El Paso Electric — Non-Deal Roadshow (March 2012)
41 slides from El Paso Electric's roadshow presentation, Mar 7, 2012
Slide 1: El Paso Electric Goldman Sachs Marketing Tour March 7-8, 2012
El Paso Electric Goldman Sachs Marketing Tour March 7-8, 2012 El Paso Electric R Exhibit 99.1
Slide 2: Safe Harbor Statement
Safe Harbor Statement Statements in this presentation, other than statements of historical information, are forward-looking statements that are made pursuant to the safe harbor provisions of the Private Securities Litigation Reform Act of 1995 (the “act”). Such statements are intended to be made as
Slide 3: EE Overview
EE Overview Regional electric utility serving west Texas and southern New Mexico Rate regulated business – no retail competition – fuel “pass through” Above average customer and retail sales growth Favorable environmental profile Sizable capital expenditures plan and resulting rate base growth for t
Slide 4: El Paso Electric Profile
El Paso Electric Profile NYSE Ticker Symbol EE Net Dependable Generating Capability 1,785 MW 2011 Native System Peak Demand 1,711 MW Retail Customers Approx 380,000 Credit Ratings S&P BBB Moody’s A3 2011 Annualized Dividend Yield 2.54% Actual 2011 EPS (Basic) $2.49 2012 EPS Guidance (Basic) $2.15 (L
Slide 5: Service Territory
Service Territory New Mexico WECC Texas SERC Service Territory March 2012 Investor Relations 5 • Approximately 380,000 retail customers • Clean dependable generating capability 1,785 MW (net) - nuclear (36%), gas (58%) and limited coal (6%) 12 Months Ended 12/31/11 Operating Revenues, Net of Energy
Slide 6: CEO Transition Update
CEO Transition Update • On March 2, 2012 David Stevens resigned his position as CEO of El Paso Electric in order to pursue another job opportunity • Board of Directors appointed Thomas V. Shockley to assume the responsibilities of the CEO on an interim basis • EE Director since May 2010 • Former Vic
Slide 7: Regulatory Overview
Regulatory Overview Regulated in Texas by PUCT (~75%), in New Mexico by NMPRC (~25%) and by FERC (<1%) In response to a show cause order by the City of El Paso, EE filed a rate case with the PUCT on February 1, 2012 No current plans for a New Mexico rate case prior to 2013 FERC rates are largely for
Slide 8: Summary of 2012 Texas Rate Case
Summary of 2012 Texas Rate Case • On October 4, 2011, El Paso City Council adopted a resolution requiring EE to show cause why base rates for customers in El Paso city limits should not be reduced • On November 15, 2011, the El Paso City Council adopted a resolution which established current rates a
Slide 9: Rate Base
Rate Base • Total Rate Base • Total Company $1,524mm • Texas jurisdictional $1,126mm • Approximately $511mm of plant additions have been added since the last rate case resulting in an increase to Texas jurisdictional net plant of approximately $256mm • Significant plant additions to rate base includ
Slide 10: Cost of Service
Cost of Service • Texas cost of service has increased by $81.1mm due primarily to increases in O&M, return on rate base, depreciation and other taxes resulting from recent plant additions • O&M increases mainly attributable to pension and OPEB, payroll, and rate case expenses March 2012 Investor Rel
Slide 11: Expected Texas Rate Case Timeline
Expected Texas Rate Case Timeline • 2012 Texas Rate Case Procedural Schedule: • Texas Rate Case Filing - February 1, 2012 • Discovery Process - February/May 2012 • Intervenors and Staff Testimony – May 2012 • Rebuttal Testimony - June 2012 • Hearings – June 2012 • PUCT decision – September 2012 • Ne
Slide 12: Above Average Customer and Retail Sales Growth
Above Average Customer and Retail Sales Growth March 2012 Investor Relations 12 EE continues to have above average growth as compared to the industry
Slide 13: Retail Customer & kWh Sales Growth
Retail Customer & kWh Sales Growth March 2012 Investor Relations 13 1.82% 1.07% 0.00% 0.20% 0.40% 0.60% 0.80% 1.00% 1.20% 1.40% 1.60% 1.80% 2.00% EE Avg. Customer Growth (2006-2011) Industry Avg. Customer Growth (2005-2010) 5-Year Retail Customer Growth 4.04% 2.35% 0.41% 0.00% 0.50% 1.00% 1.50% 2.00
Slide 14: Local Economic Growth
