ReeXploration Inc. · TSXV:REE

ReeXploration — E-Tech Resources — Investor Presentation (May 2022)

16 slides from ReeXploration's investor presentation, May 2022

  1. Slide 1: EUREKA REE Project, Namibia

    Powering the transition to a cleaner future www.etech-resources.com EUREKA REE Project, Namibia CORPORATE PRESENTATION - SUMMARY May 2022 E-Tech Resources are exploring for the rare earth elements necessary to drive the global transition to clean energy TSXV: REE | FSE: K2i

  2. Slide 2: Disclaimer

    Disclaimer Securities of the Company will be issued only under exemptions from the prospectus and registration requirements of applicable securities laws. Each purchaser is advised to consult with their own legal counsel regarding the prospectus exemptions of applicable securities laws, the conseque

  3. Slide 3: Why neodymium?

    High-Strength Neodymium Magnets (NdFeb) are used in: Consumer Electronics Speakers Conventional Vehicles 01 Neodymium (Nd) is used to make high strength & high Electric Vehicles (HEV, PHEV, EV) Other E Mobility performance neodymium magnets Wind Turbines Air Conditioning 02 Smart solutions to clean

  4. Slide 4: Price Increase

    The REE magnet materials Nd and Pr have experienced more than 150% price increase over the last 2 years. Source : Argus Media Anticipated deficit Increasing domestic 1 5 demand in China of REE magnet supply Fear for deficit of REE Complex and easily 2 6 disruptable supply chains magnet material supp

  5. Slide 5: 2030 Market Needs

    Forecast NdFeB Magnet Consumption 2030 Projected demand of NdFeB 120,000 T/Y for EV & Wind Turbines alone equals equals 60,000 T/Y 300,000 T/Y NdPr Oxide TREO (@ 0.5kg NdPr Oxide / 1kg (@ 20% NdPr Oxide) NdFeB metal) equals Cracking Plants Units 100x (@ 3000 t/y TREO, as in development by SRC, Canad

  6. Slide 6: 2030 Market Imbalance

    Rare earth oxide demand by element (volume & value), 2030 NdPr OXIDE 2030 Market 0% 1% 2% 2% 0% 0% Volume 0% 0% 7% Value 2% Imbalance. Cerium 9% 31% 38% 34% Lanthanum Neodymium Praseodymium Dysprosium Global deficit equals Terbium 26% 50,000 T 25,000 T Source: Argus Media 22% 0% 0% 9% 17% NdFeB PM N

  7. Slide 7: Board & Management Team

    COMPANY DETAILS Board & Management Team CEO germany CFO Canada Edward Loye Elbert Loois Rob randall Dan Whittaker Ken Marshall MINING, Canada ENERGY, Canada GEOLOGY, Uk 20+ years of A contract CFO for a management & number of public consulting experience in companies including developing sustainable

  8. Slide 8: What are we currently targeting at Eureka?

    One of the simplest rare earth element (REE) projects globally What are we currently targeting at Eureka? Separation & Metals Collaborate Exploration Mining Processing Alloying Manufacturing Purification Processing / on process Making development LOI with for Rare Earth Cracking and TREO, including

  9. Slide 9: Easy Physical Processability

    Easy Physical Processability • High grade TREO, close-to-surface mineralization • Hosted in numerous broad carbonatite dyke swarms containing coarse grained monazite mineralization Simple • In-situ average grade range 4.8% TREO, as stated in maiden Inferred resource Mineralogy (NI43-101, Aug 2021) •

  10. Slide 10: PR Highlights

    PR HIGHLIGHTS • Nov 10, 2021 - Reporting High-Grade Diamond Drill Intercepts Up To 100 Meters Below Current Resource, Including 6.5% TREO Over 4 Meters • Dec 1, 2021 - Received Further High-Grade Assays And Expands The Mineralized Footprint • Feb 10, 2022 - Reports Diamond Drill Intercepts of REE Be

  11. Slide 11: Results & MRE

    Results & MRE MRE in preparation to be disclosed in Q2/2022 Based on preliminary testing (SGS, 2016) ü Easy & close-to-surface geology (monazite in carbonatite dykes) Exploration Highlights MONAZITE IN HOST ü High-grade TREO All assay results of 1st campaign received ROCK (average 5% in current MRE

  12. Slide 12: Milestone Planning

    COMPANY DETAILS Milestone Planning E-Tech Resources planned activities 2021 2022 Q3 2021 Q4 2021 - Q1 2022 Q2 2022 Onwards Drilling Program Drilling Program Mineralogical PEA (preliminary economic assessment) Campaign 1 Campaign 2 Test work & MRE Update TSXV: REE | FSE: K2i | MAY 2022

  13. Slide 13: ESG Protocol

    ESG Protocol • EIA conducted by ASEC Namibia and a state approved • Follow installed Corporate Codes, Policies, Charts, Guidelines • Own Sustainability Advisory Board with ESG experts installed • Adhere to relevant United Nations SDG Committed to highest standards of • Adhere to Project Readiness St

  14. Slide 14: Financials

    How is the project funded? By 100% Equity Capital How many shares privately owned and publicly floated? ~ 75% (62mil) privately owned shares, ~ 25% (20mil) are floated on the stock exchange Where are you listed? We are dual listed: primarily on the TSX-V & co-listed on the Frankfurt Stock Exchange W

  15. Slide 15: Value Sustainability

    SUSTAINABLE project conditions are actively managed Value • Namibia has mining favourable jurisdiction Factors for • Striving for social inclusion in Erongo mining region sustainable Sustainability • No major negative socio-environmental impact expected • Following responsible sourcing initiatives p

  16. Slide 16: Thank you

    Thank you Follow our Social Channels: Send us your questions: [email protected] www.etech-resources.com TSXV: REE | FSE: K2i | MAY 2022

E-Tech Resources — Investor Presentation (May 2022) on 6ix