  1. Slide 1: Baobab Project - Pictorial Update

    25 May 2016 BAOBAB PROJECT - PICTORIAL UPDATE Avenira Limited ('Avenira' or the 'Company') is pleased to provide a pictorial update from the Baobab Phosphate Project in Senegal. The update demonstrates the solid progress being made on the removal of overburden and the construction of waste stockpile

  2. Slide 2: Gadde Bissik Mine Site Visit May 2016

    Baobab Mining and Chemicals Corporation SA Gadde Bissik Mine Site Visit May 2016

  3. Slide 3: Baobab Project Port of Dakar Small Mine Permit Area

    Baobab Project Port of Dakar Small Mine Permit Area Gadde Bissik Sealed highway

  4. Slide 4: Main entrance

    Main entrance

  5. Slide 5: Site offices and accommodation rooms installed

    Site offices and 18 accommodation rooms installed

  6. Slide 6: Overburden removal

    Overburden removal

  7. Slide 7: Overburden removal

    Overburden removal Reese

  8. Slide 8: Dump truck returning from Waste stockpile

    Dump truck returning from Waste stockpile

  9. Slide 9: Waste stockpile area

    Waste stockpile area — a $ >

  10. Slide 10: Project leadership with local community leader

    Project leadership with local community leader Paul Sub-Prefect Manar BA Richardson Lambaye

  11. Slide 11: EIS Committee site meeting

    EIS Committee site meeting

  12. Slide 12: EIS Committee site tour

    EIS Committee site tour

  13. Slide 13: Process plant planning

    & Process plant planning

  14. Slide 14: Process plant design

    Process plant design

  15. Slide 15: Structural concrete foundations for Process plant

    Structural concrete foundations for Process plant

  16. Slide 16: Structural concrete foundations for Process plant

    Structural concrete foundations for Process plant

  17. Slide 17: Gadde Bissik SMP - Ongoing resource definition drill program

    Northing (WGS84) 1645500 1646000 1646500 1645000 1644500 1644000 Gadde Bissik SMP - Ongoing resource definition drill program - May 2016 SMP background UAV imagery acquired April 2016 a as a a | aT a | it eT @ Existing drill hole al 1 Proposed drilling, ram in ress INDICATED RESOURCE oP ng, prog pro

  18. Slide 18: Avenira Limited contact details

    Avenira Limited ABN: 48 116 296 541 www.avenira.com Ground Floor, 20 Kings Park Road West Perth, WA 6005 AUSTRALIA PO Box 1704 West Perth WA 6872 AUSTRALIA +61 8 9264 7000 [email protected] © 2016 Avenira Limited