Local Economic Growth March 2012 Investor Relations 14 • Continued Expansion of Fort Bliss • Fort Bliss will be constructing a new replacement hospital at a cost of almost $1 billion; new Soldier Family Care Center • Growth related to Fort Bliss is shifting gears from primarily construction expansio
Slide 15: Customer Base Expansion
Customer Base Expansion March 2012 Investor Relations 15 2,233 2,228 2,362 2,509 2,633 2,216 2,255 2,251 2,296 2,352 1,195 1,102 1,024 1,087 1,096 1,384 1,449 1,482 1,542 1,580 500 700 900 1,100 1,300 1,500 1,700 1,900 2,100 2,300 2,500 2,700 2,900 2007 2008 2009 2010 2011 GWH Sales by Class Residen
Slide 16: Residential Customer and Usage per Customer Growth
Residential Customer and Usage per Customer Growth March 2012 Investor Relations 16 Number of Customers Usage per Customer 10-Year CAGR kWh Usage 1.59% Customers 2.03% • Refrigerated air conditioning is being installed in 99% of new homes; approximately 35% of El Paso residences have refrigerated ai
Slide 17: Favorable Environmental Profile
Favorable Environmental Profile March 2012 Investor Relations 17 EE has a favorable environmental profile and is well-positioned to comply with proposed environmental regulations
Slide 18: Diversified Energy Portfolio and Low Carbon Footprint
Diversified Energy Portfolio and Low Carbon Footprint March 2012 EE vs. U.S. Carbon Footprint (Short tons CO2 equivalent emissions/MWH) Renewable energy purchases represent 1% of total purchased power 2007 National Average 0.65 2010 EE 0.31 Investor Relations 18 Nuclear, 45% Purchased Power, 19% Nat
Slide 19: Environmental Regulations
Environmental Regulations • Recent Environmental Rulemakings • Cross State Air Pollution Rule (CSAPR) reduces interstate transport of ozone and fine particle air pollution • Only EE’s Texas jurisdiction must comply with new rules; Four Corners is excluded • These were to become effective January 1,
Slide 20: Expanding Rate Base
Expanding Rate Base March 2012 Investor Relations 20 Capital requirements are being driven by the need to build infrastructure to meet customer demand
Slide 21: Generation Portfolio
Generation Portfolio Newman •Natural Gas •752 MW Palo Verde •Nuclear •633 MW Rio Grande •Natural Gas •229 MW Four Corners •Coal •108 MW Copper •Natural Gas •62 MW Hueco Mountain •Wind •1 MW March 2012 Investor Relations 21 Net Dependable Generating Capability
Slide 22: Growth in Peak Demand and Generating Capability
Growth in Peak Demand and Generating Capability March 2012 Investor Relations 22 1,100 1,300 1,500 1,700 1,900 2,100 2,300 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Purchased Capacity Installed Capacity Native Peak Projection Actual MWs
Slide 23: Capacity Additions
Capacity Additions March 2012 Investor Relations 23 • EPE is making substantial investment in new plant to meet load growth and to modernize its power plant fleet by building new, more efficient natural gas units to replace its aging units • Approximately 436 MWs of new generation additions and 225
Slide 24: Cash Capital Expenditures
Cash Capital Expenditures March 2012 Investor Relations 24 • Construction work in progress of $167mm at December 31, 2011 • Capital expenditures are expected to average approximately $278mm annually through 2016 • Primary additions to rate base through 2016 include: • New Generating Plant additions
Slide 25: Financial Stability
Financial Stability March 2012 Investor Relations 25 EE has solid credit metrics, which should allow continued access to capital markets, while at the same time allowing for cash and non-cash returns to investors
Slide 26: Commitment to Credit Quality
Commitment to Credit Quality • Capital Structure March 2012 • Well positioned to finance planned investments – Investment grade credit ratings – S&P reaffirmed its BBB rating and Stable Outlook in September 2011 – Moody’s reaffirmed its A3 rating and Stable Outlook in October 2011 Moody's S&P EE A3
Slide 27: Capital Allocation and Liquidity
Capital Allocation and Liquidity • EE dividend payments were $27.2mm in 2011 • EE is committed to enhancing long term value and cash returns to shareholders primarily through quarterly cash dividend payments and secondarily through share repurchases • Board will review the dividend policy annually i
