER 2025 RESULTS JUNE 2026 | LSE: RMR.L October 2024 1 T IN M IN ER A L IS ATION IN K A L AY I COR E
Slide 2: Disclaimer
2 Disclaimer NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, DIRECTLY OR INDIRECTLY, IN WHOLE OR IN PART, IN the property or other assets invested. Any person who is in any doubt about the subject matter to which the OR INTO THE UNITED STATES, CANADA, AUSTRALIA OR JAPAN, OR ANY OTHER JURISDICTION WHER
Slide 3: Rome Resources – Introduction
3 Rome Resources – Introduction ❖ Rome operates in the DRC in the Highest Grade Tin Play in the World ❖ Two key projects: Kalayi Tin & Mont Agoma Tin-Copper ❖ Kalayi is 9km from major tin processing and export facility ❖ Came to AIM in mid-2024, commencing drilling immediately ❖ Almost 10,000m of di
Slide 4: Rome Resources – 2025 Results
4 Rome Resources – 2025 Results ❖ 2025 Highlights ❖ Conducted extensive drilling operations on the Company’s Bisie North Project ❖ Issued an inaugural Mineral Resource Estimate for the Bisie North Project ❖ Kalayi 4.5kt contained tin at 1.36% tin ❖ Mont Agoma 46kt contained copper at 1.45%, 86kt con
Slide 5: Experienced Team With Strong Track-Record in DRC
5 Experienced Team With Strong Track-Record in DRC Board and Senior Management Klaus Eckhof Paul Barrett Stephane Irung Non-Executive Chairman C.E.O. Non Executive Director Mr. Eckhof is a geologist with more Mr. Barrett is a geologist with over 40 Mr. Irung is a DRC based than 20 years of experienc
Slide 6: The Bisie North Project – Two Key Strategic Discoveries
6 The Bisie North Project – Two Key Strategic Discoveries A proven production district in resource-rich Tin Granite DRC ROME RESOURCES margin The Bisie tin play is BISIE developed around the NORTH Bisie Regional Tin/Copper margin of a major tin- Trend bearing granite complex in Tin Granite the easte
Slide 7: Stable Security and Operating Environment
Stable Security and Operating Environment 7 Rome Resources and Alphamin area – M23 and Ebola outbreak not affecting operations M23 rebels established in a large area to the north and west of the regional capital of Goma Line of Contact between DRC forces and M23 along the western limit has not moved
Slide 8: The Importance of the Bisie/Bisie North Tin Play
The Importance of the Bisie/Bisie North Tin Play 8 Grade Comparison – Top Ten Global Tin Deposits by Grade 4.01% 2.05% 1.60% 1.48% 1.46% 1.17% 1.15% 1.04% 0.82% 0.49% Alphamin Cornwall Company Minsur Cornish Tin Metals X Conrish Metals Gok Deputatsky Stellar Resources Atlantic Tin First Tin Resource
Slide 9: Tin Supply under Pressure
Tin Supply under Pressure 9 Replacement higher grade mines needed going forward to satisfy demand
Slide 10: Tin is Growing in Criticality
Tin is Growing in Criticality 10 Tin Demand Outlook to 2050 – set to Surging demand with tin a key double in next 20 years component in solar and AI (computing and Electronics Solders Vehicle Solders Solar Solders Chemicals Tinplate Batteries Tin Copper Other data storage), with semiconductor 1000.0
Slide 11: Copper Maintaining Upward Demand Curve
Copper Maintaining Upward Demand Curve 11 Supply: A major copper supply deficit develops after this decade Mine copper supply from existing and announced projects and supply requirements by scenario 35 30 25 20 15 10 5 -- 2024 2030 2035 2040 Base Case High Production Case NZE Requirement APS Require
Slide 12: The Improving DRC Commercial Environment
The Improving DRC Commercial Environment 12 New U.S.–DRC framework creates a clear pipeline of mineral opportunities Creates a clear entry opportunity for US companies to open mineral prospecting areas Success will create much more mineral exploration and associated activity across DRC Enhances inve
Slide 13: Kalayi – Pure High-Grade Tin
Kalayi – Pure High-Grade Tin 13 NW SE Tin Grades, % Equivalent to previous Kalayi drilling phase Equivalent to 2026 50m Kalayi drilling phase 2026 Drill programme targeted under and within the main zone Example from Mpama South Mine where grade intercepts improve significantly at depth
Slide 14: Mont Agoma – Tin, Copper Polymetallic Deposit
14 Mont Agoma – Tin, Copper Polymetallic Deposit Very encouraging initial drilling campaign delineating potential for a large-scale polymetallic deposit Results demonstrating significant tin, copper and zinc mineralisation in a large 200m wide polymetallic zone along trend ROME between Kalayi and Bi
Slide 15: Mont Agoma – Tin Targets
15 Mont Agoma – Tin Targets Tin Cloud of Mont Agoma assays Identifies areas prone to tin mineralisation, rather than specific high grade ore shoots Demonstrates how tin is strongly developed above zone 3 and open to the southeast
Slide 16: Early Stage Critical Minerals – Eastern Canada
Early Stage Critical Minerals – Eastern Canada 16 Schoullar Square Mount Mountain Lake USA Pleasant Mount Douglas Granite CANADA Victoria Lake Approximate Outline of Rome Project Areas Location of Mount Pleasant W-Mo Mine and Sn-In Discovery 5km
Slide 17: Value Proposition
Value Proposition 17 Near Term Resource growth for Kalayi Tin Pilot Mine Operation at Kalayi Delineation of further Exploration Targets with completed survey Medium Term Resource growth for Mont Agoma Tin and Copper Commercial Agreement to develop through Alphamin Facilities Progressing Kalayi to Fe
Slide 18: Summary and Forward Programme
Summary and Forward Programme 18 Summary High Grade tin and copper deposit being quantified Tin at Kalayi approaching Alphamin grades Expecting strong resource growth in Kalayi from the recent programme Currently $1.5mm cash at bank Kalayi mineralisation style conducive to producing through Alphamin
Slide 19: Appendix: Capital Table
19 Appendix: Capital Table Ticker RMR.L Shares in Issue 7,676,625,932 Share Price 0.35p Market Capitalisation £26.8mm