Slide 28: 2012 Earnings Guidance
2012 Earnings Guidance • 2012 Earnings Guidance range of $2.15 to $2.55 per basic share (excludes impact of 2012 Texas Rate Case) • Key variables: • Base revenue growth of (0.5%) to 1.5% • Underlying growth range of 1.5% to 3.5% was adjusted to normalize for 2011 weather • Increase between 1.0% to 2
Slide 29: Appendix
March 2012 Investor Relations 29 Appendix
Slide 30: 2011 Accomplishments
2011 Accomplishments • Financial and Regulatory • Earnings per share (Basic) increased from $2.08 in 2010 (before extraordinary gain) to $2.49 in 2011 • Paid first common stock dividend since 1989 • Repurchased almost 2.8mm shares of common stock at a cost of $86.5mm which enhanced shareholder value
Slide 31: Summary of Texas Rate Base Changes
Summary of Texas Rate Base Changes March 2012 31 Investor Relations (000's) Texas Rate Base in Docket 37690 $ 862,567 Changes in Rate Base: Net Production Plant $ 186,982 Net Distribution Plant 64,529 Net Other Plant 4,596 Total Net Plant $ 256,107 Working Capital 15,924 Accumulated Deferred Income
Slide 32: Texas Jurisdictional Cost of Service Compared to Docket 37690
Texas Jurisdictional Cost of Service Compared to Docket 37690 March 2012 Investor Relations 32 09/30/2011 Plant Related (000's) (000's) Revenue Weather (12,760)$ Revenue growth 1) 67,582 Total Revenue 54,822$ Cost of Service O&M 27,922$ (1,737)$ 2) Depreciation 9,679 9,679 Other Taxes 648 5,315 Inco
Slide 33: 4th Quarter and YTD 2011 Financial Results
4th Quarter and YTD 2011 Financial Results • 4th Quarter 2011 (Basic) EPS - $0.14, compared to 4th Quarter 2010 (Basic) EPS of $0.18 • YTD 2011 (Basic) EPS - $2.49, compared to YTD 2010 (Basic) EPS of $2.08, before extraordinary item March 2012 Investor Relations 33
Slide 34: 2011 Key Earnings Drivers
2011 Key Earnings Drivers • Positive Drivers • Retail non-fuel base revenues • Decreased income tax expense • Decreased weighted average number of shares outstanding • Increased transmission revenue • Negative Drivers • Increased planned maintenance outages and freeze protection upgrades at local pl
Slide 35: % Change in Retail Non-Fuel Base Revenues and MWh Sales
% Change in Retail Non-Fuel Base Revenues and MWh Sales March 2012 Investor Relations 35 *YTD values are as of December 31, 2011 0.9% 0.5% 6.8% 4.6% 5.0% 2.5% 0.8% 2.4% 1.0% 2.0% 8.2% 0.1% 7.6% 4.1% 3.6% 9.1% 0.0% 1.0% 2.0% 3.0% 4.0% 5.0% 6.0% 7.0% 8.0% 9.0% 10.0% Residential Q4 C&I Small Q4 C&I Lar
Slide 36: MWh Sales and Base Revenue Mix
MWh Sales and Base Revenue Mix March 2012 Investor Relations 36 C&I Small 34% C&I Large 8% Residential 41% Public Authorities 17% C&I Small 31% C&I Large 14% Residential 34% Public Authorities 21% Retail MWh Sales Retail Non-Fuel Base Revenues 12 Months Ended 12/31/2011
Slide 37: Texas Renewables
Texas Renewables • Requirements • Texas mandates EE to obtain renewable energy proportionate to its market share of Texas energy sales or approximately 2% of Texas energy sales; renewable energy requirement can be met through renewable generation or purchase of Renewable Energy Credits (REC’s) March
Slide 38: New Mexico Renewables
New Mexico Renewables March 2012 Investor Relations 38 • Requirements • EE is required to meet 10% of its current retail energy sales in New Mexico via renewables; escalates to 15% in 2015 and to 20% in 2020 • Must be from diverse sources – at least 20% solar, 20% wind, 10% other and 1.5% renewable
Slide 39: EE System Reliability
EE System Reliability March 2012 For 12 out of 13 years since 1999, EE’s distribution system has ranked No. 1 or No. 2 for system reliability indices as tracked by the PUCT 48.37 106.18 EE Avg of all TX Electric Utilities SAIDI 2011 SAIDI - System Average Interruption Duration Index Minutes of Inter
Slide 40: State Regulatory Commissioners
State Regulatory Commissioners March 2012 Investor Relations 40 Public Utility Commission of Texas - Appointed by Governor Name Position Term Ends Party Donna L. Nelson Chair 08/31/2015 Republican Kenneth W. Anderson Commissioner 08/31/2017 Republican Rolando Pablos Commissioner 08/31/2013 Republica